EGEE-II INFSO-RI-031688 Enabling Grids for E-sciencE www.eu-egee.org www.glite.org EGEE Middleware Claudio Grandi (INFN – Bologna) Workshop Commissione.

Slides:



Advertisements
Similar presentations
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks MyProxy and EGEE Ludek Matyska and Daniel.
Advertisements

INFSO-RI Enabling Grids for E-sciencE EGEE and gLite Slides by: Erwin Laure EGEE Deputy Middleware Manager.
Middleware Roadmap for GridPP3 R.Middleton GridPP16- QMUL.
GLite Status Stephen Burke RAL GridPP 13 - Durham.
INFSO-RI Enabling Grids for E-sciencE Workload Management System and Job Description Language.
Grid Computing - DCC/FCUP
EGEE-II INFSO-RI Enabling Grids for E-sciencE The gLite middleware distribution OSG Consortium Meeting Seattle,
FP7-INFRA Enabling Grids for E-sciencE EGEE Induction Grid training for users, Institute of Physics Belgrade, Serbia Sep. 19, 2008.
Plateforme de Calcul pour les Sciences du Vivant SRB & gLite V. Breton.
The EPIKH Project (Exchange Programme to advance e-Infrastructure Know-How) gLite Grid Services Abderrahman El Kharrim
EGEE-II INFSO-RI Enabling Grids for E-sciencE Slides based on material from Sergio Andreozzi INFN-CNAF and from Pedro.
EGEE-II INFSO-RI Enabling Grids for E-sciencE Based on material by Sergio Andreozzi INFN-CNAF OMII-Europe All-Hands.
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Giuseppe Andronico INFN Sezione di Catania.
IST E-infrastructure shared between Europe and Latin America Overview of gLite Middleware Pedro Henrique Rausch Bello Instituto.
Makrand Siddhabhatti Tata Institute of Fundamental Research Mumbai 17 Aug
INFSO-RI Enabling Grids for E-sciencE Comparison of LCG-2 and gLite Author E.Slabospitskaya Location IHEP.
INFSO-RI Enabling Grids for E-sciencE gLite Data Management Services - Overview Mike Mineter National e-Science Centre, Edinburgh.
FESR Consorzio COMETA Grid Introduction and gLite Overview Corso di formazione sul Calcolo Parallelo ad Alte Prestazioni (edizione.
INFSO-RI Enabling Grids for E-sciencE Logging and Bookkeeping and Job Provenance Services Ludek Matyska (CESNET) on behalf of the.
INFSO-RI Enabling Grids for E-sciencE Status and Plans of gLite Middleware Erwin Laure 4 th ARDA Workshop 7-8 March 2005.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Security and Job Management.
INFSO-RI Enabling Grids for E-sciencE The gLite Workload Management System Elisabetta Molinari (INFN-Milan) on behalf of the JRA1.
June 24-25, 2008 Regional Grid Training, University of Belgrade, Serbia Introduction to gLite gLite Basic Services Antun Balaž SCL, Institute of Physics.
EGEE-II INFSO-RI Enabling Grids for E-sciencE JRA1 in EGEE II Claudio Grandi (INFN and CERN) EGEE II Transition Meeting.
INFSO-RI Enabling Grids for E-sciencE gLite Data Management and Interoperability Peter Kunszt (JRA1 DM Cluster) 2 nd EGEE Conference,
1 User Analysis Workgroup Discussion  Understand and document analysis models  Best in a way that allows to compare them easily.
US LHC OSG Technology Roadmap May 4-5th, 2005 Welcome. Thank you to Deirdre for the arrangements.
1 Andrea Sciabà CERN Critical Services and Monitoring - CMS Andrea Sciabà WLCG Service Reliability Workshop 26 – 30 November, 2007.
INFSO-RI Enabling Grids for E-sciencE EGEE is a project funded by the European Union under contract INFSO-RI Grid Accounting.
INFSO-RI Enabling Grids for E-sciencE EGEE Middleware reengineering Claudio Grandi – JRA1 Activity Manager - INFN EGEE Final EU.
Glite. Architecture Applications have access both to Higher-level Grid Services and to Foundation Grid Middleware Higher-Level Grid Services are supposed.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE Site Architecture Resource Center Deployment Considerations MIMOS EGEE Tutorial.
Enabling Grids for E-sciencE gLite for ATLAS Production Simone Campana, CERN/INFN ATLAS production meeting May 2, 2005.
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Alexandre Duarte CERN IT-GD-OPS UFCG LSD 1st EELA Grid School.
SAM Sensors & Tests Judit Novak CERN IT/GD SAM Review I. 21. May 2007, CERN.
INFSO-RI Enabling Grids for E-sciencE gLite Middleware Status Frédéric Hemmer, JRA1 Manager, CERN On behalf of JRA1.
David Adams ATLAS ATLAS-ARDA strategy and priorities David Adams BNL October 21, 2004 ARDA Workshop.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE Middleware reengineering Claudio Grandi (INFN – Bologna) EGEE Final.
INFSO-RI Enabling Grids for E-sciencE Policy management and fair share in gLite Andrea Guarise HPDC 2006 Paris June 19th, 2006.
The GridPP DIRAC project DIRAC for non-LHC communities.
EGEE-II INFSO-RI Enabling Grids for E-sciencE middleware status and plans Claudio Grandi (INFN and CERN) John White.
13th EELA Tutorial, La Antigua, 18-19, October E-infrastructure shared between Europe and Latin America FP6−2004−Infrastructures−6-SSA
SAM Status Update Piotr Nyczyk LCG Management Board CERN, 5 June 2007.
Status of gLite-3.0 deployment and uptake Ian Bird CERN IT LCG-LHCC Referees Meeting 29 th January 2007.
EGEE-II INFSO-RI Enabling Grids for E-sciencE Overview of gLite, the EGEE middleware Mike Mineter Training Outreach Education National.
First South Africa Grid Training June 2008, Catania (Italy) OVERVIEW of the gLite COMPONENTS Marcello Iacono Manno FIRST.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI Services for Distributed e-Infrastructure Access Tiziana Ferrari on behalf.
INFSO-RI Enabling Grids for E-sciencE EGEE Middleware Claudio Grandi (INFN – Bologna) EGEE-NAREGI meeting March 20-22,
The EPIKH Project (Exchange Programme to advance e-Infrastructure Know-How) gLite Grid Introduction Salma Saber Electronic.
Enabling Grids for E-sciencE Claudio Cherubino INFN DGAS (Distributed Grid Accounting System)
The EPIKH Project (Exchange Programme to advance e-Infrastructure Know-How) Overveiw of the gLite middleware Yaodong Cheng
EGEE Data Management Services
Grid Computing: Running your Jobs around the World
gLite: status and perspectives
Claudio Grandi – JRA1 Activity Manager INFN and CERN
StoRM: a SRM solution for disk based storage systems
Status of the SRM 2.2 MoU extension
gLite Grid Services Salma Saber
GDB 8th March 2006 Flavia Donno IT/GD, CERN
Comparison of LCG-2 and gLite v1.0
gLite Middleware Status
Slides contributed by EGEE Team
Grid Services Ouafa Bentaleb CERIST, Algeria
Current status of gLite
Short update on the latest gLite status
Data Management cluster summary
The GENIUS portal and the GILDA t-Infrastructure
Overview of gLite Middleware
Based on material by Sergio Andreozzi INFN-CNAF
gLite The EGEE Middleware Distribution
Presentation transcript:

EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE Middleware Claudio Grandi (INFN – Bologna) Workshop Commissione Calcolo e Reti INFN June 7 th, 2006 Otranto, Italy

Enabling Grids for E-sciencE EGEE-II INFSO-RI Claudio Grandi - EGEE Industry Day - Paris - 27 April Outline Processes Middleware Summary

Enabling Grids for E-sciencE EGEE-II INFSO-RI Claudio Grandi - EGEE Industry Day - Paris - 27 April gLite process Process controlled by the Technical Coordination Group Task Forces with developers, applications, testers and deployment experts After gLite 3.0 adopt a continuous release process –No more big-bang releases with fixed deadlines for all –Develop components as requested by users and sites –Deploy or upgrade as soon as testing is satisfactory Major releases synchronized with large scale activities of VOs (SCs) –Next major release foreseen for the autumn

Enabling Grids for E-sciencE EGEE-II INFSO-RI Claudio Grandi - EGEE Industry Day - Paris - 27 April SA3 Testing & Certification Functional Tests Testbed Deployment gLite Software Process JRA1 Development Software Error Fixing SA3 Integration Deployment Packages Integration Tests Installation Guide, Release Notes, etc SA1 Pre- Production Scalability Tests Pre-Production Deployment Fail Pass SA1 Production Infrastructure Release Problem Serious problem Directives

Enabling Grids for E-sciencE EGEE-II INFSO-RI Claudio Grandi - EGEE Industry Day - Paris - 27 April Middleware structure Applications have access both to Higher-level Grid Services and to Foundation Grid Middleware Higher-Level Grid Services are supposed to help the users building their computing infrastructure but should not be mandatory Foundation Grid Middleware will be deployed on the EGEE infrastructure –Must be complete and robust –Should allow interoperation with other major grid infrastructures –Should not assume the use of Higher-Level Grid Services In line with BS group results

Enabling Grids for E-sciencE EGEE-II INFSO-RI Claudio Grandi - EGEE Industry Day - Paris - 27 April Grid foundation: Security Authentication based on X.509 PKI infrastructure –Certificate Authorities (CA) issue (long lived) certificates identifying individuals (much like a passport)  Commonly used in web browsers to authenticate to sites –Trust between CAs and sites is established (offline) –In order to reduce vulnerability, on the Grid user identification is done by using (short lived) proxies of their certificates Proxies can –Be delegated to a service such that it can act on the user’s behalf –Be stored in an external proxy store (MyProxy) –Be renewed (in case they are about to expire) –Include additional attributes VOMS: store and attach VO attributes to a proxy –Enables VO policies –In gLite 3.0

Enabling Grids for E-sciencE EGEE-II INFSO-RI Claudio Grandi - EGEE Industry Day - Paris - 27 April Grid foundation: Information Systems BDII: based on an LDAP, by LCG, is used as Information system in gLite 3.0 R-GMA: provides a uniform method to access and publish distributed information and monitoring data –Used for job and infrastructure monitoring in gLite 3.0 –Working to add authorization Service Discovery: –Provides a standard set of methods for locating Grid services –Currently supports R-GMA, BDII and XML files as backends –Will add local cache of information –Used by some DM and WMS components in gLite 3.0

Enabling Grids for E-sciencE EGEE-II INFSO-RI Claudio Grandi - EGEE Industry Day - Paris - 27 April Grid foundation: Computing Element LCG-CE: based on GT2 GRAM –To be replaced when other CEs prove reliability gLite-CE: based on GSI enabled Condor-C –Supported by Condor. More efficient. Uses BLAH (see below) –Deployed for the first time on the PS in gLite 3.0 CREAM: new lightweight web service CE –Not in gLite 3 release. Will need exposure to users on dedicated system. –WSDL interface –Will support bulk submission of jobs from WMS and optimization of input/output file transfer. Uses BLAH –Plan is to have a CE with both Condor-C and CREAM interfaces

Enabling Grids for E-sciencE EGEE-II INFSO-RI Claudio Grandi - EGEE Industry Day - Paris - 27 April Grid foundation: Computing Element BLAH: interfaces the CE and the local batch system –May handle arbitrary information passing from CE to LRMS  patches to support this and logging for accounting being added now –Used by gLite-CE and CREAM CEMon: Web service to publish status of a computing resource to clients –Supports synchronous queries and asynchronous notification –Uses the same information (GIP) used by BDII –In gLite 3 CEMon will be available to the users but the baseline is that the WMS queries the bdII

Enabling Grids for E-sciencE EGEE-II INFSO-RI Claudio Grandi - EGEE Industry Day - Paris - 27 April Grid foundation: Accounting APEL: Uses R-GMA to propagate and display job accounting information for infrastructure monitoring –Reads LRMS log files provided by LCG-CE and BLAH –Preparing an update for gLite 3.0 to use the files form BLAH DGAS: Collects, stores and transfers accounting data. Compliant with privacy requirements –Reads LRMS log files provided by LCG-CE and BLAH. –Stores information in a site database (HLR) and optionally in a central HLR. Access granted to user, site and VO administrators –Not yet certified in gLite 3.0. Deployment plan:  certify and activate local sensors and site HLR in parallel with APEL  replace APEL sensors with DGAS (DGAS2APEL)  certify and activate central HLR. Test scalability to the PS scale

Enabling Grids for E-sciencE EGEE-II INFSO-RI Claudio Grandi - EGEE Industry Day - Paris - 27 April Grid foundation: Storage Element Storage Element –Common interface: SRMv1,migrating to SRMv2 –Various implementation from LCG and other external projects  disk-based: DPM, dCache; tape-based: Castor, dCache –Support for ACLs in DPM, in future in Castor and dCache  After the summer: synchronization of ACLs between SEs –Common rfio library for Castor and DPM being added Posix-like file access: –Grid File Access Layer (GFAL) by LCG  Support for ACL in the SRM layer (currently in DPM only)  Support for SRMv2 being added now. In the summer add thread safety and interface to the information system –gLite I/O  Support for ACLs from the file catalog and interfaced to Hydra for data encryption  Not certified in gLite 3.0. To be dismissed when all functionalities are in GFAL.

Enabling Grids for E-sciencE EGEE-II INFSO-RI Claudio Grandi - EGEE Industry Day - Paris - 27 April High Level Services: Catalogues File Catalogs –LFC from LCG  In June: interface to POOL  In the summer: LFC replication and backup –Fireman  Not certified in gLite 3.0. To be dismissed when all functionalities are in LFC Hydra: stores keys for data encryption –Being interfaced to GFAL (finish by July) –Currently only one instance, but in future there will be 3 instances: at least 2 need to be available for decryption –Not yet certified in gLite 3.0. Certification will start soon AMGA Metadata Catalog: generic metadata catalogue –Joint JRA1-NA4 (ARDA) development. Used mainly by Biomed –Not yet certified in gLite 3.0. Certification will start soon

Enabling Grids for E-sciencE EGEE-II INFSO-RI Claudio Grandi - EGEE Industry Day - Paris - 27 April High Level Services: File transfer FTS: Reliable, scalable and customizable file transfer –Manages transfers through channels  mono-directional network pipes between two sites –Web service interface –Automatic discovery of services –Support for different user and administrative roles –Adding support for pre-staging and new proxy renewal schema –In the medium term add support for SRMv2, delegation, VOMS-aware proxy renewal

Enabling Grids for E-sciencE EGEE-II INFSO-RI Claudio Grandi - EGEE Industry Day - Paris - 27 April High Level Services: Workload manag. WMS helps the user accessing computing resources –Resource brokering, management of job input/output,... LCG-RB: GT2 + Condor-G –To be replaced when the gLite WMS proves reliability gLite WMS: Web service (WMProxy) + Condor-G –Management of complex workflows (DAGs) and compound jobs  bulk submission and shared input sandboxes  support for input files on different servers (scattered sandboxes) –Support for shallow resubmission of jobs –Job File Perusal: file peeking during job execution –Supports collection of information from CEMon, BDII, R-GMA and from DLI and StorageIndex data management interfaces –Support for parallel jobs (MPI) when the home dir is not shared –Deployed for the first time on the PS with gLite 3.0

Enabling Grids for E-sciencE EGEE-II INFSO-RI Claudio Grandi - EGEE Industry Day - Paris - 27 April High Level Services: Workload manag. –Short term updates: migration to GLUE 1.2 (see job priorities), bug fixing (shallow resubmission of compound jobs) –Medium term updates: new Condor (increase efficiency), fixes to increase performance, job prologue/epilogue, short jobs (SDJ), improve interactive access to jobs (e.g. top, ls), UI round-robin –Long term updates: bulk match making, high availability RB, ICE (interface to CREAM for job submission)

Enabling Grids for E-sciencE EGEE-II INFSO-RI Claudio Grandi - EGEE Industry Day - Paris - 27 April High Level Services: Job Information Logging and Bookkeeping service –Tracks jobs during their lifetime (in terms of events) –LBProxy for fast access –L&B API and CLI to query jobs –Support for “CE reputability ranking“: maintains recent statistics of job failures at CE’s and feeds back to WMS to aid planning Job Provenance: stores long term job information –Supports job rerun –If deployed will also help unloading the L&B –Not yet certified in gLite 3.0. Certification will start when requested by the TCG

Enabling Grids for E-sciencE EGEE-II INFSO-RI Claudio Grandi - EGEE Industry Day - Paris - 27 April High Level Services: Job Priorities GPBOX: Interface to define, store and propagate fine- grained VO policies –Based on VOMS groups and roles –Enforcement of policies at sites: sites may accept/reject policies –Not yet certified in gLite 3.0. Certification will start when requested by the TCG. Current plans: test job prioritization without GPBOX: 1.Mapping of VOMS groups to batch system shares (via GIDs?) 2.Two queues (long/short) for ATLAS & CMS 3.Publish info on the share in the CE GLUE 1.2 schema (VOView)  The gLite WMS is being modified to support GLUE 1.2  Testing with GPBOX if the “Service Class” is published 4.WMS match-making depending on submitter VOMS certificate  But no ranking of resources based on priority offered yet 5.Settings are not dynamic (via or CE updates) If GPBOX is needed for LHC, tests must start now!  12 months are needed to bring it to production quality

Enabling Grids for E-sciencE EGEE-II INFSO-RI Claudio Grandi - EGEE Industry Day - Paris - 27 April Summary gLite 3 being deployed on the production infrastructure –Includes all of the well known middleware from LCG New components from gLite 1.5 being deployed for the first time on the Production Infrastructure –Address requirements in terms of functionality and scalability –Components deployed for the first time need extensive testing! Developed according to a well defined process –Controlled by the EGEE Technical Coordination Group Development is continuing to provide increased robustness, usability and functionality

Enabling Grids for E-sciencE EGEE-II INFSO-RI Claudio Grandi - EGEE Industry Day - Paris - 27 April