Brief Background on HIAPER Aircraft Instrumentation Solicitation (HAIS)  Measurement priorities for HIAPER established as a result of discussions held.

Slides:



Advertisements
Similar presentations
Planning Collaborative Spaces in Libraries
Advertisements

[Imagine School at North Port] Oral Exit Report Quality Assurance Review Team School Accreditation.
Stocker - Page 1Evolution Measurement Based System-IGARSS 2006 Aug 1, 2006 Evolution of a Measurement-Based Data Processing System for Precipitation Erich.
TEN-T Info Day for AP and MAP Calls 2012 EVALUATION PROCESS AND AWARD CRITERIA Anna Livieratou-Toll TEN-T Executive Agency Senior Policy & Programme Coordinator.
CLIMATE MONITORING FROM SPACE -- challenges, actions & perspectives Yang Jun China Meteorological Administration WMO Cg-XVI Side Event An architecture.
Southeast Climate Consortium Extension Program C. W. Fraisse, J. Bellow, N. Breuer, V. Cabrera, J. W. Jones, K. Ingram, and G. Hoogenboom.
International Civil Aviation Organization TECHNICAL CO-OPERATION BUREAU PROCUREMENT SECTION Procurement of Civil Aviation Goods and Services.
Unclassified Performance Management Process For Unclassified Administrative and Professional (Non-Teaching) Employees Summer 2011.
IBM Corporate Environmental Affairs and Product Safety
Portfolio Management, according to Office of Management and Budget (OMB) Circular A-16 Supplemental Guidance, is the coordination of Federal geospatial.
November 8, 2011 Oklahoma House of Representatives Government Modernization Committee.
The CTCN Services UNEP – March 5th, 2014, Nairobi, Kenya.
YES New Mexico Enterprise Eligibility System
Roadmap for Sourcing Decision Review Board (DRB)
How to commence the IT Modernization Process?
Internal Control–Integrated Framework
Goal Preparation and Alignment Review of Superintendent, District and Board Goals for
© Prentice Hall CHAPTER 10 Alternative Approach: Purchasing Systems.
Lecture 8 Selecting a Healthcare Information System (Chapter 8)
February High Impact Weather Workshop 1 JCSDA-HFIP and -ECMWF Workshop Recommendations Lars Peter Riishojgaard and Sid Boukabara Joint Center for.
Polar Highly Elliptical / Molniya Orbit Science (PHEMOS) Mission Phase 0/A Studies Mid-Term Review Meetings January 12-14th, 2011.
Technology Advisory Committee (TAC) Charge Familiarize itself with strategic plans and emerging technologies. Evaluate issues and opportunities associated.
Software Project Transition Planning
Federal Transit Administration Office of Safety and Security FTA BUS SAFETY & SECURITY PROGRAM 18 th NATIONAL CONFERENCE ON RURAL PUBLIC AND INTERCITY.
1 Purchasing and Procurement Processes Module Four Revision Date: 2/06/2015.
Senior Review Evaluations (1 of 5) Proposals due: 6 March 2015 Panel evaluations: Week of 22 April 2015 Performance factors to be evaluated will include.
Release & Deployment ITIL Version 3
PMSS Final SOW May 22 nd, Statement of Work 2 GLENN RESEARCH CENTER PROJECT MANAGEMENT SUPPORT SERVICES (PMSS) The Contractor shall provide expert.
Unique, high elevation, mountain-top atmospheric research facility readily accessible under all weather conditions!!! Dr. A. Gannet Hallar Director
Foundation Degree IT Project Methodologies (for reference)
Reorganization at NCAR Presentation to the UCAR Board of Trustees February 25, 2004.
1 Framework Programme 7 Guide for Applicants
AL-QADISIYIA UNIVERSITY COLLEGE OF ENGINEERING SELF ASSESSMENT REPORT Submitted by SAR committee.
National Science Foundation GEOGeosciences HIA PER High-Performance Instrumented Airborne Platform for Environmental Research.
SSSC 02/18/2010 P. Marcum Science Utilization Policies SOFIA SCIENCE UTILIZATION POLICIES Pamela M. Marcum SOFIA Project Scientist SSSC Feb 19, 2010.
Al Cooper Jeff Stith Earth Observing Laboratory (EOL) HIAPER Debrief 9 November 2005 Ongoing Development and Support: EOL Plans for Deployment of HIAPER.
Acquisition Strategy Under the laws of the State of Colorado Commercial acquisition practices to be utilized.
Coordination Group for Meteorological Satellites - CGMS Climate Monitoring Architecture: Status and way forward Presented to CGMS-41 plenary session.
16 1 Installation  After development and testing, system must be put into operation  Important planning considerations Costs of operating both systems.
Project Overview Background –The National Center for Atmospheric Research (NCAR) operates a Gulfstream V mid-altitude jet aircraft primarily to conduct.
T-PARC Operations Plan Outline Chapter 1. T-PARC Overview Chapter 2 Scientific Mission Planning Organization and Intensive Observing Period Definition.
ASA Board Membership Board Members: (vote) Four Paraguayan Citizens Four U.S. Citizens One Third-country National Ex-Officio Members: (voice but no vote)
Science, research and development European Commission IDARI Project Meeting Tartu, June 2005 Martin Greimel Scientific Officer Directorate-E ‘Biotechnology,
A NASA / NSF / NRL airborne field campaign focusing on atmospheric composition, chemistry, and climate over Southeast Asia. Programmatic Context, Issues.
Ken Jucks and Diane Wickland Carbon Monitoring System: The NASA HQ Perspective November 13, 2014.
Task NumberHarmonise, develop & implement capacity building Performance Indicators CB-07-01c Harmonise efforts by Tasks, in particular those related with.
A NASA / NSF / NRL airborne field campaign focusing on atmospheric composition, chemistry, and climate over Southeast Asia. Programmatic Context, Issues.
Chapter 11: Alternative Approach - Purchasing Systems.
CIRES-CDC Institutional Partnership Western Water Assessment Review Randall M. Dole, Director Climate Diagnostics Center September 2001.
1 Physical and Social Sciences Research Task Team: Final Report Alexander E. MacDonald NOAA Earth System Research Laboratory July 25, 2006 A Presentation.
Working together to advance Road Weather Information Systems (RWIS) technology.
Office of Core and Shared Resources Faculty Council Meeting October 9, 2012.
Course, Curriculum, and Laboratory Improvement (CCLI) Transforming Undergraduate Education in Science, Technology, Engineering and Mathematics PROGRAM.
Elementary School Administration and Management GADS 671 Section 55 and 56.
Teacher Evaluation 張媛甯 資料來源: Handbook on Teacher Evaluation (Chapter 1-3) (Chapter 1-3) J. H. Stronge & P. D. Tucker 著.
State of Georgia Release Management Training
Abstract Each July, the Association for Unmanned Vehicle Systems International holds an annual International Aerial Robotics Competition (IARC), with major.
What aircraft and instruments might I use for my research and do I find out about it/them? Jeff Stith Photo by Grant Gray, EOL.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
1 - What are the local, regional, and continental-scale exchanges of carbon, nitrogen, and reactive species? What are their relationships to underlying.
November 12, 2009 PM Process Improvement Plan: Employee Presentation.
THE INTRODUCTION AND SUPPORT OF RESEARCH PROJECTS AS PART OF THE FUTURE ROLE OF THE RCARO Dr Waqar Ahmad Dr John Easey.
Lidar Radar Open Software Environment Mike Dixon, Wen-Chau Lee Mike Daniels, Charlie Martin Steve Cohn, Bill Brown Earth Observing Laboratory (EOL) National.
LIGO-G M Managing LIGO: Lessons for a Collaboratory Gary Sanders LIGO/Caltech NEES Awardees Meeting NSF, December 19, 2001.
Data Coordinating Center University of Washington Department of Biostatistics Elizabeth Brown, ScD Siiri Bennett, MD.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
Reducing Emissions from Livestock Research Program Research Program structure and objectives Progress on contracts etc Understand Expectations – DAFF and.
THE INTRODUCTION AND SUPPORT OF RESEARCH PROJECTS AS PART OF THE FUTURE ROLE OF THE RCARO Dr Waqar Ahmad Dr John Easey.
2 Selecting a Healthcare Information System.
North American ALMA Development Program
Presentation transcript:

Brief Background on HIAPER Aircraft Instrumentation Solicitation (HAIS)  Measurement priorities for HIAPER established as a result of discussions held during the HIAPER Instrumentation Workshop at NCAR in November  Members of the HIAPER Advisory Committee (HAC) developed the summary of priorities that was used as the basis for the NSF HAIS.  Investigator equipment packages designed to provide measurements in the following categories were encouraged in response to the HAIS: Aerosols and cloud microphysics Gas phase chemistry Radiation, clouds, and climate Large-scale dynamics of weather systems Sensing systems for geosciences and biosciences applications

Sensor Categorization Categorization dictated by the ease with which a given instrument can be integrated onto the GV and the level of effort that will be required for ongoing sensor maintenance and support. Standard use: Likely to be called on for most missions and will not require extensive modification or R&D effort to implement. Following completion and delivery, such sensors will be maintained and operated by NCAR/Earth Observing Laboratory (EOL) staff. Routine operational: Technologies that can be readily adapted to HIAPER following a relatively short R&D effort, after which the developed sensor can be transitioned to NCAR for maintenance and operation perhaps as a Standard instrument. During development, deployment of this type of instrument may require additional support personnel and funds and possibly additional expertise in the processing, analysis, and release of data. These sensors to be made available upon request. Could be operated and maintained by NCAR personnel, with some level of involvement by the originating PI. Research: Developing technologies that require a continued R&D effort. Such sensors will require extensive PI involvement in the development and evaluation and will likely not be turned over to NCAR for routine operations for several years after the start of the development effort. Continued involvement of the PI or research group likely to be required for particular mission deployments and during data interpretation and analysis. Essential for NCAR and NSF to understand the category intended for each of the HAIS awarded developments in order to begin assessing requirements (personnel and financial) for ongoing support of the instruments following completion and delivery.

Designing the Next Generation of Airborne Instrumentation – Goals and Requirements Desired GV Sensor Attributes Small Light weight Low power Autonomous Meet FAA/RAF design requirements Intelligent and communicative Robust Simple to install Multi-platform compatible Fast operation characteristics (higher sampling rates related to increased dynamic effects) The characteristics of the GV platform – smaller payload capability, limited cabin space and available power – require that members of the scientific community adopt new approaches to instrumentation design. Consider: GVNSF/NCAR C-130 Cabin Length50.1 ft (15.3 m)40.4 ft (12.3 m) Cabin Height6.2 ft (1.9 m)9.0 ft (2.7 m) Cabin Width7.3 ft (2.2 m)10.0 ft (3.0 m) Max. Scientific Payload7,900 lbs (3,583 kg)13,000 lbs (5,897 kg)

Additional Notes  As outlined in the NSF HAIS, instruments developed using the $12.5M of HIAPER funding are to become part of the community’s core of pool and shared instruments. Instruments will, in the majority of cases, be required to reside at NCAR, and each instrument will carry a NSF property tag.  Developers required to adhere to instrumentation design and construction requirements as called out in the NSF/NCAR GV Investigator’s Handbook.

Contracting Responsibility for making and administering awards transferred to UCAR by NSF MREFC guidelines must be followed during the award and development of instruments using this $12.5M Therefore: –Milestone payments established to monitor progress –Deliverables (to accompany the instrument) to include: Sensor operation, integration, and calibration info. Data processing algorithms and software –Reporting requirements –Acceptance criteria

Contracting, cont’d Role of Technical Representatives (TRs) Role of Contract Administrators (CAs) Questions for Operations & Maintenance Testing Warranty Negotiations