The new IGFS Service: “GGP-ICET Service” From the Earth Tides Symposium in Warsaw.

Slides:



Advertisements
Similar presentations
Future Directions and Initiatives in the Use of Remote Sensing for Water Quality.
Advertisements

WECC Operating Committee Report WECC Member Meeting April 20, 2006.
The quest for a consistent signal in ground and GRACE gravity time series M. Van Camp – B. Meurers – O. de Viron L. Métivier – O. Francis Special thanks:
Philip L. Woodworth Permanent Service for Mean Sea Level With an enormous amount of assistance from Norman Teferle and Richard Bingley University.
An estimate of post-seismic gravity change caused by the 1960 Chile earthquake and comparison with GRACE gravity fields Y. Tanaka 1, 2, V. Klemann 2, K.
March 25, 2002EarthScope CSIT Workshop Data Archiving and IT Issues for PBO Douglas Neuhauser UC Berkeley Seismological Lab Northern California Earthquake.
1 Time Variations of the European Gravity Field, David Crossley, Saint Louis University, Missouri, USA Jacques Hinderer, EOST / IPG, Strasbourg,
Limits of static processing in a dynamic environment Matt King, Newcastle University, UK.
VieVS User Workshop 14 – 16 September, 2011 Vienna VIE_MOD stations corrections Hana Spicakova.
International Terrestrial Reference Frame - Latest Developments Horst Müller 16th International Workshop on Laser Ranging, Poznan, Poland, October
The IGWCO Transition into GEO August 2007 IGWCO Secretariat 7bis, avenue de la paix CH-1211 Geneva 2.
Environmental Geodesy Lecture 10 (March 29, 2011): Surface displacements, strain and stress - Displacements, Strain, Stress, Momentum Balance - Spectrum.
VieVS User Workshop 7 – 9 September, 2010 Vienna VIE_MOD station corrections Hana Spicakova.
Commission 3 Earth rotation and Geodynamics Véronique Dehant.
August 13-19, 2010Data Management Workshop Foz do Iguassu- Brazil Seismic Quality Assurance Rick Benson IRIS DMC Rick Benson IRIS DMC.
WE WA VI ST PE MO MB MC CO BH MC MB MO PE ST VI WA Comparison of GRACE gravity field solutions, hydrological models and time series of superconducting.
Linking GPS to Tide Gauges and Tide Gauge Benchmarks Tilo Schöne GeoForschungsZentrum Potsdam Understanding Sea-level Rise and Variability, WCRP Workshop,
Moving Beyond IGY: An electronic Geophysical Year (eGY) Concept D.N. Baker Laboratory for Atmospheric and Space Physics University of Colorado - Boulder.
CloudNet: TARA status and database H. Russchenberg, O. Krasnov Delft University of Technology – IRCTR, The Netherlands.
Chapter 8: The future geodetic reference frames Thomas Herring, Hans-Peter Plag, Jim Ray, Zuheir Altamimi.
NKG Working Group for Geodynamics Copenhagen, 23 –24 April, AGrav - Establishing a Database for Absolute Gravity Observations Herbert Wilmes, Hartmut.
Outline  Construction of gravity and magnetic models  Principle of superposition (mentioned on week 1 )  Anomalies  Reference models  Geoid  Figure.
DRAFT 2015 RTF Work Plan August 12, Work Plan Development Process RTF 2015 work plan ProcessDate Develop draft work plan and present to Operations.
NKG Working Group for Geodynamics Copenhagen, 23 –24 April, Tasks of a new Working Group on Absolute Gravimetry Herbert Wilmes Federal Agency for.
Secular variation in Germany from repeat station data and a recent global field model Monika Korte and Vincent Lesur Helmholtz Centre Potsdam, German Research.
Interim Executive Director June  Financial Management Practices Audit Results Fiscal Year Audit Results Fiscal Year Internal.
NIMAS National Instructional Materials Accessibility Standard OSEP Project Directors Conference July 31, 2006 Chuck Hitchcock Director, NIMAS TA Center.
FFSC Annual Meeting -- 1 Technical Committee Report  Three issues: Accounting for hedging transactions Update of Section IV Pending Changes to the Financial.
PBO Strainmeter Products Strainmeter Short Course Earthscope Meeting May 12, 2009 Strainmeter Short Course Earthscope Meeting May 12, 2009.
MWA Operations Management Plan (OMP, v. 3) Ron Remillard (MIT); MWA Project Meeting, June 6, 2011.
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
Seasonal Terrestrial Water Storage Change and Global Mean Sea Level Variation Jianli Chen 1 and Clark Wilson 1,2 Center for Space Research, The University.
September Interface Kickoff Sunflower Project Statewide Management and Reporting Tool Update September 02, 2009.
Developing Business/IT Solutions Chapter 12 McGraw-Hill/IrwinCopyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Response to ASAC Report of May 2004 Response to ASAC The Atacama Large Millimeter Array Tom Wilson and Al Wootten Science IPT.
The International GNSS Service (IGS), June 2008: Perspectives and Key Issues John M. Dow Chair, IGS Governing Board.
FASR Software Considerations Gordon Hurford SSL AUI – August 2007.
A. Güntner | Hydrogravimetry 1 Sub-humid climate (Mediterranean) Mean annual precipitation: 1200 mm, (highly seasonal) Elevation: 160 m amsl Early results.
1 Updating the ESnet Site Coordinator Model (Presented to SLCCC, June, 2004) Joe Burrescia Mike Collins William E. Johnston DRAFT FOR COMMENT 7/19/04.
06-1L ASTRO-E2 ASTRO-E2 User Group - 14 February, 2005 Astro-E2 Archive Lorella Angelini/HEASARC.
ASDC Ingest Automation Efforts through Collaboratory for quAlity Metadata Preservation (CAMP) Presented by: Aubrey Beach (Booz Allen Hamilton, NASA ASDC)
Exporting WaterML from the Earth System Modeling Framework Xinqi Wang Louisiana State University NCAR SIParCS Program August 4, 2009.
Issues in the Comparison of Ground Gravity with GRACE Data David Crossley, Saint Louis U., Dept. Earth & Atmospheric Science, 3507 Laclede Ave., St. Louis.
Learning how to Learn Technical Team ICT and the Management of BIG Educational Research Projects Patrick Carmichael and.
Methods and Techniques for Integration of Small Datasets September 13-14, 2005 St. Louis, Missouri Sponsored by the U.S. Department of Housing and Urban.
SAON Data Policy, activities, services, and deliveries Jan René Larsen SAON Board Meeting, 29 April 2013, Vancouver, Canada,
WE WA VI ST PE MO MB MC CO BH MC MB MO PE ST VI WA Comparison of GRACE gravity field solutions, hydrological models and time series of superconducting.
XML-SEED format and its application to synthetic seismogram database Seiji Tsuboi IFREE/JAMSTEC.
GSN QC at the IRIS DMC Mary Templeton GSN Coordination Meeting Seattle, WA November 16, 2011.
Measuring Sea Level Change. Overview What is Sea Level? Mean – Arithmetic average Mean sea level – The average sea level over a large region Mean high.
ENEON first workshop Observing Europe: Networking the Earth Observation Networks in Europe September, Paris [Name of your network/organization] [Name.
Understanding SEED Headers. SEED is an international standard for the exchange of digital seismological data SEED was designed for use by the earthquake.
1 SUZAKU HUG 12-13April, 2006 Suzaku archive Lorella Angelini/HEASARC.
Americas comments on Linear Collider organization after 2012 P. Grannis, for LCSGA – Aug. 24, 2011 ILCSC GDE.
Joint Interface Committee Joint Recommendation for Version 0 Business Practices August 16 th 2004.
Agenda FDSN WG2+3 SEED issues –Order of FIR filter coeff (bl 54) –QC flag indicating M for merged data –Est. delay and corr. Applied fields bl 57 –Minor.
TDWG Infrastructure Project (TIP) Documentation Roger Hyam TDWG Executive Meeting June 1-2, Madrid, Spain.
5-7 May 2003 SCD Exec_Retr 1 Research Data, May Archive Content New Archive Developments Archive Access and Provision.
Geodetic Implications of Mass Transfer in the Deep Earth David Crossley St. Louis University Acknowledgements: GGP, NASA.
Thurs Nov 12, 12:45 Nov 8-17, 2009Data Management Workshop Cairo, Egypt.
June 12, 2004Synthetic Seismogram Exchange Standards But We Have A Standard. Can SEED Support Synthetics? Linus Kamb IRIS DMC.
Preparation for World Telecommunication Standardization Assembly 2016
Data Flows in ACTRIS: Considerations for Planning the Future
Project progress report WP2
Task Group 4 Low Rate WPANS
Navigating the Capital Improvements Program
Progress Report TF Sequence Listing in XML
NERC Reliability Standards Development Plan
NERC Reliability Standards Development Plan
Calibration Method.
Presentation transcript:

The new IGFS Service: “GGP-ICET Service” From the Earth Tides Symposium in Warsaw

GGP-ICET Service GGP Database: GFZ/Potsdam (and ICET, EarthCube?...) Mandate: (1)archive, manage, and distribute SG 1 min and 1 sec data (2)make appropriate corrections to 1 min data to arrive at a reliable long-term 1-hr residual gravity series for each GGP station ICET Database: Tahiti Mandate: (1)archive gravity, tilt, strain data (2) produce 1 min corrected SG files (3) produce gravimetric tidal factors for GGP stations Board of Directors Terms of Reference Comment: GGP and ICET will merge into one service with one BoD, and one ToR, but maintain different mandates. ICET will continue its traditional role and send 2 products to GGP. GGP will expand its service to provide a 1-hr corrected series for each GGP station.

GGP-ICET Interim Teams 1. Management Team: Crossley, Hinderer, Pagiatakis – formulate Terms of Reference, Coordinate planning efforts with Harald Schuh 2. ICET Team: Barriot, Ducarme, … - revisit the 1 min corrected data (units of volt, correcting function,) and add gravimetric factors 3. Loading Team: Boy, Wzionteck, … - formulate standard correction for tides (solid + OTL), global atmosphere + mass attraction, global hydrology, polar motion, 4. Database Team: Forste, Ritschel, Barriot, Wziontek, EarthCube …. – Fix minor problems with existing database, formulate modern interface for the Service, following Ritschel’s ETS2013 talk + XML? SG Trend Team: Wziontek, Wilmes, Meurers, … - use AG data to remove best linear (?) trend from SG data, manage offsets and calibration factors 6. Raw Data Team: Palinkas, Rosat, Forbriger, M.V. Camp … - organize collection of 1 sec data from stations, conversion to IRIS miniseed format and system transfer function, provision of noise spectra (method of VP) … Comment: Teams to be established by June 1 and to work over summer to complete tasks.

Proposal to IAG/IGFS The 6 teams will coordinate efforts during August to arrive at a recommended standard processing procedure. This procedure will be applied to a number of stations (e.g. Strasbourg, Wettzell, BFO ….) to produce a long-term 1 hr series. The procedures and results will be circulated to all Station Managers for comments The package to be presented to the IAG in September by a GGP rep (J.P. Boy, H. Wilmes …)