TRR/ARB Presentation Yanomamo Interactive DVD System Team 06 - December 4, 2013 ●Reetika Rastogi - Project Manager, Life Cycle Planner ●Tushar Saxena -

Slides:



Advertisements
Similar presentations
Requirements Engineering Processes – 2
Advertisements

Chapter 5 Transfer of Training
Accredited Supplier Communications Plan FY09-10 Q1 to Q4 May 2009, v2.0 Home Access Marketing & Stakeholder Engagement Team.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 1 Embedded Computing.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 116.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 40.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
Remote Educational Programming Of Robots (REPOR) Tord Fauskanger Aurelie Aurilla Bechina Arntzen Dag Samuelsen Buskerud University College.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Aviation Security Training Module 4 Design and Conduct Exercise II 1.
Electronic Resources in the EUI Library
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Introduction to HTML, XHTML, and CSS
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Modern Systems Analyst and as a Project Manager
ZMQS ZMQS
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Photo Slideshow Instructions (delete before presenting or this page will show when slideshow loops) 1.Set PowerPoint to work in Outline. View/Normal click.
1 Implementing Internet Web Sites in Counseling and Career Development James P. Sampson, Jr. Florida State University Copyright 2003 by James P. Sampson,
Break Time Remaining 10:00.
Configuration management
Yavapai College Self Service Banner Training. Agenda Definition of Key Concepts Log Into Finance Self Service Budget Query Overview Budget Query Procedures.
ABC Technology Project
Module 14 Major Incident Management Module 14 Major Incident Management incident Problems in major and complex incident management Major incident management.
Chapter 11: The X Window System Guide To UNIX Using Linux Third Edition.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
We are learning how to read the 24 hour clock
CMPT 275 Software Engineering
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
SIMOCODE-DP Software.
Macromedia Dreamweaver MX 2004 – Design Professional Dreamweaver GETTING STARTED WITH.
25 seconds left…...
1 Final Cut Pro X Winter Connections Conference 2012.
: 3 00.
5 minutes.
Januar MDMDFSSMDMDFSSS
Visions of Australia – Regional Exhibition Touring Fund Applicant organisation Exhibition title Exhibition Sample Support Material Instructions 1) Please.
We will resume in: 25 Minutes.
Module 12 WSP quality assurance tool 1. Module 12 WSP quality assurance tool Session structure Introduction About the tool Using the tool Supporting materials.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Database Administration
Clock will move after 1 minute
PSSA Preparation.
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
TRR ARB Presentation Women at Work Website Redesign.
Healthy Kids Zone Team Introduction Chad Honkofsky 2.
City of Los Angeles Personnel Department Mobile Application Team 02:Shreya kamani Anushree Sridhar Pattra Thongprasert Abhishek Trigunayat Travis Jones.
Elockbox Team08 Fall2014 Jian Lei Role(s): Project Manager / Builder Da Lu Role(s): Prototyper / System/Software Architect Cheng Role(s):Feasibility Analyst.
Mission Science By Team Team 07 Members Jiashuo Li Chen Li Sergey Mukhin Hanadi Mardah Yun Shao Farica Mascarenhas 2.
ShareTheTraining TRR ARB Presentation Team 11
DCR ARB Presentation Team 5: Tour Conductor.
Mission Science By Team 07.
ARB Schedule Locations
Presentation transcript:

TRR/ARB Presentation Yanomamo Interactive DVD System Team 06 - December 4, 2013 ●Reetika Rastogi - Project Manager, Life Cycle Planner ●Tushar Saxena - Operational Concept Engineer, Requirements Engineer ●Cristina Cano - Prototyper, Feasibility Analyst ●Rohit Mani - Requirements Engineer, Life Cycle Planner ●Sanjay Kutty - Feasibility Analyst, Software Architect ●Shruti Sannabhadti - Software Architect, Prototyper

Operational Concept Overview Tushar Saxena 1

Anthropological case study tool cataloging an ax- fight incident of the Yanomamö tribe Enables users to watch the incident video while reading various incident related texts Users can also look at pictures of tribe members, genealogical information, and other graphs and charts Old system (on CD-ROM) only worked on classic Mac machines New system is implemented on a DVD and browser-dependent Operational Concept Overview 2

Win Conditions ●Play Time Based Media (TBM) ●Link genealogies to TBM ●Link statistics to TBM ●Link stills to TBM ●Link text to TBM ●Provide written text for reading ● Increased availability and wider outreach of course material ● Better learning environment for students ● Facilitates deeper learning and information access about the culture ● Increased academic prestige Organizational Goals 3

TRR Outline 1. Demo of Initial Operational Capability (Product status demonstration) -- Cristina 1. Support Plan -- Rohit 1. Test Cases, Procedure and Results -- Rohit 1. Quality Focal Point -- Reetika 1. Summary of Transition Plan -- Sanjay & Shruti 4

Transition Objective ●Full operation of the capabilities provided to the client ●Provide the system on a DVD ●System functionality replicates the original system ●Testing on different browsers on our local machines 5

Transition Objective ●Testing along with client to ensure operational satisfaction ●Creating test data to ensure that the functionalities are working as expected ●Test the system at the client’s site ●Ensuring ease of use for the client as it is a new system 6

Transition Strategy Development of the system Testing the system o Look and feel o Functionality o Different machines and browsers 7

Transition Strategy Provide training to the client using the training document Create user manual Obtain feedback 8

Demo of Initial Operational Capability Cristina Cano 9

Support Plan Rohit Mani 10

Support Plan The system has been tested by implementation team and is ready for use Remaining bugs and further feature development will be handled by the client The development team will not be making any additional changes to the system 11

Test Cases, Procedures, and Results Rohit Mani 12

Testing Testing by implementation team Testing by the client Final testing will be done at the client site and the implementation team will be present to document any known issues and bugs 13

Test Cases TC-01-01: Media Playback TC-01-02: Video Skipping TC-01-03: Fullscreen video TC-02-01: Text Linking TC-02-02: Genealogies TC-02-03: Stills TC-02-04: Maps TC-02-05: Rolling Text 14

Test Procedures An acceptance test script is used to guide the testers as they interact with the system All the test cases in the test plan will be covered by this script Any bugs encountered will be documented 15

Test Results Test #1 - 11/18/2013 Rolling Text not implemented - Bug #834 Test #2 - 12/02/2013 All capabilities implemented Test #3 - 12/05/2013 Final Training and Testing 16

Quality Focal Point Reetika Rastogi 17

18

19

20

Technical Debt Not choosing to auto-detect faces Text hard-coded into the HTML file -- working on resolving now 21

Traceability Matrix OCDWinWin AgreementSSADTest Case(s) OC-1 Play Time-Based Media WC_2328, WC_2327, WC_2326UC-01, UC-04TC-01-01, TC , TC OC-2 Link text to TBM WC_2337, WC_2335, WC_2334, WC_2332, WC_2330, WC_2326 UC-01, UC-02, UC-05, UC-06, UC-09 TC OC-3 Link stills to TBM WC_2338, WC_2331, WC_2323, WC_2332 UC-02, UC-07, UC-08 TC-02-03, TC OC-4 Link statistics to TBM WC_2332, WC_2325UC-02TC OC-5 Link genealogies to TBM WC_2324, WC_2779UC-02, UC-03TC OC-6 Provide written text WC_2322UC-09TC

Transition Plan Sanjay Kutty & Shruti Sannabhadti 23

Hardware preparations Any operating system o Ex: Windows, Mac, Linux The computer should also have an operational DVD drive No extra hardware 24

Software Preparations Modern web browser is required o IE 11+, Mozilla Firefox 9+, Google Chrome and Safari 10+ The browser should be HTML5 compliant 25

Site and Staff Plan No specific site preparation is required A desktop or laptop with the mentioned requirements No staff required 26

Training DateTimeLocationContents Person being trained Responsible Personnel Training Materials 12/5/20132 pmGFS 204System Professor Gary Seamen Team Training doc, User manual 12/5/20134 pmGFS & University Gateway SystemStudentsTeamTraining doc, User manual 27

Stakeholder Roles & Responsibilities DateRoleResponsibilityLocation 12/04/13Team,Client, TA’sTransition Readiness Review ARB evaluation USC 12/02/13 – 12/05/13 Prototyper, Tester, Project Manager Perform final requirements checks and testing, resolve any issues. USC 12/02/13 – 12/05/13 Team, ClientClient training and feedback USC 12/06/13Team, ClientDeliver the system on a DVD USC 28

Milestone Plan Milestones Date for completion 1) Drive through major features developed, by client 11/18/13 2) Final Testing by Implementation Team12/04/13 3) Client Training and acceptance testing12/05/13 4) Delivery of final, completed DVD to Client 12/06/13 29

Required Resources The entire implementation team, has to be present during client training, testing and final delivery of the project Basic hardware and software requirements as enumerated earlier No additional staff or personnel required for installation or maintenance 30

Software Product Elements All the libraries, images and other necessary files required for the working of the Yanomamö Interactive project The tool for mapping the tribe members will be given to the client for future use User Manual will be included along with the rest of the files 31

Thank you! We welcome any questions or comments :)