WLTP-DHC Test results of Validation test 1b and Cycle modifications the 12th DHC group under GRPE/WLTP informal group 29 March 2012 Joint Research Centre, Ispra Prepared by Japan
WLTP-DHC Table of contents 1.Result of Validation 1b by Japan 2.Result of Validation 1b by India and JRC 3.Summary of Indicated portions 4.Cycle modification for Validation 2 5.Proposed WLTC ver.5 for Validation 2 6.List of issues 7.Characteristics of proposed WLTC ver.5 8.Detail of modifications
WLTP-DHC Overview of Validation test 1b in Japan Vehicle No.ABCDEF Vehicle categoryPC LDCV PC Fuel typePetrol Engine capacity (cc) Max. rated power (kW)43 / / / / / /6000 Curb vehicle mass (kg) Test mass (kg) (1020*) Gross vehicle mass (kg) Power to mass ratio (KW/t) (Curb mass basis) After treatmentTWC Emission standard2005 EURO V Transmission5MT 4AT Test mass: A~E: Current JPN regulation test mass (Curb mass kg) : F: Proposed gtr test mass (almost same as JP-mass) Gear shift: fixed gear shift (by Japan) Vehicle F: Current JPN reg. mass: 1020 kg, Proposed gtr test mass: 1046 kg
WLTP-DHC Test result of Passenger car ARROW (↓): Require precise acceleration pedal/clutch operation CIRCLE (○): Hard to follow the trace (require close to W.O.T. operation)
WLTP-DHC Test result of Passenger car ARROW (↓): Require precise acceleration pedal/clutch operation CIRCLE (○): Hard to follow the trace (require close to W.O.T. operation)
WLTP-DHC Test result of Passenger car ARROW (↓): Require precise acceleration pedal/clutch operation CIRCLE (○): Hard to follow the trace (require close to W.O.T. operation)
WLTP-DHC Test result of Light duty commercial vehicle ARROW (↓): Require precise acceleration pedal/clutch operation CIRCLE (○): Hard to follow the trace (require close to W.O.T. operation)
WLTP-DHC Test result of Light duty commercial vehicle ARROW (↓): Require precise acceleration pedal/clutch operation CIRCLE (○): Hard to follow the trace (require close to W.O.T. operation)
WLTP-DHC Test result of Light duty commercial vehicle ARROW (↓): Require precise acceleration pedal/clutch operation CIRCLE (○): Hard to follow the trace (require close to W.O.T. operation)
WLTP-DHC Result of Validation 1b by India and JRC India Dynamic concerns (difficult to follow the cycle) 48-67, , , , , , , , , , , , , PMR concerns (Vehicles of 35 to 65 kW/t have difficulty) , , , Difficult to follow the lower speeds of 10km/h JRC Observed difficulty to drive the low speed parts (~10 km/h) with the 1st gear With typical European vehicles, there seems to be few problem to follow the trace (accelerations and top speed portions of WLTC ver.4).
WLTP-DHC Summary of validation 1b From the viewpoints of drivability, traceability and reproducibility, the following 31 portions are pointed out by India, JRC and Japan : number of decimal places
WLTP-DHC Summary of validation 1b No.TimeCommentsby Need to be smoothnessJapan 248 – 67Difficult to drive the low speed partsJRC/India/Japan 3140 – 160Difficult to drive the low speed partsJRC/India/Japan Difficult to drive the low speed partsJRC/India/Japan Need to be smoothnessIndia/Japan Need to be smoothnessIndia/Japan 7545 – 560Need to be smoothnessJapan Require close to W.O.T. operationJapan Difficult to drive the low speed partsJRC/India/Japan 10709Difficult to drive the low speed partsJRC/India/Japan – 718Difficult to drive the low speed partsJRC/India/Japan – 730Require close to W.O.T. operationJapan Difficult to drive the low speed partsJRC/India/Japan – 785Require close to W.O.T. operationJapan Difficult to drive (PMR concern)India – 810Require close to W.O.T. operationJapan
WLTP-DHC Summary of validation 1b No.TimeCommentsby – 830Need to be smoothnessIndia/Japan – 870Require close to W.O.T. operationJapan – 925Require close to W.O.T. operationJapan – 980Require close to W.O.T. operationJapan – 1065Difficult to drive the low speed partsJRC/India/Japan – 1125 Difficult to follow the target speed Require close to W.O.T. operation India/Japan Difficult to drive the low speed partsJRC/India/Japan Difficult to follow the target speed Require close to W.O.T. operation India/Japan – 1325Require close to W.O.T. operationJapan Require close to W.O.T. operationIndia/Japan Difficult to follow the target speedIndia Require close to W.O.T. operationIndia/Japan Require close to W.O.T. operationIndia/Japan Difficult to drive (PMR concern)India 31Allto be one decimal point ( to XX.X km/h)Japan
WLTP-DHC Proposed cycle modification for Validation 2 As a first step to move forward to validation 2, Japan propose to modify the following items (15 portions). the minimum speed set to 12km/h Smoothing to improve repeatability Set vehicle speed one decimal point Other 16 remaining portions regarding dynamic concerns which was indicated by India and Japan should be considered during Validation 2.
WLTP-DHC Proposed WLTC ver.5 for Validation 2 12 km/h Smoothing Concern : Time chart was changed from two decimal point to one decimal point
WLTP-DHC Proposed WLTC ver.5 for Validation 2 12 km/h Concern Concern 27 31: Time chart was changed from two decimal point to one decimal point
WLTP-DHC List of issues No.TimeCommentsbyAction Need to be smoothnessJapanSmoothing 248 – 67Difficult to drive the low speed partsJRC/India/JapanMinimum speed to 12 km/h 3140 – 160Difficult to drive the low speed partsJRC/India/JapanMinimum speed to 12 km/h Difficult to drive the low speed partsJRC/India/JapanMinimum speed to 12 km/h Need to be smoothnessIndia/JapanSmoothing Need to be smoothnessIndia/JapanSmoothing 7545 – 560Need to be smoothnessJapanSmoothing Require close to W.O.T. operationJapanEvaluated during validation Difficult to drive the low speed partsJRC/India/Japan Minimum speed to 12 km/h & Smoothing 10709Difficult to drive the low speed partsJRC/India/JapanMinimum speed to 12 km/h – 718Difficult to drive the low speed partsJRC/India/JapanMinimum speed to 12 km/h – 730Require close to W.O.T. operationJapanEvaluated during validation Difficult to drive the low speed partsJRC/India/JapanMinimum speed to 12 km/h – 785Require close to W.O.T. operationJapanEvaluated during validation Difficult to drive (PMR concern)IndiaEvaluated during validation – 810Require close to W.O.T. operationJapanEvaluated during validation2
WLTP-DHC List of issues No.TimeCommentsbyAction – 830Need to be smoothnessIndia/JapanSmoothing – 870Require close to W.O.T. operationJapanEvaluated during validation – 925Require close to W.O.T. operationJapanEvaluated during validation – 980Require close to W.O.T. operationJapanEvaluated during validation – 1065Difficult to drive the low speed partsJRC/India/JapanMinimum speed to 12 km/h – 1125 Difficult to follow the target speed Require close to W.O.T. operation India/JapanEvaluated during validation Difficult to drive the low speed partsJRC/India/JapanMinimum speed to 12 km/h Difficult to follow the target speed Require close to W.O.T. operation India/JapanEvaluated during validation – 1325Require close to W.O.T. operationJapanEvaluated during validation Difficult to follow the target speed Require close to W.O.T. operation India/JapanEvaluated during validation Difficult to follow the target speedIndiaEvaluated during validation Difficult to follow the target speedIndia/JapanEvaluated during validation Difficult to follow the target speedIndia/JapanEvaluated during validation Difficult to drive (PMR concern)IndiaEvaluated during validation2 31Allto be one decimal point ( to XX.X km/h)Japanone decimal point
WLTP-DHC Characteristics of proposed WLTC ver.5 Chi squared value of proposed WLTC v5 is identical to that of WLTC v4
WLTP-DHC Speed frequency distributions Proposed
WLTP-DHC v * a_pos frequency LOW MIDDLE HIGH Extra-HIGH 95%tile of WWW database is 10 m 2 /s 3 Max. of WLTC v5 is 11.2 m 2 /s 3 95%tile of WWW database is 14 m 2 /s 3 Max. of WLTC v5 is 16.7 m2/s3 95%tile of WWW database is 16 m 2 /s 3 Max. of WLTC v5 is 19.7 m 2 /s 3 95%tile of WWW database is 18 m 2 /s 3 Max. of WLTC v5 is 20.9 m 2 /s 3 The maximum v*a of WLTC ver.5 exceed 95%tile of WWW database
WLTP-DHC Detail of modification Not modified, but need further evaluation
WLTP-DHC Detail of modification Not modified, but need further evaluation
WLTP-DHC Detail of modification Not modified, but need further evaluation
WLTP-DHC Detail of modification Not modified, but need further evaluation
WLTP-DHC Detail of modification Not modified, but need further evaluation
WLTP-DHC Detail of modification Not modified, but need further evaluation
WLTP-DHC Source: JSAE 2008