Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break.

Slides:



Advertisements
Similar presentations
The 4 th Asia EA Forum 2009 Program (Suzhou China, Sept.) China Software Industry Association April, 2009.
Advertisements

SunGuide TM Software Development Project Release 3.1: I-95 Express Lanes Design Review Follow-up January 29, 2008.
Planning an Onsite Training Seminar Presenter Name #/#/200# Note: this project plan was exported from Project KickStart directly to PowerPoint. Project.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group
China RSGS 1 Data Services in NRSCC Dingsheng Liu Deputy Director-General China Remote Sensing Satellite Ground Station National Remote Sensing Center.
The MPI Forum: Getting Started Rich Graham Oak Ridge National Laboratory.
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
0 - 0.
1 1  1 =.
1  1 =.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt ShapesPatterns Counting Number.
Addition Facts
LHCb VELO Production Visit November 9 th 2005 Introduction to staff Status Schedule.
© Project ESIL Project ESIL 1ESIL Abstimmung Project ESIL European Sustainable Innovation License (for SME´s) 4 th Project Meeting.
10- M3200 STD PSA – 250 PSIG Daesung Korea - Job # 8297 Kamal Hatami, Product Engineer Feb 20 th, 2009.
Introduction Lesson 1 Microsoft Office 2010 and the Internet
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
INTERNET SHIELD COURSE F-SECURE ® ANTI-VIRUS CLIENT SECURITY 6.
SAS 70 Third Party Report on Controls Overview and Timetable Finance / Audit Committee Meeting Austin, Texas January 14, 2003/ February 18, 2003.
EMU Meeting, Houston, Jan , 2002O.Prokofiev 1 EMU CMS Meeting O.Prokofiev Fermilab Summary of the CSC aging tests Copy of slides prepared for EMU.
Office 2003 Introductory Concepts and Techniques M i c r o s o f t Office 2003 Integration Integrating Office 2003 Applications and the World Wide Web.
Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting your organization’s logo –“View”
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Adding Up In Chunks.
Addition 1’s to 20.
Application of the web based technologies in tourism ( The praxis of Bulgarian tour operators and travel agencies ) Author: Tania Gorcheva, Associated.
Capacity Allocation & Congestion Management Network Codes Stakeholder Meeting 3 July 2012 Introduction & Overview \
Prof.ir. Klaas H.J. Robers, 14 July Graduation: a process organised by YOU.
Conference Program 09:00 Welcome 09:30 Session 1: Optics and Photonics 10:45 Coffee Break (Poster Session) 11:15 Session 2: Gravitation, Cosmology and.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
EMU Chambers Production Supervision FNAL Supervision Line Manag. Infor. Flow G. Apollinari N. Chester L1-L2 Managers Chamber L3 Manag. Glenn Smith.
Review of the CMS muon detector system muon detector system  Physics goals  Muon system layout  Barrel Drift Tubes Chambers (DT)  Endcap Cathode Strip.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
US CMS Collaboration Meeting, UC Riverside, May 19, Endcap Muons John Layter US CMS Collaboration Meeting May 19, 2001.
Christine KOURKOUMELIS University of Athens ATLAS Muon Chamber construction in Greece and alignment studies for H  ZZ  4μ decay Como, 8/10/03.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
ATLAS Muon System WBS 3.5 DoE/NSF M&O Evaluation Group Review BNL 19-Jan-06 Frank Taylor MIT V1.3.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
Shandong University TGC Site Review Review team General impression Material presented Possible improvements Action items Conclusions.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Zian Zhu The Tension/Pitch Machine Status and Anode Panel Measurements The Strip Capacitance Meter Status and Measurements Production Readiness Review.
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
G. PassalevaRoma - July 28, 2004 Status of MWPC production site in Florence G. Passaleva.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
CMS Upgrade Workshop, FNAL, Nov 19-21, O.Prokofiev CMS Upgrade Workshop Updated ME4/2 chamber construction costs and prototype Status and plans.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
G. PassalevaFirenze - September 8, 2004 Production Readiness Review Firenze MWPC Production Site G. Passaleva.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
MUSE Task 5 Design and Construction of a Liquid Hydrogen Target.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
University of Wisconsin
ATLAS Muon Spectrometer and
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Presentation transcript:

Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break 10:40-11:10 Prototype Prod. & Quality Li Zhou 11:10-11:30 Tension and capacitance Zian Zhu 11:30-11:45 Production Schedule Lingshu Wang 11:45-12:00 Lunch 12:00-2:00 Visit Production and Fast Site Lab 14:00 Questions and discussions 16:00 Peking Opera 18:30 CSC Production Readiness Review Aug.2-3,2001 IHEP Beijing

Agenda(continue) Aug.3,2001 Chaired by Nelson Chester Committee Meeting 9:30-10:30 Coffee Break 10:30-11:00 Finding and Recommendations 11:00-12:00 Closing Remark 12:00-12:10 Lunch Party 12:10-14:00 Tour to Temple of Heaven 14:00 CSC Production Readiness Review Aug.2-3,2001 IHEP Beijing

Production readiness Review at IHEP Review Committee Committee Members: Nelson Chester, FNAL Chairman John Carson, FNAL Oleg Prokofoe, FNAL Observers: Gena Mitselmakher, L2 Leader of CMS/EMU Andrey Korytov,UF, L3 Leader Yuri Ivanov, PNPI Russian US Consulate at Beijing National Science Funding Committee of China Ministry of Science and Technology of China Academy of Science of China

Conclusion CSC Production at IHEP Beijing ME1/3 ME1/2 IHEP Task: 72 ME1/2 & 72 ME1/3 CSC Assembly &Testing For CMS Endcap Muon System

CSC Prod. Milestones at IHEP Oct.2000-Mar.2001,Prod.Clean Lab construction Mar.29,2001 Critical tooling arrived at IHEP Apr.1-30,2001 Tooling set up and tuning Apr.26,2001 ME1/2 Prototype assembly started May.20,2001 ME1/3 Prototype started in parallel July 13,2001 ME1/2 Prototype completed July 26,2001 ME1/3 Prototype completed Aug.2-3,2001 CSC Production Readiness Review Sep.1,2001 CSC Mass Production should start

Winding Machine CSC Production at IHEP Beijing

Wire Tension and Pitch Machine CSC Production at IHEP Beijing

Glue Dispenser

Hand Soldering Table CSC Production at IHEP Beijing

Conclusion CSC Production at IHEP Beijing Training technicians

CSC Production at IHEP Beijing Anode wire fixation bar glue table

Conclusion CSC Production at IHEP Beijing Capacitance Measure set up

CSC Production at IHEP Beijing Cathode Panel Clamping Table

CSC Production at IHEP Beijing Ionized Air Clean Machine

Final Assem. table CSC Production at IHEP Beijing

CSC Fast Site at IHEP Beijing

The first ME1/2 Prototype finished On 13 th of July CMS/CSC Production of IHEP

Cosmic Ray Signal of 1 St ME1/2 Prototype On July 13th CSC Production at IHEP Beijing

ME1/3 Prototype finished

Meter Setup CSC Production at IHEP Beijing Celebrate Party

CSC Production at IHEP Beijing

IHEP CSC Management Prod.Team Fast Site Manag. Tech. Support Prod.Manager FNAL Manager Custom Office CSC Group Leader L2,L3 LeadersIHEP Director Fast Site Team

Production Chart Prod.Manager & Process Engineer Parts Proc 1pers Hand Solder -ing 2pers Final Ass.& Leak. Train. 2pers Panel. Prep. 4pers Wire wind & Solder 2pers Tension &Pitch Meas. HV test 1pers

Production Manager: SUN Hansheng Process Engineer: WANG Lingshu Fast Site Manager: ZHOU Li, HE Kangling Technique Support: ZHU Zian, ZHENG JP Custom Formality: DENG Chunqin Frame Manufacture: WEI Chenglin Prod. Responsibility Distribution

Production Manager : SUN Hansheng Responsibility: 1.Manpower management 2.Distribute task 3.Shifts arrangement 4.Quality Control Prod. Responsibility Distribution

Process Engineer: WANG Lingshu Responsibility: 1.Traveler and documents updating and translating 2.Engineering Drawing update 3.Prod.Process arrangement 4.Parts distribution 5.Record Discrepancies Prod. Responsibility Distribution

Technique Support: ZHU Zian, ZHENG JP Responsibility: Critical tooling maintaness and trouble shooting,Computer Networking CSC Web page: Custom Formality: DENG Chunqin Frame Manufacture: WEI Chenglin Fast Site Manager : ZHOU Li, HE Kangling Prod. Responsibility Distribution

1500SqMComplete New Clean Lab winding 60SqM, Tension meas.60SqM,Final 60SqM,Hand Sodering 60SqM,Panel prep.80SqM,Storage Room80SqM,Parts procurement Room30SqM 2 Equipped with Air Conditional and Pressured Gas 3 Local Tooling: Cathode Gluing Table(2),Working Table(2) Anode Wire Fixation bar Gluing Table(1&3) Hand Soldering table(4), Final Assembly Table(2) 10 sets Panel Brackets for ME1/2 and ME1/3 each Prod.Lab readiness for Mass Production

5.6 Critical Tooling Operation Menus in Chinese ready at needed places 6. Travelers translated into Chinese and copies at each process room Prod. Lab Readiness for Mass Production SqM Fast Site test room and supporting structure ready 8. Production Computers were connected to networking

Man Power for Mass Production 1.5 new hired Technicians were trained during the ME1/2 ME1/3 Prototype production, working on panel clean,gluing,hand soldering 2.Critical Tooling used by trained engineers, like Winding Machine 3.Quality Control by Engineers and Physicists(Only part time working on CSC) 4.Will have Ph.D students join the Tension Meas. And HV training soon 5.Final Assembly by Engineers Prod.Lab readiness for Mass Production

Prod. Lab Readiness for Mass Production Quality Control and Tech. Ready 1.ME1/2 and ME1/3 prototype successfully assembled,Tension,Pitch, HV training,leak test meet requirements(low Leak and dark current,no trip for 58&43 Hrs at 4KV) 2.Strict work process according to Travelers 3.Key persons at each step to control quality 4.Good Lab management fits the quality requirements

Other items 1.Budget Situation:Expensive test Gas Mixture requires more money(CF4 imported fromUS, Complicated Chamber Packing Wooden Boxes--expensive,Shipping fee by Sea container more expensive than to US(land trans.) 2.Shipping Custom formality : Three Months effort, US Consulate Great Help. More effort needed from FNAL side for doccumentation(take as scientific Gifts) 3.Frame Manufacture: More machine budget and manpower paid from IHEP 4.Fast Site manpower and Instrumentation budget not enough Prod.Lab readiness for Mass Production

ONDJFMAMJJASONDJFMAMJJASOND Prod.Schedule Chamber Ass. Fast Site Ship Unit to CERN

Key points to keep the schedule 1.Material arrives on time 2.Documents well prep.for Custom all the time 3.More training for fast team work

Frame Manufacture-0

 Receive the drawings and extrusion material from FNAL  Responsible Engineer Mr.WEI  Drawing translated to Meter System and Chinese  FeiHong company will manufacture Frames  Needed technology tools were discussed and 29 kinds jigs should be made to keep the quality  In two months the FeiHong company could deliver the Frame parts to IHEP when Money and Material arrive Frame Manufacture-1

Frame Manufacture-2 ME1/2 Frame Drawing Questions Tope Big End: 1.4*M5 parts missing, 2.6*Phi0.44,at Prototype, only 4, 3.6*M6, no at prototype frame, 4.6*phi5.2,only 5 at prototype, 5.no consistent drawing with Prototype Bottom Big End 6*Phi0.44,at Prototype, only Top Small End: 4*Phi8,4*M6, no exist at prototype Top HV Side: 8*M6,4*M6 at Prototype,Phi no at Pro. 1 Full Rad Slot, 2 at Prototype Anode Side: No consistent with Prototype Top Anode Side:0.75wide*3.15Lg.Slot No consistent

Summary Production Lab is ready Technicians trained, another 7 full working persons needed Budget may not enough(Gas, Shipping… Shipping schedule should be on time to keep Prod. speed