July 14 2003Cornell ALC Workshop Gene Fisk1 LC Muon Detector Studies Overview (mostly recent prototype hardware development plans) Fermilab A. Bross, B.

Slides:



Advertisements
Similar presentations
1 A first design of the PEP-N Calorimeter A first design of the PEP-N Calorimeter Presented by P. Patteri Laboratori Nazionali di Frascati INFN for PEP-N.
Advertisements

LHCb Alignment 12 th April 2007 S. Viret Coseners Forum « LHC Startup » 1. Introduction 2. The alignment challenge 3. Conclusions.
Prototype sPHENIX Calorimeters
HELYCON Hellenic Lyeum Cosmic Observatories Network Developing and Constructing An Extensive Air Shower Detector Antonis Leisos Hep2006-Ioannina Hellenic.
Slippery Slope
SNS Spallation Neutrino Source 1 SNS layout GeV proton linear accelerator Accumulator ring Main target Stripping foil.
The characteristics of the MA-PMT HAMAMATSU : H for the MINICAL Samuel Kazarian, Volker Korbel, Pavel Murin, Stefan Valkar, Jan Weichert.
The group is developing readout electronics for initial use with the prototype test-stand at Fermilab. This work will contribute towards the design and.
CMS Outer Hadron Calorimeter (HO) Project Naba K Mondal Tata Institute, Mumbai, India.
LHCf: a LHC Detector for Astroparticle Physics LHCf: a LHC Detector for Astroparticle Physics Lorenzo Bonechi on behalf of the LHCf Collaboration * University.
How to Build a Neutrino Oscillations Detector - Why MINOS is like it is! Alfons Weber March 2005.
02/10/2004 Minimum Bias Trigger Scintillator Counters (MBTS) for early ATLAS running M.Nessi ATLAS week, Freiburg.
1 Prototyping Megaton-Scale  Detectors Jason Trevor DOE Review July 25, 2007 Developing a New Lower-Cost Scintillator Design.
Muon Detector R&D Vishnu V. Zutshi NIU/NICADD. RPC based.
P. Karchin – Scintillator Based Muon System Collaboration page 1 1/8/2004 January 8, 2004 American Linear Collider Physics Group 2004 Workshop Stanford.
LCD Muon/PID Meeting Friday Oct 29, SUBSCRIBE FIRSTNAME LASTNAME There are "underscores" between: Fermilab, LC.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
The Design of MINER  A Howard Budd University of Rochester August, 2004.
P. Karchin – PMTs for Scintillator Based Muon Systempage 11/7/2004 January 7, 2004 American Linear Collider Physics Group 2004 Workshop Stanford Linear.
NuMI MINOS The MINOS Far Detector Cosmic Rays and their neutrinos are being collected now. How does this work, and of what use is this data? Alec Habig,
New Hexagonal Design for MINERvA A. Bodek- Sept Now even counters have a 1.2 solid steel picture frame Around the 3 m wide active target. The.
M.Gallinaro, ``Innovative Particle and Radiation Detectors’’, Siena, October slide 1 The CDF MiniPlug Calorimeter Forward Physics Conceptual.
Dhiman ChakrabortyCalorimetry + muon/p-id summary LC workshop, Cornell, 16 July, '03 2 Calorimetry Performance goals Electromagnetic Calorimetry (ECal)
NuMI Schematic View of the MINOS Scintillator System 8 m Scintillator Module WLS Fibers Optical Connector Clear Fiber Ribbon Cable (2-6 m) Multiplex Box.
J.S. Suh The Second Korean ILC Workshop Plastic Scintillator Detector for ILC Jun-Suhk Suh KNU/CHEP.
July 29, 2004 American Linear Collider Physics Group Victoria Linear Collider Workshop Muon Detector MAPMT Tests - Calibration R&D Scintillator Based Muon.
Shower Containment and the Size of a Test Calorimeter Adam Para, September 6, 2006.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
The Design and Performance of the MINER A Detector Howard Budd, University of Rochester Technology and Instrumentation in Particle Physics 2011.
March 12, 2006R. Abrams LCWS06 Bangalore1 ILC Prototype Muon Scintillation Counter Tests Robert Abrams Indiana University.
Electromagnetic Calorimeter for the CLAS12 Forward Detector S. Stepanyan (JLAB) Collaborating institutions: Yerevan Physics Institute (Armenia) James Madison.
Linear collider muon detector: Marcello Piccolo Amsterdam, April 2003.
July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.
Agenda for LC Muon Detector Studies Mtg Black Hole Tues. Aug. 5 12:30 – 14:00 Parts for the prototype planes. 15 min.Gene Fisk MAPMT FE electronics/cal.
Scintillator ECAL for ILC for Calorimeter Review DESY May2007 Tohru Takeshita (CALICE-Shinshu) Idea implementation current status future mile stones.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
Hadron Calorimeter HCAL-J GEp Electron Calorimeter BigCal Hadron Calorimeter 1 G. Franklin, Carnegie Mellon University 10/13/2011.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Muon/Special Detector Studies Update St. Malo Muon ID - Single muons, single pion rejection. TESLA TDR (M. Piccolo) 2. Muon ID events:  ID efficiency,
1 ILC/SiD Muon System Progress Colorado State – D. Warner, R. Wilson Fermilab – G. Fisk, C. Milstene UC Davis – J. Lizarazo, M. Tripathi Indiana University.
1 Scintillator Based Muon System R&D Institutions/Collaborators Fermilab: A. Bross, B. Choudhary, H.E.
LCD Muon Studies – FY03 Progress Report University of California, Davis Fermilab Northern Illinois University University of Notre Dame Wayne State University.
EUROnu WP5 Detector Costing EuroNu Annual General Meeting, Strasbourg 3 June 2010 Paul Soler.
Magnetized hadronic calorimeter and muon veto for the K +   +  experiment L. DiLella, May 25, 2004 Purpose:  Provide pion – muon separation (muon veto)
MAMUD Magnetized hadronic calorimeter and muon veto for the K +   +  experiment L. DiLella, March 29, 2005 Purpose:  Provide pion – muon separation.
LC Muon Detector Development Overview Hardware R&D Goals Hardware Configuration Design Issues Procurement, Engineering, Manpower Additional Development.
A Magnetic Detector for MINERvA G. Tzanakos, University of Athens Modular Structure Fe Torroids, strong Toroidal Magnetic Field Scintillator strips WLS.
Linear collider muon detector: Marcello Piccolo Amsterdam, April 2003.
E. W. Grashorn and A. Habig, UMD, for the MINOS Collaboration The Detectors of The Main Injector Neutrino Oscillation Search (MINOS) Experiment The MINOS.
MINER A Main INjector ExpeRiment for v-A Active segmented scintillator detector: 5.87 tons Nuclear targets of C, Fe and Pb, Water, Helium.
SiD Muon Detector Progress. Overall concept 2 There are slots in the iron. We will insert modules of orthogonal strips of appropriate size into the slots.
Strip-scintillator/Si avalanche photo-diode Muon System Fermilab Test beam + Inst INFN Udine APDs Notre Dame Scint /WLS Baseline: Resistive Plate Chambers.
Paul Rubinov on behalf of Gene Fisk, Kurt Krempetz 22 Aug 2012.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
The ICD Project Alan L. Stone Louisiana Tech University All D0 Meeting - 7 September 2001.
A Brand new neutrino detector 「 SciBar 」 (2) Y. Takubo (Osaka) - Readout Electronics - Introduction Readout electronics Cosmic ray trigger modules Conclusion.
2008 European School of High-Energy Physics - Trest, Czech Republic - 19 August - 1st September Target Tracker Data Analysis In OPERA Experiment S. Dmitrievsky,
Scintillator-based Muon System G. Fisk, A. Para, P. Rubinov - Fermilab, D. Cauz, A. Driutta, G. Pauletta - IRST/INFN-Udine, R. Van Kooten, P. Smith - Indiana.
H.E. Fisk, A. Meyhoefer, A. Para, E. Ramberg, P. M. Rubinov Fermilab
Detailed Baseline Design - Muons
EURONu Collaboration Board,
H. R. Band University of Wisconsin H. E. Fisk Fermilab
IFR Status Summary W. Baldini on behalf of the IFR Group
SCINTILLATING DIGITAL HADRON CALORIMETER
Chris Smith California Institute of Technology EPS Conference 2003
SCINTILLATOR HARDWARE
Vishnu V. Zutshi For the NICADD team.
Study of a Scintillating Digital Hadron Calorimeter Prototype
LC Muon Detector Development Overview
Presentation transcript:

July Cornell ALC Workshop Gene Fisk1 LC Muon Detector Studies Overview (mostly recent prototype hardware development plans) Fermilab A. Bross, B. Choudhary, G. Fisk, K. Krempetz, A. Para, O. Prokovief, R. Stefanski University of California at Davis M. Tripathi, B. Holbrook, J. Lizarazo, Y. Bansal Northern Illinois University G. Blazey, A. Dychkant, D. Hedin, D. Chakraborty,G. Lima, A. Maciel, C. Milstene University of Notre Dame M. McKenna, M. Vigneault, B. Baumbaugh, M. Wayne Wayne State University P. Karchin, A. Gutierrez, R. Medipalli

July Cornell ALC Workshop Gene Fisk2 Steel Cross Section 4.45m 6.55m Fe Thickness = 10 cm Gap = 5 cm Fe Cross Section 1.5 cm  5 cm

July Cornell ALC Workshop Gene Fisk3 The Big Picture - Orientation Scintillator based muon system aims to do both muon identification via their penetration through the solenoid return yoke (> 1.4m Fe) and the measurement of hadronic shower energy that escapes out the back of the Hcal. Our candidate geometry for the detector planes consists of scintillator strips with 1.2mm dia. WLS fiber that captures light and pipes it to multi-anode PMTs outside the return yoke Fe. The strips are oriented at 45 o w.r.t. the beam axis to make alternating u and v planes with increasing radius. From measurements that MINOS has done we expect a m.i.p. will give ~ 15 p.e. per hit. The expected hadronic energy resolution  E h /E h ~ 1/√E, but this must be measured. Simulation studies show that muon ID is efficient using this prototype design and that in most cases the muons can be tracked back into Hcal. Over the past year, the universities who have joined the LC muon detector studies, have organized to embark on the development of prototype detector planes.

July Cornell ALC Workshop Gene Fisk4 50 GeV  - event 11 run 0 EyeFish View-18 hits in Muon Detector

July Cornell ALC Workshop Gene Fisk5 Scintillator Layout and Strips Scintillator: 4.1 X 1 cm 2 co-extruded strips with 1 mm dia. WLS fiber and outer reflector of TiO 2. U/V strips with wls shifted light exiting both ends. Add left/right signals from clear fibers with optical OR to provide one signal per strip.

July Cornell ALC Workshop Gene Fisk6 Prototype Module Layout 2.5m 5.0 m 43 full strips 3.6m (L) x 4.1cm (W) x 1cm (T) 43 short strips 3.6m => 0m long Read out: both ends of full strips; one end of short strips (except the shortest 22). 2*( ) fibers/side =128 channels = 8 (1.2mm dia) fibers/pix * 16(4 x 4mm 2 ) pixels => Equivalent of One MAPMT/prototype plane

July Cornell ALC Workshop Gene Fisk7 How many prototype planes & strips? Each plane is the equivalent of 86 strips that are 3.6 m long. Each strip has a mass of 1.52 kg or 3.3 lbs. The weight of a plane (86 strips) is 131 kg or 288 lbs. Order 15% extra scintillator – 100 strips per plane or 330 lbs (152kg). 3 u & 3 v to over-constrain a straight line = 6 planes + one spare to use for resolving multi-hit ambiguities. => 7 planes. Total scintillator is 2,341 lbs (1.17T) or 700 strips or Tonnes. Scintillator Cost - MINOS paid ~ $10/kg or $10K/tonne. Assume a 50% add’l cost for a small order: $16K

July Cornell ALC Workshop Gene Fisk8 MINOS Hamamatsu H6568 Multi-anode PM 16 anodes ea. 4 x 4 mm 2

July Cornell ALC Workshop Gene Fisk9 MINOS – MAPMT with fiber guide

July Cornell ALC Workshop Gene Fisk10 Fiber quantities and costs WLS Fiber Buy enough to instrument every strip: 100 strips*3.6m/strip = 360 m times 8 planes (one to learn on). => 2.88km Kuraray quote of $3.29m => $9,475 plus shipping & duty so add $1,500, which brings the total to: $11K WLS Clear Fiber From engineering drawing: Short near strips: 21*3.6 m = 76m Full strips: 43*(3.6m +1.3m) = 211m Short far strips: 21*3.3m = 69m Total 356m => 390m times 8 planes 3,120 m Clear cost = 3.12km*$3.11K/km = $9.7K +$1.5K = $11.2K Clear

July Cornell ALC Workshop Gene Fisk11 Multi-anode Photomultipliers 16 channel multi-anode PM 30mm Hamamatsu H anode PM’s come in two varieties: w/ or w/o base. H with base $ ea. for 6 or more. R M16 w/o base $ ea. for 6 or more. We will need at least 14 MAPMTs for R&D: 8 for the 7 planes; 2 to replace two loaner tubes (spares); 4 for bench tests of electronics; Procure 7 w/bases; 7 w/o bases. Cost: $9,036 + $7,080 = $16,116

July Cornell ALC Workshop Gene Fisk12 Other R&D Items Al skins: (top and bottom) 150 $3/lb => $450/plane; 8 * 450 = $3,600 Epoxy: $1000 Routing, connectors & clear wave guides: Mitch Wayne – Notre Dame Calibration Scheme/Hardware: Paul Karchin – Wayne State FE & readout electronics: Mani Tripathi – UC Davis & Paul Karchin – Wayne State Cables, PS, Crates, Trigger, DAQ: Mani Tripathi – UC Davis Testing: QC for scintillator/fiber – Fermilab, NIU & ND Cosmic Ray & Source tests at Fermilab – All Beam Tests – Not yet planned

July Cornell ALC Workshop Gene Fisk13 Incomplete R&D Cost Estimate

July Cornell ALC Workshop Gene Fisk14 Outlook We will order scintillator strips and fiber after appropriate review of our R&D prototype design. There is effort on most R&D topics, but not all; e.g. multiplexing scheme needs study. With the scintillator extrusion machine in Lab 5 at Fermilab, there are a number of questions that could be investigated, some of which require event simulation studies, e.g. optimal strip width. We are making slow, but positive progress. Pace is largely dictated by money and manpower. Manpower needs to increase significantly for more rapid progress. University collaborators would do more with increased funding which, we hear, is, or will happen. Muon detector studies are at an interesting point, both with regard to software, such as muon identification, and hardware, such as prototype detector development.

July Cornell ALC Workshop Gene Fisk15