P. Pakhlov (ITEP) presented by G.Pakhlova EKLM status  Reminder: EKLM general layout & past years activities  Key challenge of this year: assembly and.

Slides:



Advertisements
Similar presentations
Previous training sessions by our Consultants 1/9/20141 Presented by Achieve Strategies International.
Advertisements

1 A first design of the PEP-N Calorimeter A first design of the PEP-N Calorimeter Presented by P. Patteri Laboratori Nazionali di Frascati INFN for PEP-N.
n-DVCS/E status report
Development of scintillation detectors with MRS APD light readout for CBM Muon system and ECAL preshower Alexander Akindinov ITEP(Moscow) on behalf of.
An improvement of radiation hardness of CMS Hadron Endcap Calorimeters under increased LHC luminosity Joint Institute for Nuclear Research, Dubna, Russia.
Prototype sPHENIX Calorimeters
SNS Spallation Neutrino Source 1 SNS layout GeV proton linear accelerator Accumulator ring Main target Stripping foil.
Proposal for RENO-50 Soo-Bong Kim (KNRC, Seoul National University) “International Workshop on RENO-50, June 13-14, 2013”
MICE Collaboration MTG IIT – Feb 2002 The Fiber Tracker Option for MICE Spectrometers The D0 Central Fiber Tracker – Experience and Implications for MICE.
Forward scintillators in ATLAS: cryostat and MBTS CERN Dubna Michigan State University University of Texas-Arlington presented by J. Huston Michigan State.
SoLID EC Design for IHEP 2012/10. Basic Features of Preliminary Design Based on COMPASS Shashlyk module design. 0.5mm lead/0.12mm air gap/1.5mm scintillator/0.12mm.
CMS Outer Hadron Calorimeter (HO) Project Naba K Mondal Tata Institute, Mumbai, India.
03 Aug NP041 KOPIO Experiment Measurement of K L    Hideki Morii (Kyoto Univ.) for the KOPIO collaborations Contents Physics Motivation.
MICE Video MTG 9/25/2002 MICE Fiber Tracker Design Update Requirements and Proposed Detector Implementations A. Bross Fermilab.
Scintillator based muon upgrade / BELLE Super B Factory Workshop In Hawaii Jan 2004, Honolulu, Hawaii 1.Scintillator strip option 2.Geiger photodiodes.
Simulation of a Magnetised Scintillating Detector for the Neutrino Factory Malcolm Ellis & Alan Bross Fermilab International Scoping Study Meeting KEK,
Status of CLAS12 PCAL project
Panda PCB for prototype status report by D Malkevich on behalf of the ITEP group ITEP.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Status of scintillator KLM study P. Pakhlov (ITEP)
CALICE Meeting DESY ITEP&MEPhI status report on tile production and R&D activities Michael Danilov ITEP.
Cost for Large Liquid Scintillator Detector Ken Heller University of Minnesota Active Detector – Liquid Scintillator Target Material - Water Read Out –
LHCC, V0, Sept The V0 detector (Mexico Lyon collaboration)  Segmentation  Simulated performances secondaries / beam-gas  Counters design 1 /
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
SiPM: Development and Applications
Scintillator strip KLM detector (progress report) P. Pakhlov for ITEP group.
The Tungsten-Scintillating Fiber Accordion Electromagnetic Calorimeter for the sPHENIX Detector Craig Woody, for the PHENIX Collaboration Physics Department,
KLM summary P. Pakhlov (ITEP) Status of Geant4 simulation of scintillator KLM Status of Geant4 simulation of scintillator KLM by Gallina PAKHLOVA (ITEP)
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Electromagnetic Calorimeter for the CLAS12 Forward Detector S. Stepanyan (JLAB) Collaborating institutions: Yerevan Physics Institute (Armenia) James Madison.
Scintillator tile-SiPM system development for CALICE Engineering AHCAL Prototype Michael Danilov, ITEP & CALICE LCWS10 Beijing March 2010 Outline New scintillator.
1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.
RPCs of BESIII Muon Identifier  BESIII and muon identifier  R&D  Mass production  Installation Zhang Qingmin Advisor: Zhang Jiawen.
THE GAMMA-400 PROJECT Direct measurements of the primary gamma- radiation in the energy range 30 GeV – 1 TeV GAMMA-400 COLLABORATION: Lebedev Physical.
Mass production and mechanical structure P. Pakhlov (ITEP)
KLM detector for SuperB P. Pakhlov (ITEP) 1 st Open meeting of the SuperKEKB Collaboration.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
SCECAL progress report Tohru Takeshita (Shinshu) _DESY Beam Test summary _improvements for FNAL BT _FNAL module _current status at Fermilab.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Peter Sharp CERN CMS Tracker Summary of the Tracking Trigger Working Group Peter Sharp 21 November 2008.
Scintillator tile – SiPM development at ITEP Michael Danilov, ITEP CALICE Meeting, Casablanca, 23 Sep 2010.
SiPM for CBM Michael Danilov ITEP(Moscow) Muon Detector and/or Preshower CBM Meeting ITEP
Simbol–X workshopMay 14th, 2007 The Simbol-X Detector Payload P. Laurent CEA/Saclay & APC.
Muon triggering system for the ALICE TOF cosmic tests for the ITEP Moscow: A.Akindinov Yu.Grishuk S.Kiselev D.Mal’kevich M.Ryabinin A.Smirnitski K.Voloshin.
SiD Muon Detector Progress. Overall concept 2 There are slots in the iron. We will insert modules of orthogonal strips of appropriate size into the slots.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
Scintillator strip KLM detector for Super Belle P. Pakhlov for ITEP group Outline: Motivation for new detector Proposed setup Geiger APD as photodetector.
Baby MIND, Large Area Trigger Counters E. Noah WA105 General Meeting 21 January 2015.
US Belle II Project – Technical Elements David Asner Pacific Northwest National Laboratory.
Baby MIND Scintillator modules 11 November 2015 Revision E. Noah.
B-KLM DAQ 2011/01/25 Trigger/DAQ workshop K. Sumisawa (KEK) Introduction Summary +7 pages.
SuperB workshop SLAC, October 6, Outline Present Design Some thoughts about tile production Updated cost estimate Light yield studies of 3 mm thick.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
WBS 1.04 KLM Leo Piilonen Virginia Tech. Talk Outline WBS Element Scope Performance Requirements Cost Summary Schedule Risks Summary January 2014Leo.
Prototype Assemblying, SiPM Characterization and QC
Roman Mizuk (ITEP, Moscow)
WBS 1.03 Readout Systems Scope, Cost and Schedule
EKLM: Progress and prospects
Gamma-ray Large Area Space Telescope ACD Final Performance
IHEP group Shashlyk activity towards TDR
Gamma-ray Large Area Space Telescope
Prototype activities update
News on second coordinate readout
Han Jifeng BESIII MUON GROUP IHEP, CAS
ITEP&MEPhI status report on tile production and R&D activities
Scintillator-based endcap KL and muon
西村美紀(東大) 他 MEGIIコラボレーション 日本物理学会 第73回年次大会(2018年) 東京理科大学(野田キャンパス)
Presentation transcript:

P. Pakhlov (ITEP) presented by G.Pakhlova EKLM status  Reminder: EKLM general layout & past years activities  Key challenge of this year: assembly and installation  Future and current tasks: electronics, firmware, tests, software  Summary KEK, 20 June, 2014

EKLM general layout 14 forward + 12 backward layers 2 backward outermost layers are filled with shielding: not useful for physics, higher background from backward side 104 sectors should be installed + 6 spare = 110 sectors to be assembled The new system should fit the existing mechanical structure, including sector’s frame and cover sheets 20/06/20142/19

EKLM general layout Scintillator strips are produced by “Uniplast” (Vladimir, Russia); this vendor produced scintillator for HERA-B & LHCb’s ECAL; near sub detector T2K; WLS fiber is Kuraray WLS Y-11(200)MSJ multi-clading 1.2mm diameter; SiPMs: Hamamatsu’s MPPC S C, 1.3×1.3mm 2 ; specially designed for T2K near detector; chosen as the most radiation hard among several vendors; The base element is a scintillator strip; Scintillator light is collected by WLS fiber and transported to the photodetector: SiPM SiPM matrix Minor thing: optical gel SUREL(St.Petersburg, Russia); connectors are produced by “Uniplast” 20/06/20143/19

Scintillator modules mass production 15 strips are glued to modules, convenient for transportation and assembly production was carried out in ITEP for 1.5 years August’12 – December’13 WLS fiber is processed (cut, milled, mirrored, glued to connector) and then glued with optical gel to the strips groove in total strips/ 1100 modules were produced 20/06/20144/19

Average light yield from near & far ends is 2 times larger than assumed for TDR: 50 p.e. from near end (average over ~8000 long strips) vs 24 p.e. achieved at R&D for TDR Rejection threshold is 1.3 times larger than assumed TDR value Strips quality In total ~2% of produced strips were rejected. Light yield in p.e. # of strips long strips (>2m) rejection threshold short strips (<2m) Improved light collection efficiency is a warranty of robustness of the system against radiation damage, high background rate and of better physics performance. 20/06/20145/19

of the first half of 2014 was/is The main task assembly and installation it is almost done! 20/06/20146/19

Logistics Scintillator modules; support net & fixings shipped from ITEP Frame & Al covers used from the old RPC system; important stage was disassembly of RPC Cables & connectors purchased by KEK; crimped at assembly Preamplifiers purchased by VPI; pig tail soldering and tests at Wayne State U. SiPMs purchased by KEK 20/06/20147/19

Logistics Shipping from ITEP: no big problems except for loss of one sector (sent 110  found at KEK 109)? If fail to find, one spare sector less. minor damages that are repaired at assembly: several SiPM-fiber connectors become loose  glued with epoxy; few nodes of I-beam support net get unstuck after many moves from place to place  glued with cold welding. Shipping of preamplifiers Wayne State U. did not deliver the required soldering & test rate  solved with the kind help of KEK (Ushiroda & Sumisawa): ½ is soldered at Wayne + ½ is soldered by a company, recruited by KEK; test of preamplifiers during assembly by ITEP staff. Much bigger problem was discovered recently: because of 5% dead preamps channels and/or insufficient amount of order, preamplifiers for the last 12 sectors lost. The new batch of missing preamps have been ordered by Wayne SU in May, but they will be produced and shipped to KEK only by the end of July. This delays the completion of assembly and installation by 3 months  interference with CDC group. 20/06/20148/19

Preparing frames Deinstallation of forward/backward EKLM RPC modules was carried out in April’13/January’14 Dismounting RPC forward/backward was carried out in November’13/January’14 Processing & preparing frames to reuse done by ITEP technicians November’13– May’14 new holes were drilled, old ones sealed in 112 frames + 8 spare frames will be used to fix polyethylene (note: ×2 more effective than polystyrene) shield in 2 outermost backward layers 20/06/20149/19

Assembly 20/06/201410/19

Assembly By now produced: 90 (out of 110/109) sectors fully assembled; + 12 sectors half-assembled (no preamplifiers) will be finished in one week, to be resumed for one more week in September Started November’13, still ongoing. 20/06/201411/19

Installation 2 sectors were installed in backward EKLM in May’13: test installation. 56 sectors were installed in forward EKLM in April’14: the company worked very efficient – it took only ~ 1.5 week; and very carefully – only one outer connector was broken, immediately repaired. 46 backward sectors to be installed in fall campaign. Tests After installation test with oscilloscope that all channels are live and cosmics is seen at proper rate (>1 Hz at 20 p.e. threshold); No quantative tests of light yield is still possible. 20/06/201412/19

Neutron background rate with conservative TDR estimate and with MC simulation (still underestimates neutron background) are roughly consistent, while the MC neutron radiation doze accumulated by SiPMs is ~100 times smaller than in TDR: It was recognized recently (thanks to our COMET colleagues), that in MC simulation we have ignored the important Birks' law! We naively implied that ionization energy converts to scintillation light linearly independent of ionization source, while Birks' law predicts much smaller (factor of 5-7) light yield for neutron- induced (low energy proton) scintillation compared to MIP. Hopefully, this solves the puzzle! The long-standing MC puzzle: 20/06/201413/19

DAQ & cosmics tests Minimal firmware at DAQ boards is provided by Hawaii group, which allow to start the system: set HV, thresholds, read out to COPPER. However, to take full advantage of the created KLM (both EKLM and BKLM) system (maximum efficiency, optimal background suppression, robustness, use of the excellent time resolution and amplitude information) much more work on implementation of extra firmware is required: - calibration, adjustment of HV and thresholds, trigger, fit of the signal Plan to start immediately after finish of backward EKLM installation. Need to involve experts from T.Shevchenko INR (Kiev, Ukraine), who are ready to work full time for this job + cooperation with VPI (D.Liventsev). 20/06/201414/19

Summary 20/06/201415/19 The important stage is almost finished! After final installation, a hard work on commissioning is expected. However, it is time to many people, who made good job

for extremely effective organization of all logistics issues at KEK, (de)installation, disassembly and many-many other important contributions without which it would be impossible to work for our group for training of all new ITEP assembly shifts, work on electronics and after- installation tests, coordination of work between ITEP-KEK-WayneSU-VPI-Hawaii Sumisawa san for their daily work on assembly & 20/06/201416/19 Dmitry Liventsev

Ushiroda san Leo Piilonen David Cinabro 20/06/201417/19 Gary Varner

20/06/201418/19 to ITEP engineers who worked on R&D, construction, mass production…

20/06/201419/19 to ITEP stuff & David Besson K.Belonozhenko, B.Bobchenko, Y.Kuznetsov, S.Mineev, O.Kachalina, Y.Novozhlov, E.Novikov, A.Semennikov, A.Frolov, S.Veselov from MEPhI T.Aushev, K.Chilikin, R.Chistov, M.Danilov, A.Drutskoy, P.Katrenko, R.Mizuk, G.Pakhlova, P.Pakhlov, E.Solovieva, I. Tikhomirov, T.Uglov