Sub-Synchronous Oscillations* ERCOT Comments on NPRR 562

Slides:



Advertisements
Similar presentations
High Resolution studies
Advertisements

Safety Update This presentation covers Machinery Directive 2006/42/EC
National Emerging Infectious Diseases Laboratories Risk Assessment
Copyright © 2008 by the McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Managerial Economics, 9e Managerial Economics Thomas Maurice.
Author: Graeme C. Simsion and Graham C. Witt Chapter 4 Subtypes & Supertypes.
Flood Risk Analysis – the USACE Approach
Submission Page 1 January 2002 doc.: IEEE 802.RR-02/018A-d1 Andrew Myles, Cisco Systems Report of ad hoc group relating to DFS and JPT5G proposal Andrew.
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
1 Acceptable Levels of Safety Severity Classification Likelihood Classification Risk Classification Scheme Safety Objective Classification Scheme Regulations.
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
You will need some paper!
CS1512 Foundations of Computing Science 2 Week 3 (CSD week 32) Probability © J R W Hunter, 2006, K van Deemter 2007.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
1 How to Enter Time. 2 Select: Log In Once logged in, Select: Employees.
In this section you will:
Chapter 13 Overall Audit Plan and Audit Program
Chapter 10: The t Test For Two Independent Samples
Non-Parametric Statistics
Standard Market Design (SMD) in New England Federal Energy Regulation Commission Conference on Standard Market Design January 22, 2002 David LaPlante Vice.
Business and Economics 6th Edition
A Key to Economic Analysis
RISK ANALYSIS.  Almost all of the things that we do involve risk of some kind, but it can sometimes be challenging to identify risk, let alone to prepare.
Determining the Significant Aspects
Copyright © Cengage Learning. All rights reserved. 7 Probability.
Chapter 4 Inference About Process Quality
Doug Tucker Associate Staff Engineer TRD/TADS update and Future reporting.
Probabilistic Volatility in the Western Interconnection Matthew Elkins.
Balancing Update Stakeholder Group Meeting - 4 November 2009.
Risk Management & Real Options VI. Diversification Stefan Scholtes Judge Institute of Management University of Cambridge MPhil Course
Air Transport Association of Canada A presentation by John McKenna ATAC President and CEO.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
1 CDBG Citizen Participation For Grant Administrators.
Internal Control–Integrated Framework
Hazard Mitigation Planning I Session Name: Hazard Mitigation Planning I Coastal Hazards Management Course Signed by the President on October 30, 2000 Amends.
High School Graduation Network Meeting April 21,
Commonwealth Connector Pharmacy Benefits July 12, 2007.
Warm Up Express the indicated degree of likelihood as a probability value: “There is a 40% chance of rain tomorrow.” A bag contains 6 red marbles, 3 blue.
Copyright © 2010 Pearson Addison-Wesley. All rights reserved. Chapter 10 One- and Two-Sample Tests of Hypotheses.
Cope: 343 Occupational Health and Safety Training — Level 1 Workplace Inspections Version 5.
Highways Agency (DRAFT) Significance Guidance: Review and Discussion 15 November 2012 Mark Chapman Technical Director (Air Quality)
Chapter 11: The t Test for Two Related Samples
Testing Hypotheses About Proportions
TMS-RA04-A-01-02Page 1 of 20 The Risk Assessment Process.
Chapter 4 Basic Probability
Copyright ©2011 Pearson Education 4-1 Chapter 4 Basic Probability Statistics for Managers using Microsoft Excel 6 th Global Edition.
Chapter 4 Basic Probability
Don Cole Risk Assessment and Mitigation Project Management for ARA Engineers and Scientists.
Small Signal Stability Analysis Study: study prepared by Powertech Labs Inc. for ERCOT Vance Beauregard AEP 9 April 2002.
ERCOT John Adams September 14, 2012 Planning Guide concepts for dealing with Sub Synchronous Resonance in ERCOT & other issues.
Copyright © Cengage Learning. All rights reserved. 8 Tests of Hypotheses Based on a Single Sample.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
ERT 312 SAFETY & LOSS PREVENTION IN BIOPROCESS RISK ASSESSMENT Prepared by: Miss Hairul Nazirah Abdul Halim.
Go With the Flow: Improving Red Cross Bloodmobiles Using Simulation Analysis by: John Brennan, Bruce Golden, Harold Rappoport Prepared for BMGT 808U.
Copyright ©2014 Pearson Education Chap 4-1 Chapter 4 Basic Probability Statistics for Managers Using Microsoft Excel 7 th Edition, Global Edition.
Business Statistics: A First Course, 5e © 2009 Prentice-Hall, Inc. Chap 4-1 Chapter 4 Basic Probability Business Statistics: A First Course 5 th Edition.
September 25, 2012 Planning Working Group - PLWG Sub-Synchronous Resonance Protection & Mitigation John Adams Principal Engineer.
Basic Business Statistics Assoc. Prof. Dr. Mustafa Yüzükırmızı
Basic Business Statistics, 11e © 2009 Prentice-Hall, Inc. Chap 4-1 Chapter 4 Basic Probability Basic Business Statistics 11 th Edition.
1 ERCOT LRS Sample Design Review PWG Presentation March 27, 2007.
Operations Report Kent Saathoff System Operations ERCOT.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Subsynchronous Resonance Update Jeff Billo, Senior Manager ERCOT Transmission Planning February 3, 2016 Wholesale Market Subcommittee 1ERCOT Public.
Lone Star Transmission Presentation on SSR Blair Giffin Operations Engineer September 9, 2013.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
FREQUENCY DISTRIBUTION
Phase Angle Limitations
Chapter 4 Basic Probability.
ITEC 202 Operating Systems
Air Carrier Continuing Analysis and Surveillance System (CASS)
Transmission Planning in a Modern Market Environment
Presentation transcript:

Sub-Synchronous Oscillations* ERCOT Comments on NPRR 562 Jonathan Rose Resource Integration Department April, 2014 * Sub-Synchronous Resonance is more precisely called Sub-Synchronous Oscillations.

Presentation Overview This presentation covers… Why ERCOT is proposing changes to NPRR562 Better data has allowed a RELAXATION in the requirements. The need for PROTECTION.

ERCOT has received additional data Reason for Change ERCOT has received additional data Detailed outage records from Oncor and AEP show: Duration of outages is LESS than originally assumed. Double circuit outages are LESS frequent than originally assumed. A modest relaxation in requirements is possible.

Outage Statistics The data indicated a typical 345 kV line experienced an outage… Only 15% of outages on double circuit lines involve both circuits concurrently. Thus double circuit concurrent outages have a significantly lower probability than single circuit outages. Type Outage Frequency (Times / year) Outage Duration (Hours/Outage) Single Circuit 3.0 54 Concurrent Double Circuit 0.3 56 Concurrent Double Circuit Outage – An overlapping outage such that there is a point in time when both circuits of a double circuit line are outaged together.

Mitigation: Redesign of system to prevent SSO. NPRR 562: Types of Action Mitigation: Redesign of system to prevent SSO. Enables generator to operate normally even under elevated transmission outages. Protection: Switching action to avoid impending damage. Result in generator tripping, transmission bypass, etc. Outage Coordination: ERCOT avoids at-risk combinations when scheduling outages. Detailed Study: Determines SSO risk. SSO Screening Study: Estimates SSO risk. Increasing Action

Action commensurate with risk. NPRR 562: Risk and Action Action commensurate with risk. Risk gauged by likelihood of occurring (number of simultaneous transmission outages). Mitigation Protection Outage Coordination Detailed Study Screening Study Increasing Risk Increasing Action

First, a study is performed. Then, action considered. NPRR 562: Risk and Action Generator with very high risk situation may require MITIGATION, PROTECTION*, and OUTAGE COORD. Generator with high risk situation may require PROTECTION and OUTAGE COORD. Generator with moderate risk may require only OUTAGE COORD. A screening study which estimates only a slight risk might only require a detailed study to confirm. First, a study is performed. Then, action considered. Mitigation Protection Outage Coordination Increasing Risk Increasing Action Detailed Study Screening Study *If mitigation is deemed fully effective, then protection would not be required.

Proposed Changes to NPRR Original Proposed Action N-0 to N-5 (10 ckts) 0 – 6 ckts Detailed study. N-4 to N-5 (10 ckts) 4 – 6 ckts ERCOT outage coordination procedures. -- 4 ckts Protection required. N-0 to N-3 (6 ckts) 0 – 3 ckts Mitigation required.* Originally, double-circuits count as one simultaneous outage. NOW, circuits counted individually.  Double-circuits count as two simultaneous outages. For example, a gen 4 circuits away from SSO would require protection.  Four and five double circuits no longer considered credible scenario. NOW, protection is mandatory in some cases. Because ERCOT is proposing to substantially relax requirements, we would like a layer of protection in the marginal (4 ckts) risk level. * If mitigation not fully effective, then protection also required.

Probabilities The role of probabilities is to guide us when we don’t have good intuition. 12 transmission outages to reach SSO  safe to ignore. 4 transmission outages to reach SSO  2 transmission outages to reach SSO  action required!!! The extreme upper and lower ends of the risk spectrum are obvious in terms of action required. It’s the middle of the spectrum where we need probabilities to guide us.

Risk gauged by probabilities. Numerical Analysis Risk gauged by probabilities. Probabilities that a given set of n (single circuit) lines have overlapping outages. In a year… Once in 50 years at any of 20* units… Probability of Simultaneous Outages 1 2 3 4 5 6 90% 10% 0.2% 0.005% 0.0001% 2e-6% Notice these probabilities are very small. The probability of a particular set of 5 transmission lines experiencing a concurrent outage is very small. The lower table should be used for ERCOT policy decisions, because policy impacts multiple units. The reason why “20 units” will be explained. Probability of Simultaneous Outages 1 2 3 4 5 6 100% 90% 4.8% 0.1% 0.002% The lower table should be used for ERCOT policy decisions, because policy impacts multiple units over their lifetime.

Probability of Simultaneous Outages Risk versus Action Probability of Simultaneous Outages 1 2 3 4 5 6 100% 90% 4.8% 0.1% 0.002% Unlikely  no action required beyond a detailed study. ERCOT will perform outage coordination just in case. Possible  Protection required. Likely to occur  Mitigation required. Note overlapping layers of precaution. Mitigation may be used in lieu of protection. If mitigation were applied and shown to successfully eliminate risk, then protection would not be required.

Single versus Double circuits Only 15% of outages on double circuit lines involve both circuits. A double circuit outage is far less likely than a single circuit outage. Probability of Occurrence at Least once in 50 yrs* Singles Doubles Notice that a dbl ckt outage is in same ballpark as two single ckt outages. Two double circuit outages are in the same ballpark as 3 to 4 single circuit outages. Therefore, we may be able to simply and just talk about circuits. Probability of two double circuit outages occurring simultaneously is in-between the probability of three singles occurring and four singles occurring.  May be possible to simply and just talk about “circuits.” * At 20 vulnerable units.

This presentation covered… Presentation Summary This presentation covered… Why ERCOT is proposing changes to NPRR562 Better data has allowed a RELAXATION in the requirements. The need for PROTECTION.