Module 8: Government Required Reports

Slides:



Advertisements
Similar presentations
0 - 0.
Advertisements

Project Cost Management
Program Assessment Briefing (PAB) Instructions Chart 1: Overview Provide a narrative mission description – Self explanatory Provide executive level program.
The Topics that will be addressed in this Module include:
Module 3: Project Scheduling
M EASURING P ERFORMANCE – N EW R EQUIREMENTS FOR D O D P ROJECTS AND P ROGRAMS IPMR I NTEGRATED P ROGRAM M ANAGEMENT R EPORT (IPMR) (DID) DI- MGMT-81466B.
©2003 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
[Sample] Monthly Quad Chart as of MM, DD, YYYY G G Current Customer Business & Strategic Results R Yellow = Potential management action requiredRed = Management.
Addition 1’s to 20.
Monitoring and Controlling the Project
Chapter 15 Closing the Bid. Objectives Upon completion of this chapter, you will be able to: –Describe the estimate summary process –Describe items that.
Replanning, Reprogramming, and Single Point Adjustments July NAVY CEVM
1 What Is It ? Why Do I Need It ? How Do I Do It? Earned Value Analysis.
An Overview of Earned Value Management (EVM) Using EVM to Track Progress.
National Aeronautics and Space Administration ANSI/EIA-748-B Earned Value Management Systems (EVMS) 32 Guidelines ANSI/EIA-748-B Earned Value.
Monitoring and Control Earned Value Management (EVM)
Project Cost Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project Management.
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
Chapter 10: Monitoring and Controlling Change
Module1: Introduction to Earned Value
Degree and Graduation Seminar Cost Management
Section 4.0 Project Implementation. Factors that Ensure Success  Update the project plan  Stay within scope  Authorized change implementation  Providing.
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
Earned Value Management (EVM) Fundamentals
Monitoring and Controlling
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Earned Value Management Guidelines Tony Finefield Finefield Consulting CPM Webinar 5 September
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
Earned Value Analysis by John Cornman. Introduction “Earned Value Analysis” is an industry standard way to measure a project’s progress, forecast its.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Office of Project Management Metrics Report Presentation
Validating IPMRs, CPRs, and IMS Deliverables NAVY CEVM
Project Management Methodology Project monitoring and control.
Chapter 13: Progress and Performance Measurement and Evaluation
Information Technology Project Management – Third Edition By Jack T. Marchewka Northern Illinois University Copyright 2009 John Wiley & Sons, Inc. all.
Chapter 9 Project Communication, Tracking, and Reporting Copyright 2012 John Wiley & Sons, Inc. 9-1.
Dave Bachman DAU / CDSC September 9, 2004
PPMT CE-408T Engr. Faisal ur Rehman CED N-W.F.P UET P.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Earned Value Management Tutorial Module 5: EVMS Concepts and Methods Prepared by:
Management & Development of Complex Projects Course Code - 706
EARNED VALUE MANAGEMENT (EVM)
EVM Home Page = = “One Book” DAU POC: (703) (DSN 655) Address: Revised.
Management & Development of Complex Projects Course Code MS Project Management Earned Value Concepts Lecture # 19.
1 Alternative EVM Applications Not a One-Size-Fits-All.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
Earned Value as the Main Driver for Integrating Project Management Michael A. Hatfield PMP, CCC David J. Post PE.
Project Management 6e..
UU Master Class Earned Value 17 July Earned Value Contents What is Earned Value / Earned Value Analysis Why and where is it used A brief history.
EARNED VALUE MANAGEMENT (EVM) TUTORIALS
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
1 Earned value analysis Planned value (PV) or Budgeted cost of work scheduled (BCWS) – original estimate of the effort/cost to complete a task (compare.
Presented by Niyi Ladipo September 14,  Results of the Survey  What is Earned Value Management (EVM)?  EVM vs. Traditional Cost Management 
EVM – Do You Really Know What the Numbers Mean? Booz | Allen |Hamilton Seth Huckabee EVP, PMP, PMI-SP.
1 Understanding Earned Value in Under an Hour Breakout Session # A11 Name: Wayne Brantley, MS Ed, PMP, ITIL Senior Director of Professional Education.
EARNED VALUE  Earned Value Management Systems  Earned Value Analysis.
0 Earned Value Management. 1  What is it?  Where did it come from?  What’s so special about it?  How do you do it?  What is an EVMS?
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
EVM Home Page = Address: DAU POC: (703) (DSN 655) Revised December 2006 TERMINOLOGY.
October 11, EARNED VALUE AND PERFORMANCE MANAGEMENT.
Budget Planning.
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
Project Communication, Tracking, and Reporting
September 2016 EVM 202—Lesson 4 Integrated Baseline Review Process (Part 4: Baseline Maintenance)
Earned Value Management
Dave Bachman DAU / CDSC September 9, 2004
EVM 202—Lesson 7 Tools Analysis Case Study
Missile Defense Agency EVM Update
Monitoring and Controlling
Presentation transcript:

Earned Value Management Tutorial Module 8: Reporting Prepared by:

Module 8: Government Required Reports Welcome to Module 8. The objective of this module is to introduce you to Government required reports. The Topics that will be addressed in this Module include: Define Cost Performance Report (CPR) Define Cost/Schedule Status Report (C/SSR) Module 8 – Reporting

Review of Previous Modules In the previous seven modules, we discussed the framework needed to perform Earned Value and develop an Earned Value Management System (EVMS). In Module 1 we introduced you to earned value and the requirements for properly implementing an earned value management system (EVMS) In Module 2 we discussed the development of the work breakdown structure (WBS), organizational breakdown structure (OBS) and the integration of WBS and OBS in creating the responsibility assignment matrix (RAM) In Module 3 we discussed the development of the project schedule and the schedule baseline In Module 4 we discussed the development of the project budget and the cost baseline Module 8 – Reporting

Review of Previous Modules In Module 5 we discussed EVMS criteria and the three key components to earned value: Planned Value (PV) , Earned Value (EV) and Actual Cost (AC). In Module 6 we discussed Earned value metrics and performance measurements (CV, SV, SPI, CPI,etc.) In Module 7 we discussed the Integrated Baseline Review (IBR), rebaselining of a project and proper baseline control or change control Now let’s look at the Government reporting requirements for earned value. Module 8 – Reporting

Government Reporting Requirements There are several reports which may be used for Earned Value Management Reporting and Analysis. The most commonly used reports are: Cost Performance Report (CPR) Cost/Schedule Status Report (C/SSR) Let’s take a look at each type of report on the next page. Module 8 – Reporting

Cost Performance Report (CPR) The Cost Performance Report (CPR) is the most comprehensive of the EVMS reports. It is normally a monthly report and has five different formats. Format 1 Work Breakdown Structure (WBS) Format 2 Organizational Categories (OBS) Format 3 Baseline Format 4 Staffing (Manpower) Format 5 Variance Analysis Report Generally, all five formats are applied to a contract requiring EVMS. However, the customer may not require all the reports and may delete one or more. Most customers will require at least the CPR Format 1 (WBS) and Format 5 (Variance Analysis Report). Module 8 – Reporting

Cost Performance Report (CPR) All Performance Measurement data reported in the CPR are derived from the formal Earned Value Management System (EVMS). All reported changes to the project baseline, management reserve (MR) and contingency should be traceable through the formal Earned Value Management System (EVMS) and CPR reports. On the following pages, we will look at examples of the five CPR reports using the ACME House Building Project. Module 8 – Reporting

Cost Performance Report (CPR) - Example First let’s quickly review the projects current status that will be used in the example reports. ACME Home Building Project Project Start date: January 15th Status Date: January 31th EAC calculations used for the example will be based on the assumptions discussed on Page 35 and 36 of Module 6. See the charts to the right for an overview. Now let’s take a look at the Cost Performance Reports (CPR) on the next page. Module 8 – Reporting

Cost Performance Report (CPR) Format 1 - WBS The Cost Performance Report (CPR) Format 1 includes current period, cumulative, and at complete values for each WBS element. It also contains header data showing quantity, targets, ceilings, and Management Estimate At Completion (MEAC) calculations. This report also contains data about budget, price, Management Reserve (MR), Undistributed Budget (UB), and MEAC cases. A copy of the CPR Format 1 for the ACME Home Building project is on the following page. Please review the entire report but pay close attention to the lower section (highlighted red) of the report. This is the Performance data section that contains the current and cumulative cost and schedule information for the project. Module 8 – Reporting

Cost Performance Report (CPR) Format 1 - WBS Module 8 – Reporting

Cost Performance Report (CPR) Format 2 – Organizational Categories The Cost Performance Report (CPR) Format 2 includes current period, cumulative, and at complete values for each Organization (Performing or Responsible), It also contains header data showing quantity, targets, ceilings, and MEAC cases. This report also contains data about budget, price, Management Reserve (MR), Undistributed Budget (UB), and MEAC cases. The reporting details in CPR Format 2 are the same as on the CPR Format 1 accept that it is structured by organization. A copy of the CPR Format 2 for the ACME Home Building project is on following page. Please review the entire report but pay close attention to the lower section (highlighted red) of the report. This is the Performance data section that contains the current and cumulative cost and schedule information for the project. Module 8 – Reporting

Cost Performance Report (CPR) Format 2 – Organizational Categories Module 8 – Reporting

Cost Performance Report (CPR) Format 3 – Baseline Cost Performance Report (CPR) Format 3 displays a forecast of monthly changes to the Baseline, Management Reserve, and Undistributed Budget for the entire project, and contains header data showing schedule dates for the contract and the project. Module 8 – Reporting

Cost Performance Report (CPR) Format 4 – Staffing The Cost Performance Report (CPR) Format 4 displays a forecast of hours and person-months by Organization (Performing/Responsible), and contains header data showing schedule dates for the contract and the project. This report also contains program variance thresholds for month, cumulative, and at-complete percents and values. Module 8 – Reporting

Cost Performance Report (CPR) Format 5 – Variance Analyses Report The Cost Performance Report (CPR) Format 5 provides narrative explanation of cost, schedule, and other problems related to total contract, undistributed budget (UB), management reserve (MR), PMB, and manpower. The variance reporting thresholds are pre-determined prior to the start of the program. Explanations and problem analysis reporting is only required for those variances that breech the pre-set threshold(s). The report will indicate those variances needing explanation. A copy of the Variance Analyses Report is on the following page. The variance report uses the ACME Home Building project information. Module 8 – Reporting

Cost Performance Report (CPR) Format 5 – Variance Analyses Report Header information includes quantified cost and schedule variances and indicates out of tolerance items. Explanations may be required for monthly, cumulative, and at complete variances. Problem Analysis: This section is used to explain the variance drivers, abnormal conditions and factors creating variances, and other issues, problems, and concerns. Task/Project Impact: This section is used to explain the impact to the Control Account and overall Project. Corrective Action Plan: This section provides the recovery and risk mitigation plan. Module 8 – Reporting

Cost/Schedule Summary Report (C/SSR) The final standard EVMS report we will review is the Cost/Schedule Summary Report (C/SSR). The C/SSR (Cost/Schedule Summary Report) is used primarily for reporting cost and schedule summary data to the government or contractors on specific procurements. This report includes cumulative and at complete summaries for each WBS element, and contains header data showing contractor and contract information, and MEAC calculations. This report also contains data about contract price, budget, Management Reserve (MR), Undistributed Budget (UB), and MEAC cases. It is very similar to the CPR Format 1 except that the C/SSR has only cumulative information. A copy of the C/SSR for the ACME Home Building project in on the following page. Module 8 – Reporting

Cost/Schedule Summary Report (C/SSR) Module 8 – Reporting

There are two major formats for EVMS reports Review Module 8 At this point, you have covered all of the content in Module 8. Take some time now to review the major items: There are two major formats for EVMS reports Cost Performance Reports (CPR) Cost/Schedule Summary Report (C/SSR) The Cost Performance Report (CPR) has five formats: Format 1 Work Breakdown Structure (WBS) Format 2 Organizational Categories (OBS) Format 3 Baseline Format 4 Staffing (Manpower) Format 5 Variance Analysis Report CPR Format 1 and 5 are the most widely used The Cost/Schedule Summary Report (C/SSR) is similar to CPR Format 1 Module 8 – Reporting

At this point we have examined the basic reporting formats of EVMS. Summary of Module 8 At this point we have examined the basic reporting formats of EVMS. If you have a firm grasp of the concepts covered in this module, along with all provide modules, you have completed the EVMS tutorial. Otherwise, review this or any other module to ensure you have a solid understanding of the Earned Value Management. Congratulations, you have completed Module 8 and the EVMS tutorial. Module 8 – Reporting