Santhalakshmi RSM Engineering Solutions Pvt. Ltd., Of 1 st Year.

Slides:



Advertisements
Similar presentations
April 2nd, 2009 Gordon QUIGLEY 施耐德电气 全球副总裁
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advanced Piloting Cruise Plot.
Terms. 1. Globalization 2. Financing 3. Inputs.
Operations Management Maintenance and Reliability Chapter 17
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Aviation Security Training Module 4 Design and Conduct Exercise II 1.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination. Introduction to the Business.
State of New Jersey Department of Health and Senior Services Patient Safety Reporting System Module 2 – New Event Entry.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Create an Application Title 1A - Adult Chapter 3.
Process a Customer Chapter 2. Process a Customer 2-2 Objectives Understand what defines a Customer Learn how to check for an existing Customer Learn how.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
Plan My Care Brokerage Training Working in partnership with Improvement and Efficiency South East.
1 Discreteness and the Welfare Cost of Labour Supply Tax Distortions Keshab Bhattarai University of Hull and John Whalley Universities of Warwick and Western.
Step 1: Click on Tribal Products. Step 2: Click on Tribal Home Power Solutions.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Copyright ©2010 Pearson Education, Inc. publishing as Prentice Hall
© © QA Software Pty Ltd All rights reserved 1 Project Information Management Tools Inspection and Defects Management System for Projects By QA Software.
Chapter 5 – Enterprise Analysis
Introduction When you choose a restaurant for a meal, are you concerned with: The price of the meal How long you have to wait to be seated The quality.
PP Test Review Sections 6-1 to 6-6
ABC Technology Project
Andrea Mariottini Riello Gas Boilers Division
GHG Best Performance Standards San Joaquin Valley APCD ASHRAE Meeting Daniel Barber, Ph.D. Dennis Roberts, P.E. November 3, 2011.
1 Meeting carbon budgets – 5th Progress Report to Parliament Committee on Climate Change, June If you want to tweet about this report.
AEMCPAGE Relaunch 1 June 2009.
Capacity Planning For Products and Services
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
VOORBLAD.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
©2007 First Wave Consulting, LLC A better way to do business. Period This is definitely NOT your father’s standard operating procedure.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
MARKETING MANAGEMENT 13th edition
Chapter 5 Test Review Sections 5-1 through 5-4.
1 Early Intervention Central Billing Office Electronic Claims Submission.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Energy Saving in Hospitals: Hong Kong Initiatives
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Januar MDMDFSSMDMDFSSS
Mushroom Softech Pvt. Ltd.1 eCRM-Presentation Security Administration Home/Login page General Masters Customer Registration Customer Wise Search Fill up.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Database Administration
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
The Five Working Groups Faculty Development Scaling-Up Post-Graduate programmes and 1.Research & Development 2.Innovation 3.Industry - Institute Interaction.
Chapter 14: Network Design and Facility Location.
Profile. 1.Open an Internet web browser and type into the web browser address bar. 2.You will see a web page similar to the one on.
Aviation Management System 1 2  Silver Wings Aircraft Aviation Management System represents a functional “high – end” suite of integrated applications.
BY-PASS SYSTEM IN CEMENT INDUSTRY.  Using a high amount of secondary fuel and raw meal which are having often higher content of chlorine, alkalis and.
Presentation transcript:

Santhalakshmi RSM Engineering Solutions Pvt. Ltd., Of 1 st Year

S erve the Industry with Quality On Time At Competitive Price

Santhalakshmi RSM Engineering Solutions Pvt. Ltd., SRSMES is a growing Cement Plant and Waste Heat Recovery (WHR) System designer and supplier of machinery in collaboration with reputed machinery suppliers. Have good engineering consultancy capability. Our Managing Director Mr. R.S.Mani, has served for MNCs and played a key role in winning orders and executing several projects. We provide comprehensive range of services and solutions to our client’s technical and project management needs.

 New Cement Plant Design  Small Projects  Customized Solutions  Modernization, Improvements & Upgrade  Process Plant Audit  Plant Operational Support  Perform, Achieve, Trade (PAT)  Waste Heat Recovery System  Alternate Fuel Solutions  Onsite Training

JK LAKSHMI CEMENT SIROHI LINE-I PH UPGRADATION  Successfully upgraded and increasing the capacity from 3300 to 4500 TPD  Excess air Calciner was replaced by New In-Line Calciner and Tertiary Air Duct.  Three PH cyclones modifications were completed.  Three more PH cyclones engineering completed and will be executed during next shut down.

GUJARAT SIDHEE CEMENT PYROPROCESS UPGRADATION  Separate Line Calciner Preheater - Successfully modified the Cyclones 3 & 4 in both Kiln and Calciner towers  Capacity increased from 4000 to 4600 TPD  Substantial savings in pressure drop of mmwg per cyclone was achieved  Good savings in Sp. Power consumption.

ULTRATECH CEMENT, RATNAGIRI CEMENT MILL SEPARATOR REPLACEMENT  Designed and Supplied Cement Mill Separator successfully on time  Capacity will increase with this latest design separator  Specific power consumption will reduce considerably

CHETTINAD CEMENT PULIYUR - PYRO UPGRADATION  PH Cyclones 2 & 3 were upgraded.  Substantial savings in pressure drop, 50 mmwg per cyclone and savings in specific power consumption of 0.4 kWh/ton in PH fan were achieved  Calciner up-gradation is being planned to increase the residence time and to fire pet coke

CHETTINAD CEMENT PULIYUR - PYRO UPGRADATION  PH Cyclones 4 & 5 Engineering completed and will be modified during next shut down.  Substantial savings in pressure drop, 50 mmwg per cyclone and savings in specific power consumption of 0.4 kWh/ton in PH fan envisaged  Cooler up-gradation is being planned to reduce the specific fuel consumption by 3 Kcal/kg cl and reduce wear

JK LAKSHMI CEMENT SIROHI LINE-I WHRS AQC  Successfully designed,supplied and commissioned WHRS-AQC Boiler in collobaration with VEESONS  Steam generation up to 8.0 TPH achieved against guaranteed 6.2 TPH  Overall power generation increased

NAGARJUNA CEMENT, SIMHAPURI Operational Support Contract for one year period to improve the performance of the Plant, Capacity, Fuel, Power consumption and Raw Mix optimization in the following areas o Line 1 pyro process o Line 2 pyro process o Raw grinding - Vertical Roller Mill o Coal grinding - VRM & Ball Mill o Various cement grinding systems

Cement Plant Design and Supply  Complete Cement Plant Design and Supply.  Overall Exposure and capabilities are high in all sections viz. Pyroprocess, WHRS, Alternative Fuels, Raw, Coal and Cement grindings.  Consultancy services.  High Degree of Technical Expertise in Cement Plant Design & Engineering, Operation, Commissioning and Maintenance.

Plant Upgrade  Expertise in Cement Plant up-gradation with unique skills and possess highly experienced professionals.  Customized and best Solutions are provided in up-gradation instead of standard solutions.

Waste Heat Recovery System  Complete design of WHRS for the cement plant.  WHRS Engineering and Supply with reputed Suppliers.  SRSMES can conduct audit / feasibility study to establish the availability of hot gases from Pre Heater and Cooler and calculate the Possible Power Generation.  Up-gradation of WHR  With expert knowledge on cement plant our WHRS solutions are customised Alternate Fuels  Design a suitable alternative fuel feeding system.  Calculation of alternative fuel substitution rate.

Plant Audits  Establish the present performance, identify the bottlenecks and scope for improvement.  Suggestion of methods to improve overall process and operation, increase production, improve fuel efficiency, reduce the power consumption, gaseous emissions and the overall plant operating costs. Cement Plant Process Training  Customized Training modules in Cement process, Chemistry and Process measurements & plant performance evaluation. Perform Achieve Trade (PAT)  Based on the process audit, recommendations are provided to match the PAT rules in order to improve the efficiency of the plant.

We will enter into a Contract for 1 year duration with the customer and send our expert for 2 days every month to support plant operation and optimize the plant. Complete process analysis  Specialists will visit and carry out complete analysis of the plant. Prime challenges will be identified. Baseline parameters will be established. Expert suggestions to eliminate prime challenges  Suggestions to eliminate the prime challenges will be offered. Plant personnel will implement the same and send the feedback. SRSMES will analyse the reports and further improvements will be suggested. Continuous support for sustaining and enhancing the capacity  In addition from eliminating the challenges identified, capacity enhancement possibility in different sections will be studied and improvements required will be suggested.

Exploring possibilities for efficient fuel and power consumption  Fuel & Power consumption will be calculated and support offered to reduce the same to optimum value. This ultimately reduces the operating cost. Suggestions for improving raw mix and reduce production cost  Raw material details will be studied and possibilities to improve raw mix design will be explored. Suggesting and executing essential modifications and up-gradation  Modifications necessary to improve plant performance will be proposed. Engineering and design for the same will be submitted as a separate proposal.

MOU with IKN (Global) on selected WHRS  IKN is a German based cement plant supplier  Engineering and Design by SRSMES  Joint venture on supply of WHRS Agreement with FIVES-FCB  FIVES-FCB is a 200 years old French supplier of complete cement plant  Fives-FCB has various ranges of grinding mills including Horomill  SRSMES and FIVES will jointly promote grinding technology/Products to Indian customer.

ORDERS REFERENCE LIST S.NoPlant NameScope of Work 1 My Home Cement, AP Pyroprocess audit and feasibility from 2600 TPD to 3000 TPD 2 Nagarjuna Cement, AP Plant audit and feasibility study for Line-1 & 2 3 UltraTech Cement, Ratnagiri Cement Grinding system audit 4 JK Lakshmi, Sirohi Line-1 AQC boiler for existing WHR system 5 JK Lakshmi, Sirohi Line-1 PH upgradation from 3300 TPD to 4500 TPD 6 Gujarat Sidhee Cement PH upgradation, TAD modification, Raw mill internal and system modification to enhance from 4000 TPD to 5000 TPD 7 Chettinad Cements, Karikkali Line 2 complete plant audit

S.NoPlant NameScope of Work 8 Chettinad Cements, Ariyalur Line 1 & 2 complete Plant audit 9 Chettinad Cements, Puliyur Complete Plant audit 10 Chettinad Cements, Kallur Pyroprocess, Cooler & Waste Heat recovery system optimization 11 JK Lakshmi, Durg Plant up gradation feasibility from 4500 TPD to 6000 TPD 12 JK Paper Ltd., Rayagada Feasibility Study to setup a new green field cement plant 13 Shree JayaJothi, (My Home) Process audit for capacity enhancement from 5100 to 6000 TPD 14 Chettinad, Puliyur Feasibility study for implementing Waste heat recovery system 15 JK Lakshmi, Sirohi Feasibility study for Waste heat recovery system for Line-1,2 &3 ORDERS REFERENCE LIST

S.NoPlant NameScope of Work 16 UltraTech,Narmada Cement, Ratnagiri GU, Maharastra Cement Grinding Separator upgradation - Engineering & Supply Order 17 Chettinad Cement Corporation Ltd., Puliyur Cement Works Preheater stage-2,3,4&5, Calciner & Cooler Upgrade - Engineering Order 18Binani Cement Ltd., Rajasthan Line-2, 7800 tpd Pyroprocess process audit for overall system improvement 19 Mangalam Cement Ltd., Morak, Rajasthan Feasibility study for conversion of coalmill (ballmill) system to flyash drying system - consultancy & engineering study 20Binani Cement Ltd., Rajasthan Line-1, 6000 tpd Pyroprocess process audit for overall system improvement 21Binani Cement Ltd., Rajasthan Four numbers Cement Grinding System Process audit for overall improvement 22Sanghi Industries Ltd., GujaratSemi-finish grinding system process audit 23 UltraTech,Narmada Cement, Jaffarabad Cement grinding system process audit ORDERS REFERENCE LIST

S.No.Plant NameScope of Work 24UltraTech,Narmada Cement, MadgallaCement grinding system process audit 25Chettinad Cements, KarikkaliComplete Plant audit for Line-1 26JK Lakshmi, SirohiConsultancy for Line-1 Pyroprocess optimization 27Chettinad Cements, AriyalurComplete Plant audit for Line-2 28Nagarjuna Cement, Simhapuri, A.P Plant Operational support for Pyroprocess, raw grinding, coal grinding & cement grinding for Line- 1 & Line-2 29UltraTech Cement, KotputliPyroprocess study 30Dalmia Cement, DalmiapuramPyroprocess study 31UltraTech Cement, TadipatriPrecalciner study ORDERS REFERENCE LIST

Contact Details Santhalakshmi RSM Engineering Solutions (P) Ltd., # 3308, Block 3, TVH Svasti, Eswaran Koil Street, Thoraipakkam, Chennai – Tamilnadu, India Web : : Tel :