Www.seattle.gov/light/conserveConservation Resources Marketing SERVICE CENTERS FACILITIES MASTER PLANNING INITIATIVE Bernie O’Donnell, Director Utility.

Slides:



Advertisements
Similar presentations
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
Advertisements

FPSC Ten Year Plan Workshop Nuclear Panel Steven Scroggs Senior Director, Project Development Florida Power & Light Company August 15, 2007.
March 2012 Ports and Cities Conference Newcastle Dorte Ekelund, Executive Director Major Cities Unit Department of Infrastructure and Transport
The Department of Energy Enterprise Risk Management Model
IBM Corporate Environmental Affairs and Product Safety
Operating Plans and Rates
New Paradigms for Measuring Savings
Capacity Planning For Products and Services
Critical Condition Triaging School Enrollment Growth School Board Work Study November 13, 2013.
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Welcome March 2012 Purpose of meeting with you 1. Determine if the Fire Hall at Grosvenor St. should be declared surplus. 2. To obtain feedback and direction.
Comparative Analysis Two Potential Sites for a New High School.
JUNE FLOODS AND STORMS Preliminary Damage Assessment Brief
May 22, 2012 Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan ASFPM 2012 Annual Conference Timothy J. Trautman, P.E., CFM Flood Mitigation.
© 2001 Joint Venture : Silicon Valley Network. “Silicon Valley is at an important evolutionary stage... Our region needs to decide what kind of place.
1 Transuranic Waste Processing Center Karen Deacon, Deputy Federal Project Director Oak Ridge Office of Environmental Management.
A Brief Overview of Emergency Management Office of Emergency Management April 2006 Prepared By: The Spartanburg County Office of Emergency Management.
HB1438 Update & Statewide Capital Planning Initiative Office of State Finance Department of Central Services November 8, 2011.
Smart Growth Planning Tab. “We express our values by what we build…” What we build on and near campus should exemplify our strong appreciation for supporting.
Kirkland 2035 Plan Update Summary of EIS Alternatives Transportation Commission – September 25, 2014.
1 Conservation: An Alternative Energy Source for Local Communities Ted Coates, Power Manager September 20, 2008.
Responding to the Electricity Challenges: Five Point Plan Overview 19 December 2014 Confidential 1.
Fort Bliss Energy, Water, and Solid Waste Sustainability Initiatives Draft Environmental Impact Statement (EIS) Public Meetings June & 13, 2013.
QEW Central Corridor ‘Securing our Prosperity” Council Workshop.
What is a master plan? Creates the long-term vision for the University’s land and physical resources. Lays foundation for development plan, but is not.
Session 141 Vulnerability to a natural hazard can be defined as to the extent to which people will experience harm and property will be damaged from that.
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
Foster and sustain the environmental and economic well being of the coast by linking people, information, and technology. Center Mission Coastal Hazards.
Seattle Station Area Planning Milestones & Events Transit-Oriented Development Program Information & Schedule Station Area Atlas Station Area Recommendations.
 Preparing Your Community for Defense Cuts and BRAC A Presentation to the Association of Defense Communities.
Implementing HAZUS-MH in Pre-Disaster Mitigation
Long Range Infrastructure Planning The Gilbert, Arizona Experience Kenneth C. Morgan, PE Public Works Director.
Comprehensive Economic Development Strategy March 22, 2012.
Rate and Revenue Considerations When Starting an Energy Efficiency Program APPA’s National Conference June 13 th, 2009 Salt Lake City, Utah Mark Beauchamp,
Highlights of Commission Activities Little Rock ASHRAE Monthly Meeting October 12, 2011 Presented By: John P. Bethel.
Presentation to Energy & Technology/Planning & Development Committees Considerations on Establishing Municipal Utilities Joint Informational Forum Legislative.
Availability of suitable space for expansion Lack of flexibility in allowed uses.
04_0001 Elias Semaan Iraq Infrastructure Reconstruction Project Update.
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
Energy Assurance Planning: Integrating Resiliency and Sustainability Larisa Dobriansky, Global Energy Network COG EAC 1/17/13
Resource Conservation Program November 2003 Kelley Gonzales Resource Conservation Manager.
Network Customer Meeting Access Metric Update November 16, 2006.
SALEM PUBLIC SCHOOLS STUDENT TRANSPORTATION - UPDATE July 27,
Asset Management in Action: Use of a Triple Bottom Line Approach to Prioritize Capital Improvement Needs Richard Cuthbert R. W. Beck, Inc.
“Integrating Property Management with Emergency Recovery” Ivonne Bachar, CPPM CF Director, Property Management Office Stanford University
Slide 1 Fort Detrick Sustainability Planning Workshop #1 – Out Brief 1 Jul 08.
Prioritizing Booster Pump Station Improvements Tom Peters, P.E. May 2, 2008.
ALACHUA COUNTY COMMISSION QUARTERLY RETREAT ENERGY RECOMMENDATIONS FOR IMMEDIATE INVESTIGATION AND IMPLEMENTATION BY THE ALACHUA COUNTY BOARD OF COUNTY.
MAGNITUDE 6.3 EARTHQUAKE STRIKES TAIWAN (7:02 pm, October 31, 2013) Walter Hays, Global Alliance for Disaster Reduction, Vienna, Virginia, USA.
1 Strategic Plan | May Decisions on rates, budgets, investments, programs and services for six years ( ) The Strategic Plan.
1 Case Study: Pacific Gas & Electric Company San Francisco Lifelines Council Edwards Salas Senior Vice President, Engineering and Operations, PG&E February,
Bob Cupit Manager, Energy Facility Permitting Minnesota Public Utilities Commission.
Aquatic Facility Concept Design. “Every Dog has its Day” Park Valley Pool Pool is 28 years old and nearing the 4-9 years of identified life expectancy.
S T A T E O F C A L I F O R N I A. Expediting the Application Review Process Building Schools — Putting Californians to Work.
3 rd International Workshop on Global Flood Monitoring & Modelling Assessing Global Flood Hazards: Engineering and Insurance Applications March 6, 2013.
Prepared by: Alex Fisch Planning Services Division.
Transportation Possible Goal Provide convenient alternative transportation options to dramatically reduce our City’s fuel consumption. Example Actions.
Public Hearing – FY 2017 – 2021 Recommended Capital Improvement Program Budget April 25, 2016.
JUNE 2016 Downtown Bozeman, MT Comprehensive Downtown Parking Plan.
Blue Ocean Planning Final Report March, 2017.
Facilities Plan – Discussion Issues
Rob Conley City of Hamilton
Gateway Specific Plan Concepts
Using TIF to Support Primary Employers
Overview of City Wide Core Service on Assets/Facilities
Civic Center Sports Field Study Session & Quarterly Update
Project Goals Leverage one of our unique CSU Dominguez Hills assets—our underutilized land—to advance the university mission and increase student success.
Pacific Power Seismic Preparedness Update
Parks and Recreation Services
Long-Term Power Outage
Presentation transcript:

Resources Marketing SERVICE CENTERS FACILITIES MASTER PLANNING INITIATIVE Bernie O’Donnell, Director Utility Support Services Division

Conserving Energy for a Sustainable Future SEATTLE CITY LIGHT FACILITIES OVERVIEW City Light manages over 127 major facilities totaling approximately 1.3M BSF within its service area and power production remote sites including: 14 Major Substation Sites 2 Company Towns 8 Hydroelectric Generating Powerhouses Office leasing space th Avenue Building SMT Building 2 Service Centers North Service Center South Service Center Utility Support Services Division 1

Conserving Energy for a Sustainable Future 2 Utility Support Services Division The service centers form the backbone of City Light’s operations directly impacting the mission to provide reliable, low-cost power to customers. Mission essential functions are located in the service centers including line trucks and dispatching, materials and equipment, shipping and receiving, staging of supplies, shops operations and fabrication to support power generation, transmission and distribution work. Built in the 1950s and 1920s respectively, City Light’s North and South Service Centers have exceeded their intended operational lifespans Building systems are aging and increasingly unreliable Service yard areas are constrained and highly congested Little opportunity to accommodate growth or reconfiguring to meet changing needs Additionally, the South Service Center sits in an area of Seattle that has a high susceptibility to soil liquefaction during an earthquake which has significant impacts to continuity of operations following an earthquake SERVICE CENTER CHALLENGES – NEED FOR MASTER PLANS

Conserving Energy for a Sustainable Future 3 Utility Support Services Division 1.A master planning effort is underway to address long term operational efficiencies of City Light’s North and South Service Centers Both North and South Service Centers form the backbone of City Light’s operations. Built in the 1920’s and 1950’s, the North and South Service Centers have exceeded their intended operational lifespan. Neither location operates effectively for optimal efficiencies. 2.An alternative risk mitigation effort is underway to address structural improvements to the South Service Center Ensure continuity of operations following a major seismic event. SCL Owned North Service Center Residential Neighborhood Park Retail Commercial NORTH SERVICE CENTER VICINITY MAP

Conserving Energy for a Sustainable Future 4 Utility Support Services Division SOUTH SERVICE CENTER VICINITY MAP

Conserving Energy for a Sustainable Future MISSION/GOALS OF SERVICE CENTER MASTER PLANNING 5 The planning process will result in the identification of a preferred long term master plan that meets the following mission/goals: Evaluation Criteria    Reliable Essential functions out of liquefaction zone Responsive More distribution of functions across service area Efficient Streamlined organization & staffing Neighborhood Reduced impact to residential zones Cost Land / design / entitlement / construction Utility Support Services Division

Conserving Energy for a Sustainable Future SOUTH SERVICE CENTER INTERIM RISK MITIGATION 6 The South Service Center is located in an area that has a high susceptibility to liquefaction in the event of a high magnitude earthquake. South Service Center Seismic Hazard Map Source: USGS Utility Support Services Division

Conserving Energy for a Sustainable Future SEISMIC RISKS AND MITIGATION COSTS AT SO. SERVICE CENTER 7 SSC Asset Existing Market Value Full Replacement Cost Damage Replacement (50%) Facilities/Site$28.6M$220.0M$170.0M Mobile Equipment$50.5M$ 55.6M$ 27.8M Materials Stock$40.0M$ 46.0M$ 23.0M Totals: $119.1M$321.6M$220.8M Utility Support Services Division A 6.5 magnitude earthquake or greater in Seattle has a 10-15% likelihood of occurring in the next 50 years. This is assumed to result in a total loss for SSC operations. Estimated to be 4 years before full operations are re-established. 1-3 months estimated duration to resume any operations at the SSC. Significant inventory of transformers, cable reels, fleet line trucks, aerial lift trucks, shops machinery, and other equipment would be damaged beyond immediate use.

Conserving Energy for a Sustainable Future SERVICE CENTER PLANNING OPTIONS UNDER CONSIDERATION A.Seismic Upgrade only to the South Service Center building structures and critical portions of the service yard to maximize continuity of operations following a major seismic event. Estimated Cost: $90M B.Replace South Service Center – moves all existing functions at SSC to a new service center outside the seismic liquefaction zone and some functions from the NSC to a new service center. The South Service Center would be repurposed, or sold. Estimated Cost: $350M C.Single Large Service Center – relocates all functions from the existing NSC and SSC to a new single, large service center in a central location to City Light’s service area. Estimated Cost: $450M 8 Utility Support Services Division

Conserving Energy for a Sustainable Future NEXT STEPS 1.Provide funding to address Specific Seismic Liquefaction concerns at SSC. Capital costs of $90M are included in the initiative beginning in 2019 ($41.3M) and 2020 ($48.7M), and work would be sequenced to minimize disruption to service center operations. Essential seismic upgrades would occur to South Service Center structures, building systems and five acres of service yard, including egress routes. 2.Continue to develop design options that best respond to the goals and evaluation criteria for review and consideration. If a master planning development decision includes vacating the South Service Center, the funding request for 2019 and 2020 for seismic upgrades would be withdrawn and the funding could be put towards development project implementation. 9 Utility Support Services Division

Conserving Energy for a Sustainable Future 10 Utility Support Services Division QUESTIONS?