California Independent System Operator Soumen Ghosh Created: 06/15/2008 State Estimator for CA ISO Market and Security Applications – Relevance and Readiness.

Slides:



Advertisements
Similar presentations
The Midwest ISO from a Transmission Owner Perspective.
Advertisements

Parallel Flow Visualization Data Requirements Parallel Flow Visualization Data Requirements NERC ORS Meeting Toronto, Ontario September 23-24, 2009 Jim.
Interchange Distribution Calculator Working Group (IDCWG) Update NAESB BPS Yasser Bahbaz – IDCWG Chair September 13 th, 2012.
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
Use of Node-Breaker Model in POM Suite/ROSE Software
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
January TSS J. Gronquist, S. Kincic
Electrical and Computer Engineering Mississippi State University
Marianna Vaiman, V&R Energy
© 2011 Siemens Energy, Inc. All rights reserved. Answers for energy. PSS ® ODMS a proven solution for CIM-based network modeling Anna Geevarghese T&D Service.
Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004.
PacifiCorp-CAISO EIM Initiative Overview
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
Multi-Area Stochastic Unit Commitment for High Wind Penetration in a Transmission Constrained Network Shmuel Oren University of California, Berkeley Joint.
Announcements Be reading Chapter 6, also Chapter 2.4 (Network Equations). HW 5 is 2.38, 6.9, 6.18, 6.30, 6.34, 6.38; do by October 6 but does not need.
Voltage Security Margin Assessment Professor Dr. Garng Huang PS ERC.
California Independent System Operator Soumen Ghosh CAISO CONFIDENTIAL Created: 06/15/2008 State Estimator for CA ISO Market - Relevance and Readiness.
Getting Planning Tools Closer To Real-Time and Operation CIM User Group Meeting Austin, TX October 23-26, 2007 Loris Arnold (516)
Visibility 10/1/ Agenda Visibility Overview Status –WECC –ColumbiaGrid Issues Preliminary Thoughts Regarding Conclusions and Recommendations Next.
IMO Market Evolution Program Drew Phillips Market Evolution Program
Jay Britton
PTD Energy Management & Information Systems FERC TC: Information Technology for Reliability & Markets ISO-RTO Standards Collaborative July 14, 2004 J.
9/14/2015 IEEE Presentation Time-Based Management of Large Scale Network Models John Moseley P.E. Lead Network Model Engineer.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
American Electric Power Service Corporation Jan 26, Coordinating Controls across CREZ  What dials are available to the operators?  What are the.
Optimization for Operation of Power Systems with Performance Guarantee
Peak RCCo Performance Metrics Draft –November 2013.
Enhanced State Estimation by Advanced Substation Monitoring PSerc Project Review MeetingTexas A&M University November 7, 2001 College Station, TX PIs:
V&R Energy’s Project under PRSP: Grid Operator’s Monitoring & Control Assistant (GOMCA) Marianna Vaiman, V&R Energy JSIS Meeting.
Gestionnaire du Réseau de Transport d 'Electricité 2008 IEEE PES General Meeting: Panel on Best Practices in State Estimation Experiences and practices.
Power Application Software UPDEA - Workshop. What are Power Application Tools? Name as many of the Power Application Tools as you can Power Application.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
CASE STUDY Disturbance event comparing PMU and SE voltage angle difference in ERCOT Prakash Shrestha Operations Engineer Advanced Network Application.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb.
Market Evolution Program Day Ahead Market Project How the DSO Calculates Nodal Prices DAMWG October 20, 2003.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
1 Electricity System and Energy Market Basics David J. Lawrence Manager, Auxiliary Market Products Prepared for: RGGI I&L Workshop June 15, 2006.
September 8, 2008 TPTF Nodal Core Projects Updates Nodal Project Managers.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
Clemson University Electric Power Research Association CHANDANA BOMMAREDDY CLEMSON UNIVERSITY DG VOLTAGE CONTROL IN AN ISLANDING MODE OF OPERATION.
EMS Users Conference 1 September 23rd – 26th CIM in the Network Model Management System Joel Koepke Network Model Engineer, ERCOT.
EDS 2 Early Delivery Systems Release 3 – WebEx Conference July 10, 2007.
© Property of ERCOT /17/20041 RTCA, CAM, and SFT Presented by: John Adams November 17, 2004.
Managing Reliability and the Markets with PI
Nelson Kagan BR Session 4 – Block 3 – Planning – Paper #66 Barcelona May Technical Assessment for the Installation of Dispersed Generation.
July 10, 2008 ROS Early Delivery Systems Status – R6.3 2 Hour Test John Dumas and Jeff Gilbertson.
STATE ESTIMATOR QUALITY TRACKING IN BC Hydro EMS IMPLEMENTATION Dr. DJORDJE ATANACKOVIC, P.Eng. Engineering Team Leader, Power system Applications, Grid.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
ECE 476 Power System Analysis Lecture 13: Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
T EST T OOLS U NIT VI This unit contains the overview of the test tools. Also prerequisites for applying these tools, tools selection and implementation.
6/21/2007 TPTF: Baselines 1&2 WP and CI Baselines 1 and 2 White Papers and Change Items Diran Obadina.
Lecture 14 Power Flow Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
“Look Ahead SCED” Sai Moorty ERCOT November 28, 2011.
Market Trials Update NATF March 2,
Western Electricity Coordinating Council
Announcements Homework 7 is 6.46, 6.49, 6.52, 11.19, 11.21, 11.27; due date is October 30 Potential spring courses: ECE 431 and ECE 398RES (Renewable Electric.
Panel Session: Best Practices in State Estimation Sponsored by: Power System Analysis, Computing, and Economics Committee Panel Chair: Ali Abur Northeastern.
Grid Integration of Intermittent Resources
ISO New England System R&D Needs
Texas Nodal Load Frequency Control (LFC) EDS 3 R6
PacifiCorp-CAISO-NVE EIM Initiative Overview
The Network Model Management System
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
Time-Based Management of Large Scale Network Models
Presentation transcript:

California Independent System Operator Soumen Ghosh Created: 06/15/2008 State Estimator for CA ISO Market and Security Applications – Relevance and Readiness IEEE PES General Meeting 2008 PITTSBURGH, PENNSYLVANIA, USA July 20-24, 2008 Authors: Dinesh Salem-Natarajan,Mani Subramanian Hsiao-Dong Chiang, Liang Zhao, Wei Shao, Gordon Lin, Hua Li Matthew Varghese, & (ABB, Sugar Land, TX) (Bigwood-Systems, Ithaca, NY) Soumen Ghosh (CaISO, Folsom, CA)

California Independent System Operator Soumen Ghosh Created: 06/15/2008 Introduction CAISO Network Model (EMS Model) footprint; The Market Model footprint, Full Network Model (FNM); The models in Common Information Model/eXtensible Markup Language (CIM/XML) format; The relevant EMS applications; The implementation of Voltage Stability Analysis (VSA); Orthogonal State Estimator (SE) and its comparison with Fast Decoupled SE; The relevance of SE solution in Real Time Nodal Market and VSA; The SE Readiness Metrics adopted at CAISO and the proposed acceptable range of the metrics. Conclusion Overview

California Independent System Operator Soumen Ghosh Created: 06/15/2008 Reliability tools and market systems depend on the results produced by the SE Monitoring & Analyzing the quality and availability of every SE solution At CAISO, the SE solution is used for Real Time Power Flow and Contingency Analysis, Real Time Nodal Market, and for Voltage Stability Analysis. In the evaluation of SE readiness, Several metrics used by the Midwest ISO (MISO) and Southwest Power Pool (SPP) were reviewed Several new SE performance metrics of the SE solution at the CAISO have been identified The new SE performance metrics are to identify an unreasonable SE solution even if the solution is valid. Our hope is to set up a framework for all stake holders to work collectively in identifying a standard set of SE metrics to determine the quality of the SE solution Introduction

California Independent System Operator Soumen Ghosh Created: 06/15/2008 CAISO Network Model footprint CAISO - EMSCAISO - FNM Buses Units Loads Lines Transformers Shunts

California Independent System Operator Soumen Ghosh Created: 06/15/2008 Network Model EMS Network Model: This includes the detailed system (including sub- transmission) for the state of California and for all other WECC areas, the system is represented for voltage levels at 161 KV and above. Market Full Network Model: Detailed Network Model, mostly derived from the EMS Network Model, The power system model for the CAISO footprint, Fictitious injections on inter-ties to areas not part of CAISO markets and Commercial data for the market participants (ex: an association between a set of electrical buses to a specific LMP pricing node) CIM/XML Model Format: A common model format that can be used and understood by different platforms provided by a variety of vendors.

California Independent System Operator Soumen Ghosh Created: 06/15/2008 PSLF Model

California Independent System Operator Soumen Ghosh Created: 06/15/2008 POEPH-RIOOSO_230_BR_1_ _POE _230_30330_RIO OSO _230_BR_1 _ CIM/XML Model

California Independent System Operator Soumen Ghosh Created: 06/15/2008 Detailed Model

California Independent System Operator Soumen Ghosh Created: 06/15/2008 STATE ESTIMATOR State Estimation processes telemetered system power measurements to obtain an estimate of ‘State’ - the magnitudes and phase angles of bus voltages in the actual power systems. This calculation is based on the telemetered analog quantities (MW, MVAr, and KV) and the most current topology of the power system. Knowing the state of the power system, it calculates the MW, MVAr, and MVA flows through all the transmission lines and transformers and the MW and MVAr injections for all the loads and generation sources. These calculated voltage and power values provide useful operational information in cases when no telemetry is available. When valid telemetry does exist, the calculated quantities can be used to identify measurement errors. EMS Relevant applications REAL TIME LOAD FLOW & CONTINGENCY ANALYSIS Real Time Load Flow provides the system operator with grid information like voltage and line flows for different short-term study conditions. Real Time Contingency Analysis provides the system operator with the information on the ‘system state’ for different ‘what if’ conditions on the existing system. CAISO OUTAGE MODELING TOOL (COMT) The COMT application is a Web-based tool which allows the users to search the CAISO Outage database and identify scheduled outages that impact the network topology. The tool allows the users to develop switching instructions (based on Network Model components) that need to be automatically applied to the network model at the appropriate time. In the Real-Time COMT is used to update the status of non-telemetered points and the status points with failed telemetry.

California Independent System Operator Soumen Ghosh Created: 06/15/2008 VSA Real-Time Mode (VSA/RT) VSA Real-Time Look-Ahead Mode (VSA/LA) VSA On-line Study Mode (VSA/OS) Voltage Stability Analysis (VSA) Tool

California Independent System Operator Soumen Ghosh Created: 06/15/2008 VSA Tool Input and Output

California Independent System Operator Soumen Ghosh Created: 06/15/2008 System Load Margin: the maximum total real power transferred from source to sink before the system hits the voltage collapse point under a proposed stress pattern. Interface flow: the power flowing through an interface flow gate. The Interface Margin is the portion of the total power transferred that flows through the Interface. If the interface is defined properly in relation to the stress pattern a sizable portion of total power transferred will flow through the defined interface VSA-User Interface, RT/LA

California Independent System Operator Soumen Ghosh Created: 06/15/2008 Study mode VSA runs as a stand-alone process, which can be launched directly from the workstation as well as from the Viewer. Study mode VSA can retrieve an archival case from the VSA viewer or a Dispatcher Load Flow case directly from the data bridge. VSA -User Interface, OS

California Independent System Operator Soumen Ghosh Created: 06/15/2008 COMPARISON : INVALID RUNS for ORTHOGONAL vs. FAST DECOUPLED Stage 1 Run with existing ‘Convergence Tolerance’ Run with existing ‘Global Measurement Errors’ Stage 2 Set MW/ MVAR convergence tolerance for all Areas to 0.05 Revise the MW/ MVAR mismatch on ‘Zero Injection Buses’ measurement error tolerance to 0.1 Stage 3 Re-set convergence tolerance to values before Stage 2 Reduce the minimum values for ‘Global Measurement Errors’ For Voltages, use decrements of For Circuits, use decrements of 0.5 (then).05 For gen/loads, use decrements of 0.1 (then).01 Stage 4 Repeat steps of Stage 2 with parameters of Stage 3 Orthogonal vs. Fast Decoupled Comparisons

California Independent System Operator Soumen Ghosh Created: 06/15/2008 Real Time Market Real Time Pre Dispatch (RTPD) Executes every 15 minutes Real Time Interval Dispatch (RTID) 5 Minutes dispatches RTPD & RTID Utilizes the Full Network Model updated by the real time State Estimator solution to get the current operating conditions to initialize the power flow. State Estimator Solution resides in Enterprise Integration Bus to be used by RTPD and RTID. State Estimation & Real Time Market

California Independent System Operator Soumen Ghosh Created: 06/15/2008 In the RTM environment the static model is updated with dynamic data based upon real time operations that comes from the State Estimator application which is merged with commercial Market and Supplemental Market Data Maintenance (SMDM) system data for the various Market runs. The static market model from the GDB and the dynamic model of the power system are exported from the EMS to the RTM system. For the RTM analysis, the State Estimator solution along with Topology Information from the EMS is transmitted to the RTM System and used to initialize the Power Flow. State Estimation & Market

California Independent System Operator Soumen Ghosh Created: 06/15/2008 SE/ DLF Solution Quality Monitor

California Independent System Operator Soumen Ghosh Created: 06/15/2008 SE/ DLF Solution Quality Monitor

California Independent System Operator Soumen Ghosh Created: 06/15/2008 Importance of the quality of the information provided by the SE to the various reliability and market tools At the California ISO, the SE solutions are required for (1) The Real Time Market and for (2) Security Applications such as Voltage Stability Analysis. This paper proposes the formulation of metrics to study the availability and quality of the SE solution. Conclusion

California Independent System Operator Soumen Ghosh Created: 06/15/2008 Questions and Answers