MATS Compliance Initiative at Grant Town Power Plant.

Slides:



Advertisements
Similar presentations
Parallel Flow Visualization/Mitigation Proposal
Advertisements

Kim Erickson, President
Joe Chaisson April 21, Integrated Coal Gasification Combined Cycle (IGCC) Power Plants and Geologic Carbon Sequestration Joe Chaisson.
Duke Power Clean Smokestacks & Mercury Efforts April, 2004.
Northampton Generating Company, L.P. Northampton, PA
Arsenic/Iron Co-Precipitation and High Rate Filtration in the City of Portage Christopher Barnes, P.E., City of Portage Kendra Gwin, P.E., City of Portage.
MicroMistTM Wet Scrubber Advanced Scrubbing Technology
1 BOILERS AND EFFICIENCY Gary Archer Vice President of Sales JW Stevens Co.
Carbon Capture & Storage: Why we need a campaign against Longannet Mandy Meikle Scotland Against New Coal Scottish Climate Camp 13 June 2009.
Co-firing Biomass with Coal for Power Generation Suthum Patumsawad Department of Mechanical Engineering King Mongkuts Institute of Technology North Bangkok.
U.S. Energy Information Administration Independent Statistics & Analysis 2014 Electricity Forms Re-clearance Vlad Dorjets, Form EIA-860 Project.
Attachment 5. Environmental Compliance EPA Regulations March
COMBUSTION CONTROL IN BOILERS 1 Dept. of Electronics & Instrumentation, Narayana Engineering College, Nellore.
Florida Department of Environmental Protection David Read Cement Subproject Manager Bureau of Air Regulation Cement Mercury Subproject.
Harmonization of Part 60 and Part 75 CEM Requirements Robert Vollaro
10 February 2009 The Case for Coal Generation Sandy Rae, Energy Management Director.
RPG: September 24, Approach for ERCOT Independent Review of the 2013 Houston Import Project Jeff Billo, Manager, Transmission Planning September.
Ronald L. Baker Robert Peters Edul Chikhliwala EcoChem Analytics
940-1 MECS INC Meeting EPA Consent Decree Compliance with DynaWave Scrubbing Presented by Larry Paschke. Presented by Larry Paschke.
CAIR & MATS 2012 Southern Sectional AWMA Annual Meeting & Technical Conference September 12, 2012 Chris Goodman, P.E. Environmental Strategy.
1 AEP Perspectives on Development and Commercialization of CCS Technology for Natural Gas Power Generation Matt Usher, P.E. Director – New Technology Development.
Welcome to the Presentation of Plasma Based Industrial Desulphurisation & Denitrification Plant from flue Gas.
Financial Model.
Cogeneration Facility The University of North Carolina at Chapel Hill Cogeneration Systems Energy Services Department Phil Barner- Cogeneration Systems.
Nitrogen Oxides (NO x ) Chapter 12 Page NO x emissions include: Nitric oxide, NO, and Nitrogen dioxide, NO 2, are normally categorized as NO.
DSI Options for MATS Compliance Pat Mongoven ARIPPA Aug 2013.
Control of Sulfur Oxides Dr. Wesam Al Madhoun
Evolution of Coal-Fired Fluidized Bed Technology and Potential Operations Constraints.
PM fine Quantification Ron Myers OAQPS/SPPD/MPG 1/30/2013 Perceptions about Ammonia Slip, Acid Gases, Condensable Particulate Matter and Applicable Test.
Recent EPA Regulation Development Presented by Bill Luthans to the 56 th Meeting of the Joint Advisory Committee Meeting for the Improvement of Air Quality.
Wes Thornhill, Chief Industrial Chemicals Section Air Division
The ProRak™ Advantage An introduction to Hg Process Monitoring and Feedback Control.
Advanced Biomass-based Combined Heat and Power System Combined Heat & Power in the Pacific Northwest October 15, 2002 Nathan E. Carpenter Manager, Energy.
Combined Heat and Power and Air Quality - Guidance for Local Authorities Ed Dearnley Policy Officer.
IPCC Synthesis Report Part IV Costs of mitigation measures Jayant Sathaye.
Alternative Energy Overview and Cofiring Biomass at Cogen Cogen Neighbor Meeting April 28, 2010.
Title 4 Compliance Options ©2002 Dr. B. C. Paul. Band aide Approach  Buy Credits –Have been abundant because of aggressive compliance – could be running.
Overview of Environmental Regulations and Drought Impacts in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT July 13, 2015.
American Legislative Exchange Council America’s Clean Air Success Story and the Implications of Overregulation November 28, 2012 Thomas W. Easterly, P.E.,
Massachusetts’ Power Plant Mercury Regulations Sharon Weber Massachusetts Department of Environmental Protection WESTAR Fall Business Meeting - September.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
Lecture Objectives: Finish boilers and furnaces Start with thermal storage systems.
Lecture Objectives: Continue with power generation Learn basics about boilers and furnaces.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
10 th June 2008 Workshop on Clean Coal Technologies Regional Office of Silesia in Brussels.
Colorado Springs Utilities Drew A. Rankin, General Manager Energy Supply.
UTILITY MACT WORKING GROUP STATE AND LOCAL STAKEHOLDER RECOMMENDATIONS.
Objectives -Discuss Final Project -
Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.
Mercury MACT Emission Standard: Format and Compliance A Presentation by Larry Monroe for the Industry Stakeholders at the EPA’s MACT Working Group Washington.
Massachusetts Multi-pollutant Power Plant Regulations Sharon Weber Massachusetts Department of Environmental Protection EPA Utility MACT Working Group.
STEAM POWER PLANTS.
Coal From where does it come? What happens when it is burned?
Progress Energy Issues Overview April 25, 2006 Don Cooke Sr. Environmental Coordinator.
Eco·Systems, Inc.. Beneficial Reuse of Industrial Byproducts Definition- turning an industrial byproduct into a valuable commodity Examples – Coal Combustion.
Practical Treatment of Produced and Flow-back Waters for Re-use or Surface Discharge Eric Ringler, Bill Chatterton (SR) Joon H. Min, Allen Chan (BKT Co.
Emission source sampling and monitoring Topic 6 Ms Sherina Kamal May
Operational Improvements at the Grant Town Power Plant Presented By: Steve Friend Sr. Plant Engineer Edison Mission O&M 2005 ARIPPA Technical Symposium.
Air Pollution Challenges Kentucky Coal Association April 29, 2013 Thomas W. Easterly, P.E., BCEE Commissioner Indiana Department of Environmental Management.
Impacts of Environmental Regulations in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT January 26, 2016.
Proposed Carbon Pollution Standard For New Power Plants Presented by Kevin Culligan Office of Air Quality Planning And Standards Office of Air and Radiation.
ANLEC R&D COMMUNICATION PACK ( ). Trace emissions from Oxy Combustions do not pose significantly higher health, environmental or operational.
Community Choice Aggregation Demonstration Project Marin County Base Case Feasibility Analyses Overview April 5, 2005.
Biomass Power Generation : Recent Trends in Technology and Future Possibilities Narasimhan Santhanam Energy Alternatives India,
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
BIOENERGY IN ELECTRICITY GENERATION
NSPS Rulemakings for Greenhouse Gas Emissions
Particulate (Fly Ash) Removal
Control of Sulfur Oxides Dr. Wesam Al Madhoun
IEA Workshop Edinburgh, 12th November 2001 Kenneth Möllersten
Presentation transcript:

MATS Compliance Initiative at Grant Town Power Plant

Background Information Grant Town looked at requirements of MATS and learned early on in that process that Acid Gas emissions were likely our biggest hurdle to overcome Stack testing confirmed HCl emissions were some 12x higher than the proposed limit in MATS – lb/mmBTU versus the limit of lb/mmBTU Typical SO 2 emissions average 0.5 – 0.55 lb/mmBTU thus requiring a 90% SO 2 removal efficiency per requirements of the WVDEP air permit. In order to comply with the surrogate HCl limit, SO 2 emissions would need to be reduced to less than 0.20 lb/mmBTU – excess of 96% SO 2 removal Staff was not initially sure that additional limestone injection alone would meet the surrogate limit

Initial Testing Series of three test periods using additional limestone injection to meet HCL surrogate have been run – latest during CEMS RATA testing of 2014 Consistently have met surrogate limit with no observed detriments to boiler operation in the short term i.Limestone Feed System able to keep pace with increased input – appears input increases about % to meet lower SO 2 limit ii.Ash systems able to handle additional loading without limitation iii.Limestone processing system capable of additional production to meet increased demand – increased run time from a average of 10 hours per day to approximately 12 hours per day iv.With limited test intervals, boiler tube erosion rates have not been quantified, though certainly would increase with additional limestone feed

Initial Reactions Even though additional limestone feed had proven compliance to the HCl surrogate was possible, several items needed to be considered moving forward with this option: a.Reliability of the current limestone feed system and limestone processing system to meet boiler production demands b.Cost of supply of additional limestone and could the current supplier meet those levels of supply c.Erosion impacts on the boiler tubing – in particular the combustor waterwalls d.Other operational impacts Baghouse bag life Wear and tear on ash handling systems Expense of additional limestone processing

Thoughts for Alternative Compliance Options In 2010, Grant Town had been approached by EnviroResolutions to test a “hybrid” scrubber design that had been developed for control of particulates from diesel powered ships in the marine industry EnviroResolutions had tested their concept scrubber on a biomass fired facility and found that by varying the solution of the scrubber medium significant reductions in SO 2 could be achieved Looking to test on a coal fired facility for proof of concept and that SO 2 emissions could be reduced enough to prove the technology as a viable alternative to conventional post-combustion control technologies Grant Town agreed to test pilot scale system – thought at that time the system might offer more economic approach to SO 2 control

EnviroResolution Pilot Scale Unit

Pilot Scale Test Slip stream of flue gas taken from Boiler B to the pilot scale unit – approximately 1.5% of total boiler combustion gas flow – about 2,000 ACFM SO 2 measurements taken at inlet and outlet to the test unit to verify reduction Three test runs using hydrated lime as the scrubbing fluid Results indicated high levels of SO 2 removal a)Average SO 2 in to test unit – 157 ppm b)Average SO 2 out from test unit – 1.32 ppm c)Average Removal Efficiency – 99.2% Results confirmed that the technology was likely a good fit for additional SO 2 control – considered as an option for CAIR/CSAPR compliance at that time but not implemented

EnviroResolutions and MATS Compliance As more became know with the MTAS program, EnviroResolutions was approached by Grant Town to consider their system as an alternative to provide control for Acid Gas Emissions Options considered included a modular approach to control emissions from one boiler or a slip stream of both boilers to reduce SO 2 to the HCl surrogate Initial design concept was to reduce SO 2 emissions just low enough to meet MATS Modelling lead us to believe the entire SO 2 scheme could be realized using the EnviroResolutions system Entered into agreement with EnviroResolutions to complete additional modeling, economic analysis and independent third party feasibility study to determine if the technology was viable for a CFB application

EnviroResolutions and MATS Compliance Issues with combining cooled stack gas from the scrubber outlet back with the uncooled gas from the other boiler/remaining from the slipstream led to a change in the conceptual design Current concept has a total of 6 scrubber modules to provide 100% SO 2 control Modeling and analysis of our current limestone supply would indicate that it would be acceptable for the scrubbing fluid for the system – current processing system could be used to grind the raw limestone to a size consist suitable for mixing for the scrubber Significant reduction in the amount of limestone consumed to meet compliance versus the amount required to meet the MATS HCl surrogate

Preliminary Design

Concerns with Current Design Concept Beyond proof of concept – items to consider moving forward: Will the CFBs be able to maintain steaming rate if limestone is no longer added to the combustor Disposal of the scrubber residual sludge could present an issue with ash disposal i.Storage of residuals during periods when ash is not being unloaded ii.Impact of residual on ash stream quality – beneficial reuse status impacts – modeled but not physically proven iii.Stability concerns for ash disposal areas Affordability of the project if economic justification proves beneficial Impacts to other CFB/IPP operators

Current Status Grant Town obtained an extension of the MATS compliance deadline from WVDEP moving our compliance date until April 16, 2016 MPR Associates currently finalizing initial draft of the feasibility study review for proof of concept Detailed economic analysis to be completed once feasibility study report finalized and pricing proposals are firmed up Considering/pursuing other post combustion scrubber options as well i.MHPSA Post Combustion Controls ii.CBPGA Post Combustion Controls

Potential GHG Impact Although not fully quantified at the time of this presentation, the scrubber could offer potential reductions in the emissions of CO 2 given the reduction in the amount of limestone required for SO 2 compliance. More research and modeling will need to be completed to fully understand the potential benefits of CO 2 reduction

Questions???