Timber Framed Structures

Slides:



Advertisements
Similar presentations
Framing.
Advertisements

Common Components of a Traditional Wood Framed Building
Roofs are one of a building’s primary elements and play a major part in giving a building its character. There are several different types of roof in.
Portal Framed Construction
Carpentry Skilled Trades Ceiling and Roof Framing The most commonly used types of residential roof and ceiling construction are: Joist and Rafter.
Competency: Draw Wall Sections
Floors construction After the foundations have been completed and the external walls constructed the construction of the floors commences.
Walls Ron Gatepain constructionsite.
NGfL CYMRU GCaD STRUCTURAL TIMBER FRAMING.
Building Methods Types of Structure.
The development of wall structures After the foundations have been completed the external walls are set out and construction commenced. There are many.
UNIVERSAL COLLEGE OF ENG. AND TECH
After the foundations have been completed the walls are set out and construction commences. wall structures.
QuickWalls® strong. fast. simple.
Wall and Ceiling Construction Vocabulary
Topic C1 Superstructures - walls
Building Types.
Prefabricated Timber Frame Construction
Light Frame Construction
Btec Construction Unit 5 Methods of construction for domestic buildings.
RESIDENTIAL CONSTRUCTION UNIT Grade 10 Construction Technology TCJ200.
Wall and Ceiling Construction
1 Building Types. 2 Building Use and Size Buildings are available in many types and sizes. Large, specialized buildings should be planned and built by.
Common Components of a Traditional Wood Framed Building
SHREE J.M.SABVA INSTITUTE OF ENGINEERING &TECHNOLOGY, BOTAD 1.BELADIYA VISHAL R. 2.PARMAR PRAKASH K. 3.DESAI PARAS V. 4.PARMAR VISHAL D. 5.GOHEL KAMLESH.
Light Wood Frame Construction
BUILDING THE FRAME Walls are constructed in sections, lying down on the floor platform and then tilted up into position. Fundamentals of Building Construction,
Wall and Ceiling Construction
Unit 6/P6 – Timber Frame Construction Name ________________
Name ________________ Unit 6/P6 – Traditional Construction Most common foundation = strip Damp Proof Course 150mm above ground level External Walls are.
Lecture 15 - Timber Wall Framing Example
Residential Construction
QuickWalls® strong. fast. simple. *Light Weight *Insulated
Timber Frame Construction 3A9 Construction Technology Dr S Pavía Dept of Civil Engineering Trinity College Dublin.
House Construction.
Unit 6: Building Technology in Construction Learning Outcome Understand the techniques used in the construction of superstructures for low-rise domestic.
APPLICATIONS OF TECHNOLOGY
Drafting 2 (Arch) Quiz Review #5
Learning Outcome Lesson Objective
Framed Buildings Plane Frames Space Frames Skeleton Frames.
Learning Outcome Lesson Objective
Pitched Roof By PATEL ANKITKUMAR H.
Building construction Prepared by : Rall no : : Nayani Paril : Patel Nikunj : Parmar Mihir : Patel Adarsh : Patel Bhavin.
VIA / TCU 4th semester workshop S2016 CASE 2: Multistory Building VIA University CollegeTCU-VIA Workshop – S20161 A Quick Discovery of Construction in.
Cavity Wall Construction
Common Components of a Traditional Wood Framed Building
Warm-up 9/20/16 What is the underlayment called below the shingles?
Common Components of a Traditional Wood Framed Building
OBJ: SWBAT create a CAD Rendering of a Utility shed.
APPLICATIONS OF TECHNOLOGY
Prefabricated Timber Frame Construction
BUILDING TECHNOLOGY IN CONSTRUCTION
Timber Framed Buildings
Wood Frame Systems Civil Engineering and Architecture®
Competency: Draw Wall Sections
Building Methods Types of Structure.
Warm-up 9/19/16 What template are we using?
Pritesh h prajapati Arvind g prajapati Arvind m prajapati Arvind khata.
Building Construction I Sofia Sebastian 1
Building Construction I Sofia Sebastian 1
Common Components of a Traditional Wood Framed Building
MATERIALS AND CONSTRUCTION I
STRUCTURAL TIMBER FRAMING
Common Components of a Traditional Wood Framed Building
Competency: Draw Wall Sections
Introduction The Gamma Bracing System
Common Components of a Traditional Wood Framed Building
Timber Frame Panel with opening Typical panel comprises a series
Common Components of a Traditional Wood Framed Building
Introduction The Gamma Bracing System
Presentation transcript:

Timber Framed Structures

The Structure Timber framed structures differ from those constructed of traditional brick and block work because the structural frame members are fabricated from wood. They transmit their loads onto the foundation through a common sole or base plate. Timber frame structures must comply with the building regulations in every aspect including resistance to fire. In the UK housing in timber framed structures is permitted up to three storeys including flats and Maisonettes.

Advantages of timber framed construction. Timber framed construction allows for the use of semi skilled labour for the manufacture in factory controlled conditions. Rapid completion on site is easily achieved with less wet trades involved. The occupier of a timber framed dwelling benefits from the higher insulation which can easily be achieved. The use of low thermal capacity linings absorbs less heat than masonry walls making it is easier to reach the required comfort temperature more quickly.

Manufacturing Process Timber framed houses are usually made in factories into large wall sized units which make economic use of materials. The manufacturing process is not effected by inclement weather. Timber framed panels in the workshop ready for erection.

Platform framed structures. The most common method of constructing a timber framed structure is a platform frame. With this method each storey is framed up as a separate operation making use of each floor as an erection platform. Another method of construction is balloon frame. In this method of construction the building is fabricated from wall sections two storeys high. It is not used for three storey structures.

External walls The structural framed members of the external walls are constructed with light softwood timbers which are designed using stress graded timber to BS4978. The studs are usually processed from basic sawn sizes of either 100 x 50mm or 75 x 50mm. These studs are usually spaced at 400mm centres. The studs are nailed with simple butt joints to top and bottom plates of the same size. Panel sizes is dictated by an early decision on whether they are to be craned or manually lifted into position. The external walls are braced with sheet materials, usually water boil proof (WBP) plywood, nailed or stapled to the external face of the frame.

Drawing of an external walls

Timber Stud Walls

Trussed Rafter Trussed Rafters are used on most timber framed houses.

Timber Framed structures under erection

Breather Membrane To prevent moisture entering into the plywood sheathing during construction a breathable membrane is stapled onto the plywood on the external face. This membrane also provides a second line of defence should moisture penetrate the exterior cladding.

External Cladding External cladding can be chosen from a wide range of materials which include brickwork secured across a cavity to the timber frame with flexible metal ties. The flexible wall ties are used to allow for differential movement between the brick cladding and the timber frame. The brick cladding must be designed in such a way to allow for movement at projecting windows sills and under roof structures.

External Cladding A Inner Lining of Plasterboard B Vapour Check C Structural Timber Frame D Thick Insulation Quilt-CFC free E Sheathing Board F Waterproof Breather Membrane G Stainless Steel Wall Tie H Clear 50mm Wall Cavity I Brick Outer Cladding

External Cladding Roofing tiles may also be used as a cladding material. These tiles are hung on timber battens which have been secured to the plywood. These battens must be treated with a timber preservative prior to being secured to the plywood.

Preservation Treatment The Building Regulations require that timber cladding should be made from durable species or treated with suitable preservatives. They also require that all timber which occurs below damp proof course (DPC) level must be treated against insect and fungal attack. Other timbers do not require to be treated with preservatives but most manufacturers do treat all their timbers. Approval for fire and the structural stability of timber framed houses require a certificate of approval by a structural engineer or another equally approved organisation before erection.