Stormwater Rulemaking Briefing US Environmental Protection Agency.

Slides:



Advertisements
Similar presentations
creating a sustainable world The Chesapeake Bay TMDL A Policy Model for Nutrient Pollution Reductions James Noonan October.
Advertisements

NPDES Phase II Permit City of St. Louis Park Annual Storm Water Informational Meeting April 16, 2009 Scott Anderson Superintendent of Utilities.
Regulatory Overview Presented By: Wayne T. Craney, P.E.
1 Watershed Planning: A Key to Integrated Planning FHWA Environmental Conference Ann Campbell Wetlands Division.
The Urban Connection: NPDES and Storm Water in the State of Delaware Sandra M. Goodrow, Ph.D., C.F.M. Environmental Scientist IV Surface Water Discharge.
SW101 Municipal Separate Storm Sewer Systems (MS4s)
When It Rains, It Drains An Overview of Our Community’s New Storm Water Management Program.
Phase II Municipal Separate Storm Sewer System (MS4) Permits Patricia Foran & Cindy Hooper Storm Water & Pretreatment Team.
Antideg and Municipal Stormwater Discussion Sept. 23, 2009.
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
Stormwater Management/ MS4 Permitting International Municipal Lawyers Association 2014 Annual Conference Baltimore, Maryland Gene Tanaka
What is NPDES? “National Pollutant Discharge Elimination System”
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Update on Stormwater Regulation
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
Upper Providence Township Stormwater Management MS4 Program.
When It Rains, It Drains An Overview of Our Community’s New Storm Water Management Program.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
When It Rains, It Drains An Overview of the Hempfield Township’s New Storm Water Management Program.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
SLIDE 1 Sustainable Stormwater Management May 6, 2015 Blue Highways: Transportation and Stormwater Management in Virginia Ginny Snead, PE Richmond Office.
Trends in Stormwater Permitting Joyce Brenner, P.E. Chief of Stormwater Policy, Planning, and Permitting Division of Environmental Analysis Caltrans Headquarters.
The purpose of the San Dieguito Union High School District’s stormwater management plan is to comply with applicable stormwater regulations, educate.
 Why are we here?  Without regulations, rivers used to catch fire. Rules and Regulation.
Developing Final Phase II WIPs and Milestones Katherine Antos Chesapeake Bay Program Office Jenny Molloy Water Protection Division DC Draft Phase II WIP.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
Putting the “LID” on Water Pollution New Water Quality Requirements for Land Use County of Orange Mary Anne Skorpanich Richard Boon.
Module 1: Stormwater Permit Program Robert Pitt Department of Civil and Environmental Engineering University of Alabama Tuscaloosa, AL.
The Virginia Bar Association October 22, 2009 Richmond, Virginia Reginald Parrish U.S. Environmental Protection Agency Chesapeake Bay Program Update on.
DC Draft Phase II Watershed Implementation Plan Stakeholder Meeting March 1, 2012 Metropolitan Washington Council Of Governments Hamid Karimi Deputy Director.
1 Stormwater Phase II Municipal Separate Storm Sewer Systems and Act 167 Doug Brennan PA DEP September, 2002.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
MS4 Remand Rule Intergovernmental Associations Briefing September 15, 2015.
New Boise Area MS4 Permit Boise City Council Budget Workshop August 15, 2012.
EPA’s Stormwater Rulemaking: How Potential Changes in the NPDES Stormwater Regulations Could Impact the Design of Stormwater Controls Rachel Herbert USEPA/OW/OWM/WPD.
Presentation to the Chesapeake Bay and Water Resources Policy Committee July 30, 2010.
Restoring VA Waters the TMDL Way Jeff Corbin Senior Advisor to the Regional Administrator U.S. EPA Region 3.
Workshop on the draft General Permit for Discharges of Storm Water from Small MS4s Fresno August 6, 2002 Redding August 8, 2002 San Luis Obispo August.
Stormwater Treatment and Flow-Control Requirements in Phase I and Phase II Municipal NPDES Permits Dan Cloak, Principal Dan Cloak Environmental Consulting.
Urban Programs. Urban Programs - ESC Virginia Erosion and Sediment Control (ESC) Law –Approved in –Title 10 of the Code of Virginia. “Each District.
IMLA New England Regional Land Use Seminar June 21, 2012 Work Session 2. Storm Water Management James N. Katsiaficas, Esq. P.O. BOX 426 PORTLAND, MAINE.
Regulatory Developments Affecting Southwest Washington Land Use in Southwestern Washington Law Seminars International Vancouver, WA February 11, 2008 Bill.
Stormwater and C.3 Overview Tom Dalziel, Assistant Manager Contra Costa Clean Water Program.
Stormwater Regulations NC Division Of Water Quality DPPEA Technical Sharing Session May 25, 2004.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Phase II National Storm Water Regulations What’s in it for you?
Storm Water Permitting Commission on the Future of Virginia’s Environment August 27, 2001 Department of Environmental Quality.
MWCOG Water Resource Workshop “Preparing for Regulatory Change” February 20, 2004 Track 2: Panel #4 - Storm Water MS4 Regulation Paula Estornell, USEPA,
An Overview of our Community’s Stormwater Management Program
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Kentucky Growth Readiness for Water Quality Does your water quality matter?
URBAN STORMWATER: A PERFECT STORM FOR CHANGE Jon M. Capacasa Director, Water Protection Division EPA Region III.
Stormwater Management William Taylor New Hampshire Wastewater Control Association June 13, 2013.
Urban Runoff Greg Gearheart Christine Sotelo Eric Berntsen State Water Resources Control Board.
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
County-Wide Act 167 Plan “County-wide Act 167 Stormwater Management Plan for Chester County, PA” was prepared by: Chester County Water Resources Authority.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
Northern Virginia Regional Commission MS4 Workgroup March 17, 2011.
CLEAN WATER ACT AND MUNICIPAL STORMWATER CALIFORNIA STORMWATER WORKSHOP David W. Smith, Manager NPDES Permits Section EPA/Region 9.
Williamsburg’s Local Strategies to meet the ChesBay TMDL March 2012 Chesapeake Bay Watershed Virginia Maryland Pennsylvania New York Delaware West Virginia.
New York’s Chesapeake Bay WIP
Building a Phase III WIP for Wastewater, Stormwater & Septic Systems
Sacramento County Stormwater Quality Program
John Tinger U.S. EPA Region IX
Water Quality Trading Advisory Committee MDA Headquarters
Water Quality Trading Advisory Committee MDA Headquarters
MS4 = Municipal Separated Storm Sewer System
Sacramento County Stormwater Quality Program
Presentation transcript:

Stormwater Rulemaking Briefing US Environmental Protection Agency

Overview Regulatory framework Drivers for present rulemaking Rulemaking considerations Timeline –Activities completed to date –Activities in progress

1972:CWA amendments establish NPDES permit program. Program does not include stormwater. Regulatory Framework All “point” sources “discharging pollutants” into “waters of the U.S.” Must obtain an NPDES permit from an authorized state or EPA

1983: Nationwide Urban Runoff Program finds urban runoff a significant source of pollution 1987:CWA amendments direct EPA to regulate stormwater discharges under NPDES Amendments recorded in section 402(p) 402(p) establishes phased approach to stormwater permitting Regulatory Framework

Section 402(p)(4) Required EPA to establish permit application requirements for industrial and medium and large municipal separate storm sewer discharges Section 402(p)(5) Required EPA to conduct a study to identify other stormwater discharges, assess associated pollutant loads, and submit the results in a report to Congress. Section 402(p)(6) Provides authority for EPA to regulate other stormwater sources, based on the study, “to protect water quality”

1990:EPA promulgates Phase I Stormwater Rules 1999: EPA promulgates Phase II Stormwater Rules Regulatory Framework Phase IPhase II Municipalities with populations > 100,000 “Urbanized Areas” based on decennial Census & smaller MS4s designated by permitting authority Covers over 1,000 MS4s Covers over 5,000 smaller MS4s

Regulatory Framework Phase IPhase II Typically covered by individual permits Typically covered by general permits Must reduce the discharge of pollutants to the maximum extent practicable (MEP) Application requires development of a stormwater management program Application requires development of a stormwater management program that includes the six minimum measures Monitoring required to characterize stormwater discharges Monitoring not required by rule

Drivers of Rulemaking October 2008 National Research Council Report. EPA commissioned NRC to Review its current permitting program for stormwater discharges under the CWA Provide suggestions for improvement May 2011 settlement in Fowler vs. EPA. Plaintiffs claimed EPA failed to take adequate measures to protect and restore the Chesapeake Bay.

Current approach unlikely to adequately control stormwater’s contribution to waterbody impairment Requirements leave a great deal of discretion to dischargers to ensure compliance Poor accountability and uncertain effectiveness A more straightforward way to regulate stormwater contributions to waterbody impairment would be to use flow or a surrogate, like impervious cover, as a measure of stormwater pollutant loading NRC Stormwater Report Findings

Efforts to reduce stormwater flow will automatically achieve reductions in pollutant loading Flow is itself responsible for additional erosion and sedimentation that adversely impact surface water quality. Stormwater control measures that harvest, infiltrate, and evapotranspirate stormwater are critical to reducing the volume and pollutant loading of small storms. NRC Stormwater Report Findings

EPA agreed to settlement with Chesapeake Bay Foundation and others in May 2011 “By September 30, 2011, EPA will propose a regulation under section 402(p) of the Clean Water Act to expand the universe of regulated stormwater discharges and to control, at a minimum, stormwater discharges from newly developed and redeveloped sites…EPA will take final action on the regulation by November 19, 2012.” Fowler vs. EPA

Establishing substantive post-construction requirements for new and redevelopment Expanding the universe of regulated discharges beyond the urbanized area Addressing stormwater discharges from existing development through retrofitting Establishing specific requirements for transportation Establishing specific provisions for the Chesapeake Bay Rulemaking Considerations

13 Post-Construction Requirements Objective is to maintain or restore receiving water form and function by reducing pollutant loads and stream channel erosion Preferred approach is to require post-construction hydrology to mimic natural hydrology

14 Post-Construction Requirements Standard could include: –On-site retention of a certain size storm event determined by EPA –On-site retention of a certain size storm event determined by permitting authority –Other approach determined by permitting authority and consistent with objective

15 EPA will consider –Whether the standard should be different for discharges from new development vs. redevelopment –What flexibility must be included to account for local variability, site constraints and water rights law –Whether unique standards be developed for transportation Post-Construction Requirements

16 Defining Regulated Discharges All discharges from new development and redevelopment of a certain size could be subject to a federal/state standard Regulated MS4s could be required to apply the standard to applicable discharges to their system Only discharges beyond the MS4 could be subject to a federal/state standard Combination of the above

17 Addressing Discharges from Existing Development Retrofit requirements could: Require MS4s to develop a retrofit implementation plan Require the MS4s to implement the plan over a certain time period

Specific Provisions for the Chesapeake Bay Over 64,000 square miles of land drain into the Chesapeake Bay or its tributaries Major urban areas include: – Baltimore, MD- DC – Harrisburg, PA- Annapolis, MD – Richmond, VA – Hampton Roads, VA EPA plans to include in this proposed rulemaking a separate section containing additional stormwater provisions for the Chesapeake Bay watershed

Activities Completed to Date January – March 2010 Conducted five listening sessions and national webcast (2,000 participants) August 2010 Distributed questionnaires to regulated MS4s, transportation-related MS4, unregulated MS4s, NPDES permitting authorities and owners of developed sites to gather information

Activities Completed to Date September – November 2010 Conducted site visits with state and local stormwater managers, developers, engineers, and environmental advocates throughout the Northeast, Midwest, Southwest, Northwest and Southern California October – November 2010 Conducted five listening sessions on Chesapeake Bay specific provisions Monthly meetings with States

Activities in Progress Benchmarking Cost Benefit Analyses Stormwater Calculator Green Infrastructure Database

Anticipated Completion Proposal by September 30, 2011 Final action by November 19, 2012

Questions?