GDE-Tohoku Meeting WG-2 (SCRF) : Tasks and Goals Akira Yamamoto 1.SCRF efforts since Fermilab Meeting 2.Replan of SCRF R&D for TDP1 & 2 3.Tasks and Goals.

Slides:



Advertisements
Similar presentations
ILC Global Design Effort 1 ILC SCRF (WG2) program GDE Status Debriefing Hitoshi Hayano 2008/2/25.
Advertisements

Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
Report of HLRF KOM S. Fukuda. Project Management Structure Area: Main Linac Technology (to be completed) Regional/Intsitutional Effort: - Director-US:
Cavity Integration summary H. Hayano April 25, 2008 ILC-SCRF
WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
SCRF WebEx Meeting May 14, Report from PMs and APMs 2.Technical Design Phase R&D plan (rev. 3) 1.High Gradient R&D guideline 2.S1-global preparation.
November LCWS08 S. Fukuda 1 KEK HLRF Status and S1- global S. FUKUDA KEK.
Rev. Apr. 7, 2008 Preparing for SCRF Meeting to be held at Fermilab, April Report from Meetings at SLAC and Fermilab Akira Yamamoto April 6, 2008.
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
Summary of Main Linac SCRF-part H. Hayano, ILC08 at UIC.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Summary and Discussion AAP-SCRF-Summary.
Summary of SRF WG, LCWS14 H. Hayano, A. Yamamoto.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
28/Jul/ Test Results of the International S1-Global Cryomodule Kirk.
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
ML Planning for ILC08 First Pass Chris Adolphsen Hitoshi Hayano.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
ILC-BAW1 ML Accelerator Operational Gradient Introduction Akira Yamamoto, Marc Ross and Nick Walker GDE Project Managers Reported at BAW1, held at KEK,
Report of Visiting PKU, Tsinghua U. IHEP Dec. 9 and 10, 2009 Kaoru Yokoya, Marc Ross, and Akira Yamamoto Report to ILC-EC, Dec. 11, 2008.
Summary of the GDE Tohoku Meeting ILC-GDE Project Managers Akira Yamamoto, Marc Ross, Nick Walker Sendai, March 6, 2008.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
ILC-EDR Kick-off Meeting Main Linac Integration Organization and Tasks Sept. 27, 2007 Akira Yamamoto ILC-EDR Kick-off Meeting, Main Linac Integration To.
Date 2007/Oct./25 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Report N. Ohuchi KEK 1.Cryomodule & Cryogenics KOM 2.GDE-meeting discussion I.Interface.
SCRF Meeting Fermilab, April 21-25, 2008 Draft agenda updated, April-10 General Agenda: 4/21: Cavity: Gradient R&D, performance, diagnostics (S0), 4/22:
SCRF Parallel Sessions at TILC09 GDE 活動報告 3月30日(月)10時~ 3号館7階会議 室 設楽 哲夫.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
ILC-EDR Kick-off Meeting Cavities Organization and Charges Sept. 19, 2007 Akira Yamamoto ILC-EDR Kick-off Meeting, Cavities Held at DESY, Sept ,
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
Global Design Effort Main Linac Technology System Kick-off Meeting Cavity Summary 20 Sept 2007 DESY Marc Ross.
Main Linac (SCRF) Technology Area Guidelines for the Meeting Akira Yamamoto Parallel Session ILC-GDE Meeting, Fermilab, Oct , 2007.
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
SCRF Meeting Fermilab, April 21-25, 2008 Draft agenda updated, April-19 General Agenda: 4/21: Cavity: Gradient R&D, performance, diagnostics (S0), 4/22:
Tuner, Coupler WP & specification table H. Hayano, KEK GDE Sendai.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
Technical Board Report TESLA Technology Collaboration Meeting, Dec. 5 – 8, 2011, IHEP, Beijing, China TESLA Technology Collaboration Meeting, Dec. 5-8,
A Proposal for FJPPL (TYL) Development of Frequency Tuners Optimization and Cryomodule Integration for 1.3 GHz SRF Cavities G. Devanz, F. Nunio, O. Napoly.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Saclay / Orsay visit – (GDE Project Managers) 1 R&D Plan: ‘Engineering Design’ Phase - presentation to Saclay / Orsay Marc Ross, Akira Yamamoto,
Global Design Effort Controls LLRF EDR Kick Off Meeting View from the Project Management Office Fermilab / ANL August 20, 2007.
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
SCRF: Monthly WebEx Meeting Oct., 19, 2011
SCRF WebEx Monthly Meeting Agenda and Reports from PM
ILC Cryogenics Work Package Status and Plans
Oct 22 Group Leaders Planning meeting
Meeting for S1-Global module design Cryomodule and Cryogenics
SCRF Monthly WebEx Meeting Sept. 22, 2010
ILC Project Management Status
ILC ‘Engineering Design’ (ED) Phase
Global System Kick-off Meeting
SCRF Monthly WebEx Meeting Jan. 12, 2010
ILC-EDR Kick-off Meeting, Cryomodule and Cryogenics
Charge for the Technical Board Members of the Tesla Technology Collaboration (TTC)
BAW Prep S1 Global Status Pilot Plant Status
Yamamoto WG3: ML-SCRF Parallel Session,
2. SCRF General Preparation for the AD&I Preparation for AAP Review
, A. Yamamoto SCRF WebEx Meeting.
WG3: Main Linac SCRF(cavity,cryomodule)
TTC meeting, Milano Global Design Effort
Presentation transcript:

GDE-Tohoku Meeting WG-2 (SCRF) : Tasks and Goals Akira Yamamoto 1.SCRF efforts since Fermilab Meeting 2.Replan of SCRF R&D for TDP1 & 2 3.Tasks and Goals at WG-2 Sendai, March 4, 2008

Efforts since Fermilab Meeting Main Works –R&D plan in EDR -->> Replan for TDP1 and TDP2 –Investigate “plug-compatible” interfaces Visiting and meetings –FNAL (Oct. 23, 26, 2007) –IHEP (Nov. 5-6, 2007) –CEA/Saclay and LAL/Orsay (Jan. 7-8, 2008) –DESY (Jan. 18, 2008) –CERN (Feb. 7-8, 2008) –J-lab (Feb , 2008) Many thanks for receiving us and discussions!

Replan of ILC-SCRF R&D updated, March 4, 2008 TDP1 by 2010: –S0: achieve 35 MV/m with 9-cell cavities at the yield 50 % under well defined processing-base, –S1-Global: achieve with cryomodule-assembly with global cooperation (for example, 4-AS, 2-US, 2-EU). Note: the S1 achievable also, if 3 Tesla-type cavities added to the existing 5 cavities in CM2 at Fermilab. –Cryomodule design: establish “plug-compatible interface and design TDP2-by 2012: –S0: achieve 35 MV/m with 9-cell cavities at the yield 90 % under well defined processing-base. –S1: achieve with full cavity-assembly (similarly processed) in single cryomodule, CM3 or CM4 (at Fermilab, US) –S2: achieved with 3 cryomodule assembly to be powered by 1 RF unit, and with beam acceleration, in STF-2 at KEK. –Industrialization: Learn from XFEL, & Cooperation with Project-X

SCRF R&D Plan at Fermilab from P5 talk by S. Holmes

Plan and Preparation for XFEL We will learn Industrialization

SCRF and STF Plan at KEK STF0.5 for TESLA-like (done Nov.2007) STF0.5 for ICHIRO (to finish Mar.2008) (red color indicates different cryostat) STF1: for TESLA-like (to finish by summer 2008) Full STF1 : (TESLA-like + ICHIRO) Not yet decided To finish within CY2008 if to be done STF2 : design in JFY2008, construction in JFY (from scratch, not extension of STF1) >>> possible extention to S1, in CY2009 or later (proposed by PMs)

Global Plan proposed CY08CY1 0 CY1 2 EDRTDP1TDP-II S0: Cavity Gradient (MV/m) (>90%) KEK-STF-0.5a: 1 Tesla-like KEK-STF-0.5b: 1 LL KEK-STF1: 4 cavities S1-Global (AS-US-EU) 1 CM (4+2+2 cavities) CM (4 AS +2 US +2 EU ) S2 & STF2: One RF unit & 3 CM with beam design Fabrication in industries Assembled and test at STF S1-Fermilab/US ILC-CM-3 or -4 CM1CM2 CM3 (Type-IV) CM4

Cryomodule Design with plug-compatible components CM with modular sub-assemblies Cost fraction –Cavity unit (cavity + helium vessel + tuner)64% –Coupler12% –Quad package (quad + corrector)4% –BPM2% –Cold-mass (cold-piping )x/19% –Vacuum vessely/19% Plug-compatible, Interface specifications (IS) –To be gendrally agree at Fermilab meeting, in April, 2008 Plug-compatible IS enables parallel development, afterwords, during the TDP phases,

Efforts for Plug-Compatible Cryomodule Design SCRF Meeting at DESY (Jan. 18, 2008) –Understanding various design options, –Home-work assigned, Meeting at CERN (Feb. 7, 2008) Visiting and Meeting at J-lab (Feb , 2008) SCRF webex Meeting (Feb. 20, 2008) GDE Meeting at Tohoku/Sendai (March, 2008) –Interim reports and discussions, –Further home-work assignment, Visiting Indian Laboratories, (March, 10-14, 2008) Some other visiting and meeting (TBD) SCRF Meeting at Fermilab (April, 21-25, 2008) –To reach agreement on the plug-compatible interfaces for further component developments

SCRF Project Management Structure ( March, 4, 2008, still to be updated) Regional/Intsitutional Effort: - Director-US: Mike Harrison - Director-EU: B. Foster - Director-AS: M. Nozaki Technical Effort (ML (SCRF) Technology): - Project Manager: A. Yamamoto - Associate Managers: T. Shidara, J. Kerby, * Group leader, ** Co-leader RegionsInstituteInstitute Leaders Cavity (Process) L. Lilje* Cavity (Prod./Int.) H. Hayano* Cryomodule N. Ohuchi* -H. Carter** Cryogenics T. Peterson* HLRF S. Fukuda* ML Integr. C. Adolphsen US Cornell Fermilab SLAC ANL J-lab H.Padamsee R. Kephart T.Raubenhaimer W. Funk H.Padamsee M. Shekhar C.Adolphsen M. Champion T.Peterson R. LarsenC. Adolphsen EU DESY CERN Saclay Olsay INFN Spain R.Brinkman J. Delahaye O. Napoly G. Wormser C. Pagani L.Lilje TBD L. Lilje TBD S. Pratt C. Pagani Parma F. P. Tavian AS KEK Korea Inst. IHEP India Inst. K.Yokoya Hayano, Noguchi, Saito HayanoTsuchiya/ Ohuchi Hosoyama/ Nakai S. FukudaHayano/Ohuc hi

How We Work Together? Just to make sure, again

Adviser from AAP to work with us 1)Hasan (Padamsee) will work with us as an adviser from Accelerator Advisary Panel (AAP), 2)Monitor the EDR work with getting report from PMs/GLs with participating general/individual technical meetings to be carried out during the EDR phase. -for examples: monthly technical group leader meetings, specifice are meeting (such as SCRF meeting in April), and individual communication, -Give us technical advices, 3)Review the progress in the EDR work, -for example, two major technical review: -Interim review in the middle of EDR (TDP1, 2), -Main review prior to the completion of the EDR (TDP1.2).

GDE Meeting, WG-2, (1) DayTimeSubjectPresented by 3/48:30Introduction and S0 and S1: replan (A. Y.) -Tasks and Goals (including S1-global) -S0 replan -S1 plan at Fermilab Yamamoto L. Lilje S. Mishra 10:30Tuner (convener H. Hayano) - Specification table - Lorentz detuning expression - KEK tuner - DESY tuner - INFN-tuner - Availability H. Hayano Y. Yamamoto S. Noguchi L. Lilje C. Pagani (by L.L.) T. Himmel 12:30lunch 14:00Coupler (convener H. Hayano) -Specification table -Fixed coupler study -XFEL coupler H. Hayano S. Noguchi G. Wormser 15:30He Vessel & plug-comp. interface ( N. Ohuchi) - Vessel specification - Interface table for plug-comp. design K. Tsuchiya N. Ohuchi 18:00 EDMS meeting

GDE Meeting, WG-2, (2) DayTimeSubjectPresented by 3/58:30Cryomodule: 5 K shield (Convener: N. Ohuchi) -Cryostat/cryogenics study at CERN (report from CERN meeting) - Thermal calculation at TTF - Thermal calculation at STF - DIscussions T. Peterson P. Pierini (by T.P.) N. Ohuchi All 10:15Quadrupole (Convener: C. Adolphsen) -Quadrupole specification and design - Quadrupole mover - Alignment of quadrupole C. Adolphsen C. Adolphsen or ? N. Ohuchi or ? 12:30lunch 14:00S1: technical discussions (A. Yamamoto0) -S1-global at KEK-STF -RF distribution system for S1-global -S1 at FNAL (technical comments) AY, HH, NO S. Fukuda (fnal) 15:30Summary and further work-assignment - Comments from AAP - Comments from PMs - Summary (further plan) All H. Padamsee M. Ross, N. Walker A. Yamamoto

Summary WG-2 Tasks and Goals –Discuss and establish the R&D plan for: High Gradient (S0) System performance with cryomodule (S1) –Discuss and agree towards: Plug compatible cryomodule design Work sharing –Prepare for the next meeting Fermilab at April (and SLAC at TBD) GDE-Dubna, and LCWS-Chicago

Back up …

GDE Meeting, Plenary, March 3 DayTimeSubjectPresented by 3/3a.m.Joint Plenary Session 3/314:00PM report: TD phase challengeN. Walker 14:45SRF technology; status and plansH. Hayano (tbd) 15:30Coffee break 16:00JINR Dubna site proposal (tentative)G. Shirkov 16:45Cost reduction strategies (tentative)W. Bialowons

GDE Meeting, Plenary, March 6 DayTimeSubjectPresented by 3/69:00WG1-SummaryTBD 9:30WG2-SummaryTBD 10:00WG3-SummaryTBD 10:30coffee 11:00WG4-SummaryTBD 11:30Engin. Manag. Plan (ILC-EDMS)N. Toge 12:00Collaboration b/w ILC and CLICJ. Dalahaye 12:30lunch 14:00Joint closing plenary; GDE close outA. Yamamoto 16:00Workshop close TDP management meeting (PM, APM, PMO, TAGL)