Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 MON Equipment Leak Requirements.

Slides:



Advertisements
Similar presentations
Cathy Beahm Technical Assistance Specialist NH DES, Air Resources
Advertisements

METAL FURNITURE SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART RRRR July 2006.
METAL COIL SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART SSSS May CFR PART 63, SUBPART SSSS May 2006.
METAL CAN SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART KKKK June CFR PART 63, SUBPART KKKK June 2006.
METAL COIL SURFACE COATING MACT QUESTION & ANSWERS
DRAFT IRON & STEEL FOUNDRY MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART EEEEE.
METAL CAN SURFACE COATING MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART KKKK June 2006 June CFR PART 63, SUBPART KKKK June 2006 June 2006.
METAL FURNITURE SURFACE COATING MACT COMPLIANCE ASSURANCE
METAL CAN SURFACE COATING MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART KKKK June, CFR PART 63, SUBPART KKKK June, 2006.
Compliance Dates The final rule was published on January 25, 1995,
IRON & STEEL FOUNDRY MACT COMPLIANCE ASSURANCE
Pneumatic Valves Lesson 4.
METAL CAN SURFACE COATING MACT QUESTION & ANSWERS 40 CFR PART 63, SUBPART KKKK June, CFR PART 63, SUBPART KKKK June, 2006.
HAZARD COMMUNICATION REQUIREMENTS Site Specific Written Program Chemical Inventory MSDSs/SDSs Labeling Non-routine Tasks Contractors Training.
Antero Punttila Analyzing most typical energy saving measures Energy Efficiency of Steam and Condensate Systems Antero Punttila, Motiva Oy.
Michael Hopkins Assistant Chief, Permitting Ohio EPA Air Permitting for Oil & Gas Well Sites.
Harmonization of Parts 60 and 75
START-UP AND OPERATION OF MECHANICALLY SEALED EQUIPMENT 1:13.
It can be as easy as patching a hose. TEAM UP! FOR COMPRESSED AIR SAVINGS.
Customer Service – International Dept. The thermal solar systems  Installation  Commissioning  Maintenance.
Railroad Commission of Texas Statewide Rule 32 and Flaring/Venting of Produced Gas Travis Baer, District 01 Engineering Specialist August 2014.
Anne M. Inman, P.E. Air Permits Division September 11, 2012.
Student Book © 2004 Propane Education & Research CouncilPage Placing Appliances into Initial Operation Knowing the proper techniques and.
General Rules Compressed gases and cylinders must be properly stored, transported and used to prevent injury and accidents. Compressed gases and cylinders.
MON MACT Storage Tank & Transfer Racks Presenter: James Leonard November 5, 2003 ACC/SOCMA Conference New Orleans, LA.
Garry Kaufman Deputy Director Colorado Air Pollution Control Division June 6, 2014.
Developing and Complying with LDAR Programs Robert vandenMeiracker.
Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 MON Continuous PV Requirements.
1 Expansion Tanks. 2 3 Expansion Tanks WHY USE THEM TYPES LOCATION SIZING.
Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 MON Heat Exchanger Requirements.
Implementation and Management of Leak Detection and Repair Programs – New Rules and Other Considerations Nebraska Ethanol Safety & Environmental Coalition.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
Highlights of Colorado’s New Oil and Gas Hydrocarbon Emission Reduction Rules - Adopted February 2014 Presentation to WESTAR May 2014 Will Allison Colorado.
Vacuum Box Systems.
Gas Transmission Pipelines
Air Quality Division Tank Degassing and Cleaning Rules; TSH :May 15, 2008 Page 1 Changes to Tank Degassing and Cleaning Rules Texas Association of Environmental.
Control of Pneumatic Energy
3.4.2 Student Book © 2004 Propane Education & Research CouncilPage Types and Functions of Valves and Fittings Used in Bulk Plant Containers and.
Directed Inspection and Maintenance (DI&M) Lessons Learned from Natural Gas STAR Partners Producers Technology Transfer Workshop Devon Energy and EPA’s.
Patrick Thornton, SNS/FPE June 9, 2008
New Air Quality Regulation “NSPS OOOO” Oil and Natural Gas Industry Workshop October 24, 2012 Robert Keatley, PE Senior Engineer/Supervisor DEP – Division.
CHAPTER 4 CPB 20004: Plant Utility n Maintenance
HSEQ M. A. Vancil November 6, 2003 Page 1 ACC/SOCMA MON MACT Workshop November 5-6, 2003 New Orleans, LA Michael A. Vancil, PE Bayer Polymers LLC.
Directed Inspection & Maintenance At Compressor and Gate Stations
New Orleans / ACC / SOCMA November 2003 Randy McDonald, OAR, USEPA.
Placing Vapor Distribution Systems and Appliances into Operation MODULE 8 System Tests.
What is Fluid Power? Fluid power is energy transmitted and controlled by means of a pressurized fluid, either liquid or gas. The term fluid power applies.
WILL ALLISON AIR POLLUTION CONTROL DIVISION APRIL 16, 2012 Oil and Natural Gas Air Pollution Standards.
EPA Overreach WATERS OF THE U S METHANE REDUCTION PLAN LEGISLATIVE /REGULATORY FORUM SEPTEMBER 16, 2015.
2.3.8 Student Book © 2004 Propane Education & Research CouncilPage Performing Pre-Unloading Cargo Tank Emergency Discharge System & Delivery Hose.
Automotive Air Conditioning and Repair 7-1 Goals of P2 in Automotive Air Conditioning Service Work n Pollution Prevention Goals –Minimize refrigerant vented.
Samuel Short, Manager Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.
3.1.8 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
Standards Certification Education & Training Publishing Conferences & Exhibits Jay Christopher Business Unit Manager, Air & Process Services Trihydro Corporation.
By John Templeton.  Definition- the science that deals with the laws governing water or other liquids in motion and their applications in engineering;
Samuel Short, Manager Air Permits Division Texas Commission on Environmental Quality.
Supplementary Guidance on the Reporting of Hydrocarbon Release, Issue 3 January 2016.
John Curtin Iowa Department of Natural Resources.
Current gas flow scheme Gas handlerTPC 1~2 m Braided plastic tube 1~2 m Alum. tube 5 m Alum. tube Pressure relief valve P10 Rotary Pump (Edwards E2M8)
CCNA1 v3 Module 9 v3 A+ Type 1 JEOPARDY K. Martin.
NSPS OOOOa Overview Photo from
PRESSURE CONTROL VALVES (PCVs)
WHY? HOW? Test Valve Measure Vibrations Contain Valves
ARB GHG Oil & Gas Regulation
Real Solutions Product Introduction
Science 8 - Unit A - Mix and Flow of Matter
The BioTector B3500ul TOC analyzer Process Tests
Powered By-
Gas Transmission Pipelines
Presentation transcript:

Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 MON Equipment Leak Requirements

Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 What “Equipment” is Covered? Each pump, compressor, agitator, pressure relief device, sampling connection system, open ended valve or line, valve, connector, and instrumentation system in organic HAP service; and any control devices or systems used to comply with the equipment leak standard in the MON. “In organic HAP service” means the equipment either contains or contacts a fluid (liquid or gas) that is at least 5 wt.% total organic HAP.

Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 What Requirements must Existing Sources Meet? For equipment that is in organic HAP service at an existing source MCPU with no continuous process vents: –Comply with part 63 subpart TT; or –Comply with part 63 subpart UU; or –Comply with part 65, subpart F.

Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 What Requirements must Existing Sources Meet? (Cont’d) For equipment that is in organic HAP service at an existing source MCPU with at least one continuous process vent: –Comply with part 63 subpart UU; or –Comply with part 65, subpart F.

Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 What Requirements must New Sources Meet? For equipment that is in organic HAP service at a new source MCPU: –Comply with part 63 subpart UU; or –Comply with part 65, subpart F.

Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 What does Part 63 Subpart TT Require? Subpart TT is patterned on NSPS VV. It contains equipment and work practice requirements. It requires extensive identification of equipment subject to the rule and of equipment meeting special conditions.

Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 What does Part 63 Subpart TT Require? Work practice requirements are based on monitoring by Method 21 or visual means. In most cases a leak is defined as 10,000 ppm.

Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 What does Part 63 Subpart TT Require? (Cont’d) If a leak is found, you must make a first attempt at repair within 5 days and repair within 15 days. A repair is not complete until remonitored. Delay of repair is permitted in limited circumstances.

Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 What does Part 63 Subpart TT Require? (Cont’d) Equipment Requirements Compressors must be equipped with a seal system that meets specified criteria. There is an exception, if the seal operates at <500 ppm as demonstrated annually.

Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 What does Part 63 Subpart TT Require? (Cont’d) Equipment Requirements All (gas, light liquid and heavy liquid) sample connection systems must be closed purge, closed loop, or have a closed vent system.

Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 What does Part 63 Subpart TT Require? (Cont’d) Equipment Requirements Control devices must achieve 95% control. Control devices must meet the requirements in part 63 subpart SS (§63.982(a)(4)).

Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 What does Part 63 Subpart TT Require? (Cont’d) Work Practice Requirements Valves in gas or light liquid (LL) service must be monitored monthly (quarterly if < 250 valves at plant site) by Method 21. LL means a liquid with at least 20 wt% of the VOC in the liquid having a vapor pressure at 20 °C  psi.

Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 What does Part 63 Subpart TT Require? (Cont’d) Work Practice Requirements With good performance (<2.0% leakers) can monitor annually, except for valves which have leaked. Can use historical data to reduce initial monitoring frequency.

Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 What does Part 63 Subpart TT Require? (Cont’d) Work Practice Requirements Pumps in LL and agitators in gas or LL service must be monitored monthly by Method 21 and visually checked weekly. Equipment alternates are allowed.

Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 What does Part 63 Subpart TT Require? (Cont’d) Work Practice Requirements Atmospheric relief devices in gas service must be monitored for <500 ppm leakage no later than 5 days after a release.

Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 What does Part 63 Subpart TT Require? (Cont’d) Work Practice Requirements Connectors, relief valves in LL service, instrumentation systems and equipment in HL service must be repaired, or monitored by Method 21, if a possible leak is identified by sensory means.

Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 What does Part 63 Subpart TT Require? (Cont’d) Work Practice Requirements Open-ended valves and lines are not permitted. Closed vent systems (CVS) must meet the requirements from part 63 subpart SS (§63.983).

Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 What does Part 63 Subpart SS Require for a CVS? Closed vent system means a system that is not open to the atmosphere and is composed of piping, ductwork, connections, and, if necessary, flow inducing devices that transport gas or vapor from an emission point to a control device. Closed vent system does not include the vapor collection system that is part of any tank truck or railcar.

Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 What does Part 63 Subpart SS Require for a CVS? (Cont’d) Requires flow monitoring, car-sealing or lock and key for potential bypasses, with inspection. Pressure relief devices, low leg drains, high point bleeds, analyzer vents, and open-ended valves or lines are not potential bypasses.

Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 What does Part 63 Subpart SS Require for a CVS? For hard-pipe CVS, monitor components initially by Method 21 (500 ppm leak rate) and perform sensory inspection annually. For ductwork CVS, monitor components annually by Method 21 (500 ppm leak rate).

Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 What does Part 63 Subpart UU Require? Part 65 Subpart F is the same as Part 63 Subpart UU. Subpart UU patterned on the HON. It has the same requirements as Subpart TT with the following major changes.

Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 What does Part 63 Subpart UU Require? (Cont’d) For valves in gas or LL service the leak rate is 500 ppm. The % leak rate sets the monitoring frequency, except for leakers. A 2 year interval can be reached for 0.25% leak rates.

Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 What does Part 63 Subpart UU Require? (Cont’d) Can use historical data to reduce initial monitoring frequency. Table 1 of subpart UU provides for reduced monitoring frequency for batch processes which operate less than 75% of the year.

Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 What does Part 63 Subpart UU Require? (Cont’d) Valves can be subgrouped if entire MCPU is <2% leakers, with each subgroup having it’s own monitoring interval, based on its performance.

Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 What does Part 63 Subpart UU Require? (Cont’d) The leak rate for pumps is 1000 ppm (though repair is not required until 2000 ppm), with some special service pumps at higher definitions.

Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 What does Part 63 Subpart UU Require? (Cont’d) Connectors in gas or LL service must be monitored by Method 21 with a 500 ppm leak rate definition in the first year and at intervals of 1 year to 8 years depending on leak rate.

Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 What does Part 63 Subpart UU Require? (Cont’d) Quality improvement programs are required where pumps or valves exceed specified leak rates for extended times.

Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 What does Part 63 Subpart UU Require? (Cont’d) § of subpart UU provides for pressure/vacuum testing of batch processes as an alternate to Method 21 monitoring. Under § (c), this alternate is available to all MON processes, not just batch.

Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 What does Part 63 Subpart UU Require? (Cont’d) Test all equipment at least annually. Test new or disturbed equipment each time it is reconfigured for production for a different product or intermediate. Routine seal breaks (hoses or filters) are exempt.

Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 What does Part 63 Subpart UU Require? (Cont’d) An alternate for equipment in enclosures is also provided. Specific recordkeeping requirements apply to these batch alternates options.

Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 What about other Equipment Leak Rules? If you have an affected source with equipment that is also subject to the requirements of part 60 subpart VV or part 61 subpart V, you may elect to apply the MON requirements to all such equipment.

Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 What about other Equipment Leak Rules? If you have an affected source with no continuous process vents and equipment that is also subject to the requirements of part 60 subpart VV or part 61 subpart V, you may elect to comply with part 60 subpart VV or part 61 subpart V, as applicable, for all such equipment.