Isabella Pagano Milano, 14 Dec 20101PLATO TOUs An update on PLATO TOUs PLATO System & TOU Teams meeting Milano, 14-15 Dec.

Slides:



Advertisements
Similar presentations
ICT research priorities and recommendations for strategy development in the WBC Ulrike Kunze / PT-DLR, Germany Consultation session on recommendations.
Advertisements

Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to CoU V1a, 20 Jan 2012 Doc: Source: ETSI Agenda.
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
Making the System Operational
Welcome & Introduction
Isabella Pagano PLATO TOUs PM Padova, 1 Feb 20101System &TOUs Team Meeting Organization of the TOU team PLATO System & TOUs.
Giampaolo Piotto Dipartimento di Astronomia - Università di Padova PLAnetary Transits & Oscillations of stars Search for and.
Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Isabella Pagano & Roberto Ragazzoni -
Catania 28 Feb – 01 Mar 2011 V.Viotto (INAF - Osservatorio Astronomico di Padova) TOU Breadboard Status and Test.
Fuels and Powertrain EE-VERT Energy efficient vehicles for road transport Motivation and Objectives Project Plan, Milestones and Deliverables Technical.
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
ATHENA WFI Meeting Garching, January 28, 2014 Markus Plattner.
Telescope Optical Units (TOUs)
PLATO PLATO TOU KO MEETING ‎ H. Rauer (DLR PF) H. Kinter/A. Salado (Kayser-Threde)
Plato at ASI Tues 05/May/09Dave Walton Plato meeting Rome Tues 5/May/09 Focal Plane Dave Walton UCL/MSSL, + Leicester University Miguel Mas INTA/CAB +
NASA’s Goddard Space Flight Center LRO SRR Project Management.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
Daniele Piazza PLATO TOU Meeting, Catania, PLATO - TOU Mechanical Design & Future Activities Osservatorio Astronomico – Catania June 11 th,
NGAO Management Update Peter Wizinowich NGAO Meeting #11 November 5, 2007.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
SDW2005, juin, Taormina The Corot Space instrument.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
PLATO Telescope Optical Units Meeting in Bern March 12 th 2010.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
PLATO : TOU PROGRESS MEETING 14-15/12/2010 S. Mellé (CNES, PLATO Instrument PA Manager) Outline 1- PLATO and TOU PA organization 2- CNES PA organization.
PLAnetary Transits and Oscillations of stars PLATO Consortium kick-off meeting.
Chapter 2: Overview of Essentials ISE 443 / ETM 543 Fall 2013.
Andrea Santangelo, Kepler Center-Tü Toulouse, February 2, 2012 “The Organization of the EUSO- Balloon mission” Andrea Santangelo * Kepler Center for Astro.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
Data processing group. General study of data processing architecture: - overall definition of the data processing functions - share of tasks between on-board.
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
VST: dome THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS Ing. Davide Fierro THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS.
EddiCam: The Eddington Photometric Camera EddiCam Definition Phase Kick-Off Meeting J. Miguel Mas-Hesse Vienna, 17th Sept., 2001.
COROTWEEK n°8 Toulouse May the 24th, 2005 Program Status (Th. Lam-Trong) 1 COROT.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
PLATO Main Electronics Units (MEU) based on inputs from P. Plasson and the system team J. Miguel Mas-Hesse Centro de Astrobiología (CSIC-INTA)
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
Telescope Integration and Tests Tuesday Afternoon.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
PDS Geosciences Node Page 1 Archiving Mars Mission Data Sets with the Planetary Data System Report to MEPAG Edward A. Guinness Dept. of Earth and Planetary.
Plato meeting MSSL Wed+Thur 15+16/Oct/08 UK interests/activities Alan Smith and Dave Walton UCL/MSSL.
PLATO Data Center: Purpose and Structure Laurent Gizon (PDPM) Hamed Moradi (PDC Project Office)
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
DPE CSSW Process Model Annex A WP-400 ECSS Case Study.
GE+ PL INTERFACES, RESSOURCES PLATO PPLC/ESA meeting, Feb 27th 2009.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
Constellation Space Transportation Planning Office July 30, 2009.
Réunion de présentation des besoins 10 Nov Joël MICHAUD French expertise in SiC for large telescopes.
Roberto Ragazzoni INAF – Astronomical Observatory of Padova PLATO: the TOUs (Telescope Optical Units) Kick Off Meeting KOM-Paris,
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
September 30th, 2008 Patrick Levacher. Plato Instrument System Group.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
The Field Camera Unit Results from technical meeting S. Scuderi INAF – Catania.
IFU Management Meeting LAM – 15/10/04. Introduction (olf)
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Project Execution Methodology
Athena Italian and CNES/IRAP Meeting
WP9 (NA8) PARALLEL MEETING AOB: (Apr 4th 2017)
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
SPF MAG Quarterly Report – Feb 2015
PLATO Mission: TOU Phase B/C1 preliminary KO meeting:Technical Issues
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
The European Contribution to eXTP
CS/EE/ME 75(a) Nov. 19, 2018 Today: Prelimnary Design Review Homework.
PSS verification and validation
Change Management E2E Roadmap
Presentation transcript:

Isabella Pagano Milano, 14 Dec 20101PLATO TOUs An update on PLATO TOUs PLATO System & TOU Teams meeting Milano, Dec 2010

Milano, 14 Dec 2010PLATO TOUs2

Main Milestones (from SMP)  Start of Definition Phase with two parallel industrial contracts: Jul 2010  Down-selection for CV M1/M2 missions: Jun 2011  Completion of the Definition Phase (A/B1): Dec 2011  Final adoption for the Implementation Phase (B2/C/D/E1): Feb 2012  Start of the Implementation Phase: Jul 2012  Launch (L): 2018 Milano, 14 Dec 2010PLATO TOUs3 Oct 2011

More details  Oct 29, 2010 PMC Proposals Due  Nov 2010 – Feb, 2011 Proposal evaluation: ESA panels  AWG  SSAC  SPC decision (10-11 Feb 2011)  May 2011 Formal release of updated AO documents for implementation phase  Jun 2011 Completion of industrial studies (Phase A)  Jun 2011 M-class mission selection by SPC  Jul 2011 ?? Final proposal for implementation phase  Jul-Nov 2011 ?? Final proposal evaluation; : ESA panels  AWG  SSAC  SPC decision (16-17 Nov 2011)  Dec 2011 Completion of industrial studies (Phase B1) Milano, 14 Dec 2010PLATO TOUs Nov 2011 ?? Feb 2012 ??

Definition phase: a new start for the Consortium Milano, 14 Dec 2010PLATO TOUs5

PLATO MISSION MANAGEMENT PLATO MISSION CONSORTIUM PMC LEAD PMC LEAD PMC BOARD PMC BOARD PAYLOAD DATA CENTER DATA CENTER SCIENCE PREPARATION MANAGEMENT SCIENCE PREPARATION MANAGEMENT PROJECT MANAGER PROJECT MANAGER PROJECT SCIENTIST PROJECT SCIENTIST SCIENCE TEAM 6 PMC MEMBERS 2 LEGACY SCIENTISTS 6 PMC MEMBERS 2 LEGACY SCIENTISTS SOC MANAGEMENT TEAM MOC

ESA project team End-to-end Simulator W. Zima PLATO Payload Management PIPM: P. Bodin PDC PDPM: L. Gizon Instrument System Coordinator P. Levacher Science Coordination H. Rauer Target/field Characterization G. Piotto FU Coordination S. Udry Stellar Science M.J. Goupil Exoplanet science D. Pollacco TOU R. Ragazzoni Fast DPU G. Peter Normal DPU Ph. Plasson PLATO Mission Consortium Science Preparation Management Algorithms R. Samadi Mission management AEU S. Fredon ICU R. Cosentino Prototype & FM AIV P. Levacher main / ancillary database system architecture R. Burston exoplanet analysis System N. Walton data processing implementation I. Pardowitz stellar analysis system T. Appourchaux Input Catalogue P. Giommi Data Centre Normal TOU R. Ragazzoni Fast TOU W. Benz Project Manager Project ScientistScience Team - 6 PMC members - 2 Legacy Scientists PMC Board ancillary database content management M. Deleuil data analysis support tools L. Gizon FPA/FEE D. Walton/M. Mas Hardware & boot software M. Mas Application software Ph. Plasson PMC Lead C. Catala Camera Management D. Laubier DPS Management B. Pontet Payload SOC data processing algorithms R. Samadi Additional Science W. Weiss

End-to-end Simulator W. Zima PLATO Payload Management PIPM: P. Bodin PDC PDPM: L. Gizon Instrument System Coordinator P. Levacher Science Coordination H. Rauer Target/field Characterization G. Piotto FU Coordination S. Udry Stellar Science M.J. Goupil Exoplanet science D. Pollacco TOU R. Ragazzoni Fast DPU G. Peter Normal DPU Ph. Plasson Science Preparation Management Algorithms R. Samadi AEU S. Fredon ICU R. Cosentino Prototype & FM AIV P. Levacher main / ancillary database system architecture R. Burston exoplanet analysis System N. Walton data processing implementation I. Pardowitz stellar analysis system T. Appourchaux Input Catalogue P. Giommi Data Centre Normal TOU R. Ragazzoni Fast TOU W. Benz ancillary database content management M. Deleuil data analysis support tools L. Gizon FPA/FEE D. Walton/M. Mas Hardware & boot software M. Mas Application software Ph. Plasson Camera Management D. Laubier DPS Management B. Pontet Payload data processing algorithms R. Samadi Additional Science W. Weiss

PLATO Payload Management PIPM: P. Bodin Instrument System Coordinator P. Levacher TOU R. Ragazzoni Fast DPU G. Peter Normal DPU Ph. Plasson Algorithms R. Samadi AEU S. Fredon ICU R. Cosentino Prototype & FM AIV P. Levacher Normal TOU R. Ragazzoni Fast TOU W. Benz FPA/FEE D. Walton/M. Mas Hardware & boot software M. Mas Application software Ph. Plasson Camera Management D. Laubier DPS Management B. Pontet Payload

PLATO Mission Consortium: Cameras LESIA + MSSL MEU + FEE DLR + MSSL F-DPU + F-FEE Prototype AIV P. Levacher Industrial contract Cameras AIT Structure Telescope Optical Unit R. Ragazzoni FPA N+F Structure & AIV M Mas CCD + FEE D. Walton CAMERAS D. Laubier AEU S. Fredon TOU + FPA Tests FM Camera Compl. Tests Detectors F-CCD + F FEE CEA F-FEE N CCD+N FEE F-CCD+F-FEE Tests & calibration N-CCD+N-FEE Tests & calibration System CCD + FEE Thermal support PLATO Instrument Manager P. Bodin RAIV R. Pérez PA/QP S. Mellé CNES + MSSL FPA + AEU MSSL/INTA FPA + FEE CAMERA/System team ManagerP. Levacher (LAM) Optical arch P. Bernardi (LESIA) Detection archT. Buey (LESIA) Mechanical arch P. Vola (LAM) Thermal archH. Pasquier (CNES) Electrical arch. S. Fredon (CNES) TOU Optical tests Coupling tests AIV R. Perez FM AIV R. Perez Structure AIV N-TOU R. Ragazzoni Management Optics straylight F-TOU W. Benz OMT Thermal AIV GSE AIV GSE Filters OGSE Alternative F-FPA LAMLESIADLR INAFINTA MSSL Bern Univ. GEPI

Definition phase TOU WBS Milano, 14 Dec PLATO TOUs TOU RRa Engineering RRa Optical Design DMa Mechanical Design DPi Thermal Design SBa Interfaces IPa Requirement & Budget SSc Optical Material & Coating MGh F-TOU Filters ABr Straylight An. & Baffle MMu AIV JFa GSE EPa Breadbording RRa Structure DPi Baffle Ssc Thermal Parts SBa Lenses RRa AIT JFa GSE VVi TOU PM IPa TOU PA GdP

Definition Phase Plan  Validate technical critical points ▪ Confirm no need for new development ▪ Demonstrate TRL > 5 at the end of the definition phase ▪ Confirm no critical aspects in the procurement and AIV schedule of the implementation phase  Allow fast transition to implementation phase Milano, 14 Dec 2010PLATO TOUs12

TOUs Specific Activities  Study of spherical and aspherical lenses manufacturability  Validation of TOU AIV procedures at industrial level  CaF2 lens: handling, protection  Coatings (thermal, filter, AR): performance and low temperature  Alignment at ambient temperature  Assessment of performances in operational temperature environment  Link between performances in operational and ambient environment  Thermal refocusing efficiency Milano, 14 Dec 2010PLATO TOUs13

PLATO Payload Schedule (DP) Milano, 14 Dec 2010PLATO TOUs14

Where we are  Contract to manufacture 6 spherical lenses: assigned  Procurement of GSE for breadboard AIT: ongoing  Contract for study of industrial production of (34x5) spherical and (34) aspherical lenses: ready to start  Contract for study of industrial AIV procedures: ready to start  Contract for support to perform alignment test (on – axis): ready start Milano, 14 Dec 2010PLATO TOUs15

Updated reference documents 16 TWIKI

Terminology / jargon  PIRR (Preliminary Instrument Requirement Review)  May 2010  Breadboard (ready for tests to be done in time for the PIRR)  6 spherical lenses + dummy structure having the same thermal behavior as the final structure, using the same holders for the lenses as the final structure and having its end (at the I/F with the FP) equivalent in terms of opto-mechanical interfaces to the final structure  Prototype (after the PIRR)  1 aspherical + 5 spherical lenses + modified dummy structure Milano, 14 Dec 2010PLATO TOUs17

Agenda - 14 Dec 2010  OD: open issues (e.g., stop/L3) (D. Magrin, R. Ragazzoni)  TOU breadboard (Introduction by J. Farinato  Discussion)  The way lens will be integrated in barrels for the breadboard  The detailed schedule for the breadboard  CaF2 Verification tests  Tolerance of the OD to thermal variation (to agree a work plan)  TOU prototype (after PIRR) Milano, 14 Dec 2010PLATO TOUs18

PRM#1PRM#2PRRSRR WP Nov 2010Jan 2011Apr 2011Oct PM TOU implem. plan PM TOU cost docum PM TOUs Manag Plan PM PA Plan PA CADM Plan PA Preliminary Lists (Materials, Parts, Processes, Critical Items) PA RFDs PA Technical Report SE Milano, 14 Dec 2010PLATO TOUs19

Milano, 14 Dec PLATO TOUs