SDG&E PI-based Substation Real-Time Condition Based Maintenance System

Slides:



Advertisements
Similar presentations
IBM SMB Software Group ® ibm.com/software/smb Maintain Hardware Platform Health An IT Services Management Infrastructure Solution.
Advertisements

A Path breaking Technology for Network Maintenance and Optimization
Helping Customers Lower TCO through Flowserves Technology Advantage Helping Customers Lower TCO through Flowserves Technology Advantage Web Portal Web.
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department.
1 Smart Grid Vision Electric Grid Modernization Steering Committee Grid Facing Technology Subcommittee January 14, 2013.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
Terry Chandler Power Quality Thailand LTD PQsynergy 2011 Chiang Mai, Thailand Sept 2011WWW.powerquality.co.th1.
PSE&G Condition-Based Maintenance
VSE Corporation Proprietary Information
Vendor Briefing May 26, 2006 AMI Overview & Communications TCM.
© 2008 OSIsoft, Inc. | Company Confidential Asset Management, Decision Making and Counter/Condition Based Maintenance at PSE&G Richard Wernsing – PSE&G.
Building A Smarter Grid Through Distribution Automation DOE Projects OE & OE April 2013 Copyright © 2012 Consolidated Edison Company of New.
Confidential and Proprietary May 7, 2015 Real-Time Data Where You Can Use It.
© 2008 Eventure Events. All rights reserved. SAP Embraces the Smart Grid: A Rational Approach to Integration Debra Henderson Joshua Roper.
Xanthus Consulting International Smart Grid Cyber Security: Support from Power System SCADA and EMS Frances Cleveland
Optimize Asset Implementation and Availability Using Condition Based Maintenance Tom Hosea, OSIsoft.
Asset Optimization and Condition Based Maintenance
SmartMeter Program Overview Jana Corey Director, Energy Information Network Pacific Gas & Electric Company.
Integrating work flows of five utilities utilizing Oracle’s WAM
AMA FiT4HANA Designed for Big Data
Empowering Business in Real Time. © Copyright 2009, OSIsoft, LLC. All rights Reserved. Regional Seminar Series Houston October 28, 2009 Flowserve’s Technology.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager.
© 2011 Infotech Enterprises. All Rights Reserved We deliver Global Engineering Solutions. Efficiently.August 8, 2015 Infotech Service Offerings Rajnish.
Creating Business Impact | Providing Expert Solutions | Delivering Quality Consistently | Building Partnerships Globally Presented by: Vidyalankar Nidamarthy.
TIMKEN Bearing Diagnostics and Prognostics Using PI Reducing Unplanned Downtime Rich Browner - Program Manager Reliability Solutions The Timken Company,
FUTURE IN ENERGY. The biggest co-generation high efficiency power plant in Romania, built in Suceava Investment value: over EUR 90 mil Used fuels: natural.
“Collaborative automation: water network and the virtual market of energy”, an example of Operational Efficiency improvement through Analytics Stockholm,
Transformer Asset Management
Smart Grid Technologies Damon Dougherty – Industry Manager.
The Utilization of GIS Technology at Northeastern REMC Presented By: Steven Weber, GISP Northeastern REMC (260)
© 2008 OSIsoft, Inc. | Company Confidential Analytics and Notifications Michael Hesselbach Beth McNeill Michael Hesselbach Beth McNeill.
Fleet Performance and Reliability in Generation Utilities
1 PredictiveOnLine PREDICTIVE SYSTEMS ENGINEERING Vintec Knowledge Ltd.
Summary Device protocols tied intimately to applications. A need to significantly reduce critical data update times. Current network bandwidth consumption.
FirstEnergy / Jersey Central Power & Light Integrated Distributed Energy Resources (IDER) Joseph Waligorski FirstEnergy Grid-InterOp 2009 Denver, CO November.
Condition-based Maintenance Across the Enterprise
Common Information Model and EPRI Smart Grid Research
The Smart Grid Enabling Energy Efficiency and Demand Response Clark W
EDISON INTERNATIONAL® SM SCE Project Story CIM User Group 10/12/2010 Jim Horstman Southern California Edison.
Cullen College of Engineering RFID-Based Solutions for Piping Technology Piping Tech & UH July, 2007.
CIMug Asset Health Focus Community Update for European CIMug Meeting June 19, 2014 Pat Brown EPRI.
Leveraging Big Data to Drive Big Changes in a Big Way Don Guckert, P.E., APPA Fellow Associate Vice President & Director of Facilities Management The University.
Empowering Business in Real Time. © Copyright 2009, OSIsoft, LLC. All rights Reserved. Value of Partnerships and Collaboration for World Class Performance.
A First Look at WirelessHART ® An e-book by Pepperl+Fuchs.
Monitoring EMS Infrastructure Ann Moore San Diego Gas & Electric September 13, 2004 EMS Users Group Meeting-St. Louis.
Value now. Value over time. © Copyright 2010, OSIsoft, LLC All rights Reserved. Enabling Data Infrastructure for Utility Sustainability John Lacy November.
Smart Grid Workforce Education Presentation Smart Grid – A Framework for Change Brad Gaskill, CEO - Poudre Valley REA May 29, 2009.
Tier 2 Power Supply Planning Workshop Advanced AMI Benefits Overview.
IT Priorities Minimize CAPEX Maximize employee productivity Grow the business Add new compute resources real- time to support growth Meet compliance requirements.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Digital recordkeeping strategy for mobile work processes Joel Smith HPRM System Administrator.
CONTENTS: 1.Abstract. 2.Objective. 3.Block diagram. 4.Methodology. 5.Advantages and Disadvantages. 6.Applications. 7.Conclusion.
Metering Americas April 24, 2006 Advanced Metering.
1 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group via LiveMeeting June 18, 2008 Transmission & Distribution Webinar PI for Asset Model and.
Presented by The Emerging Role of the PI System in Caterpillar’s Condition Monitoring Service David Krenek – Global Petroleum Market Professional.
ACEC National Energy and Environment Challenges in Asset Management? Brian Long Transmission Line Performance Xcel Energy August 15, 2015.
Distribution Automation The utilization of IEDs (Intelligent Electronic Devices) and advanced communications to unlock the benefits of operational efficiency.
CURRENT ® Smart Grid Overview July SMART GRID = ENHANCED FUNCTIONALITY Smart Grid delivers more than advanced metering infrastructures: -safe.
Artificial Intelligence In Power System Author Doshi Pratik H.Darakh Bharat P.
A Future Oriented Data Platform for the Electric Power Grids
How SCADA Systems Work?.
A transformer is a complex protective object
H.O.M.E. Home Organization and Monitoring of Energy
Peter Erning, PSP-T11, Power Gen 2010
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Smart Grid Overview] Date Submitted: [13.
Your Solution for: Energy Smart Management Real Time Power Monitoring Fuel Theft Prevention Technical presentation.
Cyber Security of SCADA Systems Remote Terminal Units (RTU)
Using CIM and PI AF for Model-Driven Asset Management
Power monitoring software
Presentation transcript:

SDG&E PI-based Substation Real-Time Condition Based Maintenance System Neal Bartek, Project Manager Subbu Sankaran, Software Team Lead - San Diego Gas & Electric Company

Agenda Sempra Utilities OpEx 20/20 Smart Grid & CBM CBM Business Case CBM Project Scope CBM System Components How PI is used in CBM PI CBM Examples CBM Benefits

Sempra Utilities OpEx 20/20 In 2006, a team of employees developed a roadmap to prepare company for future success. The plan includes a renovation of the systems that support our operations. These initiative were named: The program’s technology and process improvements will enable our utilities to continue to deliver our commitment of Operational Excellence. 20/20 symbolizes a clear, sharp vision guiding our efforts.

OpEx 20/20: Smart Grid Program Condition Based Maintenance (CBM) Outage Management System / Distribution Management System (OMS/DMS)

What is CBM? Start 2008, Go-live 2008 Use technology (HW/SW) to measure the condition and performance of equipment to make better maintenance decisions CBM Diagnostics detect potential problems before they occur Optimizing equipment utilization based on predictive history, etc. Equipment can be repaired before failure Sensors will provide diagnostic information to facilitate capacity and reliability maintenance. Start 2008, Go-live 2008

CBM Business Case What does CBM do for SDG&E? Improve asset utilization Provide actionable data to support decisions Allows capital expenditures to be deferred Shift from time-based to Condition Based Maintenance should reduce overall maintenance activity Proactive “As-Needed” maintenance (less time based) Improve efficiency of maintenance activities Reduction in time required to complete maintenance on equipment through better knowledge of equipment condition Reduction in unplanned maintenance work Reduction in cost to collect condition data by manual means Reduction of field equipment inspections

Project Scope: Phase 1 Implement CBM for two substations by October 2008 Implement sensors and data collection at 2 substations (1 Distribution & 1 Transmission) Distribution Substation 2 transformers Transmission Substation 3 transformers 24 gas breakers Implement back office data collection infrastructure, notification mechanisms and initial data analytics

Project Scope: Phase 2 Implement CBM for remaining 123 substations 102 Distribution Substations over 7 years 226 Distribution Transformers 194 Gas Circuit Breakers 21 Transmission Substations over 5 years 49 Transmission Transformers 26 Distribution Transformers 185 Gas Circuit Breakers Integrate with enterprise systems and evolve/refine analytics

CBM Implementation Phase 1 Timeline January February March April May June July August Sept. Oct. Nov. Dec. Project Checkpoints Kick Off Solution Recommendation Design Sign-off Construct Build Sign-off User Acceptance Sign-off Develop High-Level Requirements Requirements Development Develop RFP Solution Selection Selection Process Design Processes Develop Detailed Processes Design Processes Design Phase Build Phase Build Phase Testing Testing and User Acceptance Training and Rollout User Training - phase

System Requirements System Features Technical Requirements Product Flexibility, Scalability and Manageability Functional Requirements How the product meets the needs of our business Strategic Plans Roadmap for the future Implementation Plan Capability to meet the schedule and project plan Support Supplied Support structure and availability

CBM Vision Diagram

What does CBM monitor on Distribution Transformers? Oil Temperature Top Oil Bottom Oil Winding Hot Spot Temperature (Calculated) LV Load Current Ambient Temperature Eight gas DGA Cooling System Manager / Monitor HV Bushing Power Factor LV Bushing Power Factor LTC Position Indication & Operations Counter LTC Motor Energy Conservator Integrity Provide Break-Out of Miscellaneous Bank Alarms Detect Loss of Cooling Fans/Pumps Detect Failed Control Contactor for Cooling Fans/Pumps Collect Data on Run Hours for Fans/Pumps

What does CBM monitor on Distribution Transformers? Oil Temperature Top Oil LTC Main Tank / LTC Differential Winding Hot Spot Temperature (Calculated) LV Load Current Ambient Temperature Hydrogen / Moisture Monitor Cooling System Manager / Monitor LTC Position Indication & Operations Counter LTC Motor Energy Monitor HV Bushing Power Factor Monitor On-line Main Tank 3 gas DGA On-line LTC Tank DGA Monitor LTC Vacuum bottle integrity Nitrogen Pressure Detect Loss of Cooling Fans/Pumps Detect Failed Control Contactor for Cooling Fans/Pumps Collect Data on Run Hours for Fans/Pumps

What does CBM monitor on Transmission Gas Breakers? Gas Pressure / Density Ambient Temperature Air Compressor / Hydraulic Motor Hour Meter (optional-not in use)

What is a Substation Gateway? Controls and monitors communication from multiple Sensors and Intelligent electronic devices over multiple protocols Uses dead banding to minimize bandwidth requirements Manage, maintain and configure your substation equipment remotely Upgrade Substations without Having to Replace RTUs Integrate existing and legacy RTUs, IEDs, PLCs, as well as multiple control centers Add new network technologies and protocols without sacrificing data or legacy devices Prepare for NERC CIP compliance with the Gateway’s security features

What is an Enterprise Gateway? Controls and monitors communication from multiple substation gateways – similar to a SCADA approach Centralizes Security Active Directory Authentication for all 125 substation gateways Encryption with the substation gateway Remotely manages firmware/configuration to IEDs or gateways Maps the data points/tags automatically to the PI System Interfaces with the PI System

How CBM PI System is used Collects and stores time-series data Controls communication from Enterprise Gateway to PI Provides Analytics (ACE) and Visualizations (WebParts) Visualizes graphing, trending and analytics Maps data points automatically from Enterprise Gateway Integrates with T&D Operations PI System Integrates with Legacy applications (Phase 2) Sends PI Notifications and Acknowledgement Serves as a CBM Model server

How PI Is Used for a CIM Model Server Utilize PI capability to create a structure (model) for PI tags and Module Database Analysis Framework The structure allows tag data to be put into a meaningful context In Phase 1, the model is quite simple - a subset of the IEC 61970 Common Information Model Phase 2 includes a more complete model to allow CBM data to be accessed within a variety of contexts

SDG&E CBM CIM Asset Model

CBM Modeling (PI MDB) Once the model is loaded into PI, users access tags using a hierarchical tree based on the model

CBM Modeling (PI AF)

Benefits of the Model-Driven Approach Creates an open environment for CBM application development Users can easily develop custom applications Model enables the creation of navigation trees Navigate to data instead needing to remember the tag names Builds a model-aware application development PI Based CBM applications can focus on specific problem areas such as a particular asset type or operating history

PI Notifications

CBM PI Email Notifications

PI ACE Background ACE Jobs Alarm Tags Generation Transformer Oil Analysis Alarm Summary Alarm Increase Reports Alarm Decrease Reports

CBM Future Integration CBM PI Analytics SCADA CBM PI Server

PI Implementation Examples

Transformer Overview

Bushings

Dissolved Gas Analysis

LTC Overview

Thermal/Cooling

SF6 Gas Circuit Breakers

Summary SDG&E Real-Time CBM Project is the first-of-its-kind in the industry – end-to-end from substation sensors to backoffice analytics and visualization CBM moves SDG&E one step closer to meeting its objectives: Increase asset utilization Do the right maintenance, on the right piece of equipment, and at the right time Leverage technology to make business processes more efficient