LM 2.8 km PROGN TIEDTKE CICLO DI ASSIMILAZIONE (durata: 12 ore ) Ora di inizio run: 12 UTC del 30/10/03 CICLO DI SIMULAZIONE (durata:36 ore) Ora di inizio.

Slides:



Advertisements
Similar presentations
Fill in missing numbers or operations
Advertisements

AP STUDY SESSION 2.
1
1_Panel Production. 380 pannelli 45 giorni di produzione = 8.4 pannelli/day.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 40.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
Objectives: Generate and describe sequences. Vocabulary:
How many hours have passed from 6:00 P.M. to 9:00 P.M.? C. 3 hours B. 6 hoursA. 9 hours.
AS. 02/03 Finding fractions of a quantity AS. 02/03.
Demands and expectations at SMHI on the European Reanalysis for observations and climate Per Und én Tomas Landelius SMHI.
Office for Harmonization in the Internal Market (Trade Marks and Designs) 9th Designs Liaison Meeting – 7 October 2010 – Item No. 4.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Norwegian Meteorological Institute met.no TEPS/LAMEPS at met.no Marit Helene Jensen, Inger-Lise Frogner, Hilde Haakenstad and Ole Vignes.
The COSMO-LEPS system at ECMWF
Deutscher Wetterdienst Central Forecasting DWD ECMWF Forecast Product Users Meeting June Predicting severe weather by EPS tools - current.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt 5 pt 1pt Simplify All mixed up Misc. AddingSubtract.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Click here Can you work out the answer? 20 ÷ 4 =
The University of Reading Helen Dacre AMS 2010 Air Quality Forecasting using a Numerical Weather Prediction Model ETEX Surface Measurement Sites.
ZMQS ZMQS
High resolution LMK-simulations (1 km) for extreme precipitation events in southern Germany J.W. Schipper Institute for Meteorology and Climate Research,
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
What Time Is It? Lesson by Mrs. Moody, FLE. M1M2 Students will develop an understanding of the measurement of time. a Tell time to the nearest hour and.
Break Time Remaining 10:00.
This module: Telling the time
© Richard A. Medeiros 2004 x y Function Machine Function Machine next.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
Bright Futures Guidelines Priorities and Screening Tables
3-5 Warm Up Problem of the Day Lesson Presentation
The challenge ahead: Ocean Predictions in the Arctic Region Lars Petter Røed * Presented at the OPNet Workshop May 2008, Geilo, Norway * Also affiliated.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
15. Oktober Oktober Oktober 2012.
Version 1.0, 30 November 2004 Slide: 1 APPLICATIONS OF METEOSAT SECOND GENERATION (MSG) DETECTION OF CONTRAILS Author:Jochen Kerkmann (EUMETSAT)
Version 1.0, 30 November 2004 Slide: 1 METEOSAT SECOND GENERATION (MSG) FIRE DETECTION Author:Jochen Kerkmann Contributors:P. Menzel.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
We are learning how to read the 24 hour clock
1..
4m 3m Diagrams Not to scale Perimeter of Composite Shapes ? ? ? Perimeter = 4 m + 7 m +3m + 1m += 22m 4m 3m 1m.
UNIT 2: SOLVING EQUATIONS AND INEQUALITIES SOLVE EACH OF THE FOLLOWING EQUATIONS FOR y. # x + 5 y = x 5 y = 2 x y = 2 x y.
LO: Count up to 100 objects by grouping them and counting in 5s 10s and 2s. Mrs Criddle: Westfield Middle School.
Do Now 10/22/ = 10 = ? Copy HW in your planner.
Subtraction: Adding UP
: 3 00.
5 minutes.
Institut für Physik der Atmosphäre Institut für Physik der Atmosphäre Object-Oriented Best Member Selection in a Regional Ensemble Forecasting System Christian.
Deutscher Wetterdienst Zentrale Vorhersage DWD Workshop "Use and Verification of LEPS products", Geneve, May, Verification of LEPS products.
Essential Cell Biology
Clock will move after 1 minute
PSSA Preparation.
Practice Skip Counting
Slide: 1 Version 0.3, 20 January 2004 METEOSAT SECOND GENERATION (MSG) METEOROLOGICAL USE OF THE SEVIRI HIGH-RESOLUTION VISIBLE (HRV) CHANNEL Contact:Jochen.
Number Factors and Multiples Saturday, 09 September 2006 ©RSH.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Anupam Saxena Associate Professor Indian Institute of Technology KANPUR
COSMO-SREPS COSMO Priority Project C. Marsigli, A. Montani and T. Paccagnella ARPA-SIM, Bologna, Italy.
COSMO-SREPS Priority Project C. Marsigli ARPA-SIM - HydroMeteorological Service of Emilia-Romagna, Bologna, Italy.
Presentation transcript:

LM 2.8 km PROGN TIEDTKE CICLO DI ASSIMILAZIONE (durata: 12 ore ) Ora di inizio run: 12 UTC del 30/10/03 CICLO DI SIMULAZIONE (durata:36 ore) Ora di inizio run: 00 UTC del 31/10/03 LM 7 km PROGN TIEDTKE ANALYSIS 31/10/03 00 UTC NESTING ECMWF global model I.C. and B.C. LM 7 km PROGN TIEDTKE NESTING i.c e b.c LM 2.8 km PROGN EXPL. CONV. NESTING ECMWF global model B.C. I.C.

LM 2.8 km PROGN TIEDTKE CICLO DI ASSIMILAZIONE (durata: 12 ore ) Ora di inizio run: 12 UTC del 30/10/03 CICLO DI SIMULAZIONE (durata:36 ore) Ora di inizio run: 00 UTC del 31/10/03 LM 7 km PROGN TIEDTKE ANALYSIS 31/10/03 00 UTC NESTING DWD global model I.C. and B.C. LM 7 km PROGN TIEDTKE NESTING DWD global model B.C. I.C. I.C. and B.C.

cumulated between 00 UTC OF of 31/10/2003 and 00 UTC of 01/11/2003 OBSERVED PRECIPTATION

7 KM - DWD GLOBAL MODEL OPERATIONAL MODEL

7 KM - DWD GLOBAL MODEL + PROGN

7 KM - ECMWF GLOBAL MODEL + PROGN

2.8 KM - DWD GLOBAL MODEL + PROGN

2.8 KM ECMWF GLOBAL MODEL + PROGN

2.8 KM - ECMWF GLOBAL MODEL + PROGN + EXPL

OBSERVED COMPARISONS 7KM DWD ECMWF 7KM DWD 2.8 KM ECMWF 2.8 KM ECMWF 2.8 KM EXPL

DIFFERENCES BETWEEN OPE (7km DWD) and OBS DIFFERENCES BETWEEN 7KM DWD PROGN and OBS +24 TOTAL PRECIPITATION

DIFFERENCES BETWEEN 7KM DWD PROGN and OBS DIFFERENCES BETWEEN 7KM ECMWF PROGN and OBS

DIFFERENCES BETWEEN 2.8 KM DWD PROGN and OBS DIFFERENCES BETWEEN 2.8 KM ECMWF PROGN and OBS

DIFFERENCES BETWEEN 2.8 KM ECMWF PROGN EXPL and OBS

DIFFERENCES BETWEEN 2.8 KM ECMWF EXPL and 2.8 KM ECMWF TIEDTKE

OROGRAPHY AND PRECIPITATION Latitudinal section at km DWD PROGN 7km DWD (OPE) 7km ECMWF PROGN Different scales for precipitation!

2.8km ECMWF PROGN EXPL2.8km ECMWF PROGN 2.8km DWD PROGN OROGRAPHY AND PRECIPITATION Latitudinal section at Different scales for precipitation!

OROGRAPHY LM 7 KM upwind downwind

OROGRAPHY LM 2.8 KM upwind downwind

Fine

DIFFERENCES BETWEEN ECMWF 7KM and DWD 7KM TOTAL PRECIPITATION DIFFERENCES BETWEEN ECMWF 7KM and OPE TOTAL PRECIPITATION

DIFFERENCES BETWEEN DWD 7KM and OPE TOTAL PRECIPITATION DIFFERENCES BETWEEN ECMWF 7KM and DWD 7KM TOTAL PRECIPITATION

DIFFERENCES BETWEEN DWD 2.8 KM and DWD 7 KM TOTAL PRECIPITATION DIFFERENCES BETWEEN DWD 2.8 KM and OPE TOTAL PRECIPITATION

DIFFERENCES BETWEEN ECMWF 2.8 KM and ECMWF 7 KM TOTAL PRECIPITATION DIFFERENCES BETWEEN ECMWF 2.8 KM and OPE TOTAL PRECIPITATION

DIFFERENCES BETWEEN DWD 2.8 KM and ECMWF 2.8 KM TOTAL PRECIPITATION DIFFERENCES BETWEEN 2.8 KM ECMWF EXPL and OPE (7KM DWD)