doc.: IEEE /0440r1 Submission July 2013 Jiamin Chen, HuaweiSlide 1 Dynamic Channel Transfer(DCT) procedure for IEEE aj ( 60GHz ) Date: Presenter:
doc.: IEEE /0440r1 Submission July 2013 Author List Slide 2Jiamin Chen, Huawei
doc.: IEEE /0440r1 Submission July 2013 Abstract This document is to propose a MAC protocol amendment to support dynamic channel transfer procedure for aj (60GHz) This contribution has been discussed in CWPAN group Slide 3Jiamin Chen, Huawei
doc.: IEEE /0440r1 Submission July 2013 Background(1/2) Proposed Channelization for 60GHz bands for aj –There are 6 logical channels: 2 bands with 2.16GHz bandwidth (Channel 2 & 3), 4 bands with 1.08GHz bandwidth (Channel 5, 6, 7, 8); –Supporting more than 3 logical channels for aj and keeping the backward compatibility with ad device ; 4 Channelization for 60GHz bands in China Jiamin Chen, Huawei
doc.: IEEE /0440r1 Submission July 2013 Background(2/2) Regulations that apply to the 60GHz band in China require RLANs operating in the Chinese 60 GHz band to use channel with 1.08GHz or 2.16GHz bandwidth, which requires a mechanism to coordinate the allocation of operating channel. This document propose a mechanism referred to as Dynamic Channel Transfer (DCT). This mechanism can improve the flexibility and channel utilization efficiency when networking on Chinese 60Ghz frequency band, in case that the existing idle channel can not satisfy the networking requirement for aj devices.. Jiamin Chen, HuaweiSlide 5
doc.: IEEE /0440r1 Submission July 2013 Dynamic Channel Transfer(DCT) procedure for IEEE aj(1/4) Some cases (Case 1 to Case 3): A new STA may request an existing BSS to move to another available channel to allow the new aj STAs to establish a new BSS. Slide 6 Case 1 (Channel 6, 8 are occupied by existing BSS-1 and BSS-2 at 1.08GHz) –New STA (to become PCP/AP-3) wants to start a new BSS- 3 at 2.16GHz. –PCP/AP-3 request BSS-1 on channel 6 to move to channel 7, or request BSS-2 on channel 8 to move to channel 5. –PCP/AP-1 or PCP/AP-2 shall assess the request against its capabilities and the impact on its BSS’s performance. –PCP/AP-1 or PCP/AP-2 may refuse the request for some reasons such as their BSS are busy and so on. –If the request is confirmed, PCP/AP-3 may have a chance to use channel 2 or channel 3(2.16GHz) to start a new BSS. Case 2 / 3 are similar to Case 1 Jiamin Chen, Huawei
doc.: IEEE /0440r1 Submission July 2013 Dynamic Channel Transfer(DCT) procedure for IEEE aj ( 2/4 ) Slide 7 Case 4 ( Channel 2, 8 are occupied by BSS-1 at 2.16 GHz and BSS-2 at 1.08 GHz respectively ) –New STA (to become PCP/AP-3) wants to start a new BSS-3 at 2.16 GHz. –PCP/AP-3 requests BSS-1(PCP/AP-1) on channel 2 to move to channel 7. –The PCP/AP-1 shall assess the request against its capabilities and the impact on its BSS’s performance. –PCP/AP-1 may refuse the request for some reasons. –If the request is confirmed, PCP/AP-3 may have a chance to use channel 2 (2.16GHz) for networking. Jiamin Chen, Huawei
doc.: IEEE /0440r1 Submission July 2013 Dynamic Channel Transfer(DCT) procedure for IEEE aj(60GHz) (3/4) Public action frame in spec –Inter-BSS and AP to unassociated-STA communications –Intra-BSS communication and so on Proposed new public action frame for the DCT procedure: –DCT Measurement Request frame Request one or more STAs in the DCT responder PCP/AP’s BSS ( PBSS or Infrastructure BSS ) to measure a specified channel or all other channels within supported operating class. –DCT Measurement Report frame Be transmitted from the DCT responder PCP/AP to the DCT requester PCP/AP to report the result of channel measurement or refuse the DCT request. –DCT Request frame Request DCT responder PCP/AP’s BSS to move to an new available channel reported in the DCT Measurement Report frame. –DCT Response frame Be transmitted from the DCT responder PCP/AP to the DCT requester PCP/AP to confirm or refuse the DCT request. Slide 8Jiamin Chen, Huawei
doc.: IEEE /0440r1 Submission July 2013 Dynamic Channel Transfer(DCT) procedure for IEEE aj(4/4) Dynamic Channel Transfer (DCT) procedure assessing idle channel for networking Requesting of measurements for new channel for the DCT responder BSS Reporting of the result of measurements Requesting existing BSS to migrate to a new channel Networking on target channel Slide 9Jiamin Chen, Huawei
doc.: IEEE /0440r1 Submission July 2013 Conclusion This presentation is to propose a mechanism referred to as Dynamic Channel Transfer (DCT) procedure. This mechanism can improve the flexibility and channel utilization efficiency when networking on Chinese 60Ghz frequency band, in case that the existing idle channel bandwidth could not satisfy the networking requirement for 11aj devices. Comments and suggestions are welcome! Slide 10Jiamin Chen, Huawei
doc.: IEEE /0440r1 Submission July 2013 Reference [1] IEEE /1197r0 - Physical Channel Consideration for Chinese 60GHz Band Thank You! Slide 11Jiamin Chen, Huawei