Ecological Survey Reports The level of ESR Report is determined by the type of project and its probable level of impacts.

Slides:



Advertisements
Similar presentations
Summary of Aquatic Programs Administered by the WV Division of Natural Resources Dan Cincotta WVDNR P. O. Box 67 Elkins, WV
Advertisements

Stormwater Management Initiative Update. ODOTs Goal Develop a streamlined stormwater runoff treatment program to: Develop a streamlined stormwater runoff.
Introduction to Field Survey Methods Eco surveys generally employ a descriptive or qualitative approach towards data collection. Eco surveys generally.
OFFICE OF ENVIRONMENTAL SERVICES. ECOLOGICAL TRAINING INTRODUCTION INTRODUCTION SURVEY SURVEY LITERATURE REVIEW LITERATURE REVIEW FIELD SURVEY METHODS.
Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
US Army Corps of Engineers BUILDING STRONG ® Restoration and Regulation Discussion Joseph P. DaVia US Army Corps of Engineers-Baltimore Chief, Maryland.
Coal Mining Activities Mark A. Taylor Huntington District Corps of Engineers.
Marin Coastal Permit Coordination Program North Bay Watershed Association January 18, 2011.
State Waters and Stream Buffers
401 Water Quality Certification South Carolina Department of Health and Environmental Control.
Update on FHWA/FTA Proposed Rulemaking. MAP-21 Requirements Section 1318(a)(3) o Solicit requests from state DOTs, transit authorities, and MPOs, for.
Section 4(f) Section 6(f). Section 4(f) Process Overview 2 Project Initiation Package Field Review 4(f) Property Present Use Coordination NEPA Document.
Environmental Scoping Guidance Jerry Vogt Region Environmental Coordinator ODOT – Region 3.
NEW PROGRAMMATIC CATEGORICAL EXCLUSION AGREEMENT A WORK IN PROGRESS… ODOT—Office of Environmental Services Environmental Update Meeting20 November 2014.
Environmental Project Commitments The Alberta Experience
ODOT – FHWA Environmental Performance Measures February 2012.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
ENVIRONMENTAL COMMITMENT COMPLIANCE. Mark Schrader – FHWA –Law and Process Review Findings Bill Bicknell – USFWS –Field Review Examples Sheri Lares -
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Oregon’s Federal Aid Highway Programmatic.
Utah Watershed Coordinating Council Conservation Planning Workshop Navigating the Corps’ Permitting Process July 20, 2011 Jason Gipson Chief, Utah/Nevada.
FOIA and NEPA Federal Highway Administration Environmental Conference June 2006.
Level 1 Ecological Survey Report Requirements ODOT -- Office of Environmental Services.
Spectra Energy Partners Texas Eastern Transmission, LP Ohio Pipeline Energy Network Project (OPEN) Clean Water Act Section 401 Water Quality Certification.
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
Compensatory Mitigation in Coastal Louisiana Keith Lovell, Administrator Office of Coastal Management Department of Natural Resources 10/03/121.
WETLANDS and ODOT Environmental Services Oregon Department of Transportation.
Connecticut Department of Transportation Bureau of Policy & Planning.
WETLANDS and LOCAL PROGRAMS Environmental Services Oregon Department of Transportation.
Future Transportation Projects within the Loxahatchee River Basin Florida Department of Transportation District IV 3400 W. Commercial Blvd W. Commercial.
Rural Development Water and Waste Projects: Environmental Requirements John Helgren, P.E. – State Environmental Coordinator Madeline Crowe – Assistant.
MassDOT P3 Project Overview. MassDOT Project Mobility.
BUILDING STRONG ® 1 Regional General Permit (RGP) 31 Interagency Meeting June 11, 2015.
I Larry Heil, FHWA October 15, 2003 Environmental Streamlining.
Buckhorn Mountain EIS Project August Buckhorn Mountain Exploration Project Echo Bay Exploration is seeking federal and state authorization for.
Stormwater Management Initiative Update. ODOT’s Goal Develop a streamlined stormwater runoff treatment program to: Develop a streamlined stormwater runoff.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Completing the NEPA Process for CatEx Projects: Part 3 to CE Closeout.
Stormwater Management Initiative Update. ODOT’s Goal Develop a streamlined stormwater runoff treatment program to: Develop a streamlined stormwater runoff.
Section 404 Permits Update
ENVIRONMENTAL OPPORTUNITIES AND CONSTRAINTS ARCHAEOLOGICAL - HISTORICAL INVESTIGATIONS PERMITTING FOR UNAVOIDABLE ENVIRONMENTAL IMPACT AREA ENDANGERED.
Marin Coastal Permit Coordination Program. Why do we need a program? Called for in Watershed Plans: As many as 9 permits to consider for restoration.
Integrating Other Laws into BLM Planning. Objectives Integrate legal requirements into the planning process. Discuss laws with review and consultation.
Secondary & Cumulative Effects Analysis Training Program Maryland State Highway Administration’s Secondary and Cumulative Effects Analysis Guidelines For.
1 C E T A S Triage Presentation, Date Project Name Project location (city, county) ODOT Key Number:
Number of Copies Agency Submissions & Comments. Coordination ESRs are reviewed by OES and coordinated with resource agencies as part of the NEPA review.
Marin Coastal Watersheds Permit Coordination Program Marin Resource Conservation District U.S.D.A. Natural Resources Conservation Service Sustainable Conservation.
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
US Army Corps of Engineers BUILDING STRONG ® Carrie Bond Project Manager ODOT Liaison Portland, Oregon April 21, 2015 Understanding the Corps Permitting.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Locally Administered Federal-Aid Project Initiation Workshop Prospectus Part 3 and NEPA Requirements Presenter: Howard Postovit; ODOT Region 5 Region Environmental.
Salton Sea Species Conservation Habitat Scoping Meetings July 7 and 8, 2010.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
FEDERAL/STATE FUNDING EXCHANGE PROGRAM MICHELE RISKO, CEAO.
Section 4(f)/6(f) Categorical Exclusion Training Class.
Northeast Corridor Greenway Acquisition Project – Design and Permitting Status Update City Council Workshop August 25, 2015.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
US Army Corps of Engineers BUILDING STRONG ® Lisa Mangione Regulatory Division Los Angeles District January 14, 2016 USACE Regulatory Program Emergency.
August 19, 2015 Port Bienville Rail EIS Scoping Meeting Presented by: Rhea Vincent Mike McGuire.
Project Briefing for BROOKS BRIDGE REPLACEMENT STUDY and SANTA ROSA SOUND ALTERNATE CROSSING STUDY April 2015 SPEAKER: BOB.
Impact Analysis. Impact Analysis (204) ODOT attempts to avoid, and minimize impacts to the natural environment throughout the PDP process Despite these.
Orlando-Orange County Expressway Authority Project Development Process.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
Section 4(f) Categorical Exclusion Training Class.
Programmatic Agreements
2016 FHWA National Hydraulic Engineers Conference
Coal Mining Activities
Ferguson Slide Permanent Restoration Project
Coal Mining Activities
Michigan Dept. of Environmental Quality Water Resources Division
Consultation (C) After approval of the EIS, FONSI, or CE designation, the applicant shall consult with the Administration prior to requesting any major.
Presentation transcript:

Ecological Survey Reports The level of ESR Report is determined by the type of project and its probable level of impacts.

Ecological Survey Reports Ecological Survey Reports are coordinated with the resource agencies: U. S. Army Corps of Engineers U. S. Fish and Wildlife Service U. S. Environmental Protection Agency Ohio Department of Natural Resources Ohio Environmental Protection Agency

Ecological Survey Reports Three Levels of Ecological Survey Reports Level 1 Ecological Survey (was called the MOA report) Level 2 Ecological Survey Level 3 Ecological Survey: Includes 3 Reports Preliminary Draft Level 3 ESR Draft Level 3 ESR Final Level 3 ESR

Level 1 Ecological Survey Report Used to coordinate projects that meet the Memorandum of Agreement between ODOT, ODNR, FHWA and USFWS for Interagency Coordination for Highway Projects which involve Stream Crossings, Bank Stabilizations, and/or Minor Wetland Fills (1/12/11). Fulfills coordination and consultation requirements of the Fish & Wildlife Act and ESA, Section 7. Coordinated with USFWS and ODNR

Level 1 Ecological Survey Reports Projects that can be authorized under USACE Nationwide Permits, and/or require a Level 1 or 2 PAN. Bridge replacement/rehabilitation Minor road realignment Road widening Bike trail Slip repairs Stream erosion repairs along roadways Projects that may impact Scenic Rivers, State Listed species, or mussel beds will require project specific coordination, but may still be coordinated under the MOA, using the Level 1 ESR. If a specimen of a federally listed species is found in the project area, or a recent record of a federally listed species occurs within the project area, contact OES for instructions. What Projects Qualify?

Level 2 and 3 Ecological Survey Reports Projects that require Individual Waterway Permits Individual 404, Individual 401, and/or a Level 3 PAN Projects that will impact a National Scenic River below OHWM.

Level 2 and 3 Ecological Survey Reports Checklist of Environmental and Engineering Issues Requires literature review (portions can be used for the ESR) Requires field visit (quick review) The Project Initiation Package is not coordinated with the agencies Both Level 2 and Level 3 Reports Require a Project Initiation Package (Red Flag Summary)

Level 2 Ecological Survey Reports Example of Level 2 Project Areas

Level 3 Ecological Survey Reports Large complex projects (often new roads on new location) that require: Corridor Studies Feasibility Study Refinement of the preferred alternative Example Level 3 ESR Study Area

Level 3 Ecological Survey Reports Preliminary Draft Level 3 ESR Draft Level 3 ESR Final Level 3 ESR Level 3 ESR’s require submission of 3 Documents :

Level 3 Ecological Survey Reports Document #1: Preliminary Draft Ecological Survey Report Survey all of the ecological resources within a wide corridor(s). Used by ODOT to aid in the development of feasible alternative alignments. Preliminary Draft does not include a discussion of impacts (as no alternatives have been developed).

Level 3 Ecological Survey Report Document #2: Draft Ecological Survey Report Includes a discussion of the proposed feasible alternative alignments Includes a comparison of the impacts associated with each of the feasible alternative alignments Used to aid in the selection of a preferred alternative

Level 3 Ecological Survey Reports Document #3: Final Ecological Survey Report Used to follow up ecological survey reports with final impacts (including wetland delineations and final stream assessments) on the PREFERRED ALTERNATIVE ONLY. Used in the jurisdictional determination field review with the USACE and OEPA. Data used to prepare the U.S. Army Corps of Engineers 404 Permit and the Ohio EPA’s 401 Water Quality Certification.

Survey and Report Selection Flowchart

Supplemental Information Any level of project may require additional resource specific coordination, such as: Coastal Consistency if project is located within Coastal Management Zone (Lake Erie). State and National Scenic River Coordination if project is located within 1,000 feet of a designated wild or scenic river... Federally Listed Species: Biological Assessment Biological Opinions State Listed Species.

Things To Remember Three Levels of Ecological Survey Reports Level 1 (MOA projects) Level 2 Level 3 (3 separate report submissions) IMPORTANT: Consultants need to work with the ODOT District environmental staff so that projects are scoped for the correct level of effort and ecological report.

Ecological Survey Reports All information regarding ecological surveys and reporting can be found on the ODOT-OES website: cal_Resources_Permits/Ecology/Pages/MANUALSANDFORMS.aspx cal_Resources_Permits/Ecology/Pages/MANUALSANDFORMS.aspx

QUESTIONS ? Carex typhina