Team 726 - Phase II Short Form - Fall 2004 Phase II Short Form “Statistical Process Control, Six Sigma, Improvement for Lean Systems" Assessment of the.

Slides:



Advertisements
Similar presentations
Planning Reports and Proposals
Advertisements

Evidence-based Dental Practice Developing guidelines or clinical recommendations Slide #1 This lecture follows the previous online lecture on evidence.
1 DOE Safety Committee Handbook. 2 Effective Safety Committee! Make it work for you!
APS Teacher Evaluation
1 Dr. Ashraf El-Farghly SECC. 2 Level 3 focus on the organization - Best practices are gathered across the organization. - Processes are tailored depending.
The Nominal Group Technique Chapter 42 Research Methodologies.
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
1 Quality Indicators for Device Demonstrations April 21, 2009 Lisa Kosh Diana Carl.
Roadmap for Sourcing Decision Review Board (DRB)
QS626 Phase II Short Form Assessment of Hirzel Canning CompanyQuality System Utilizing the Industrial Technologist’s Toolkit for Technology Management.
QS 702 Summer 2004 Clark Halfrey, Larry Roman, Mark Chandler, Jim Bossert, Glenn Gee, Timothy Chow, Roger Newhouse, & Garret Kaess.
Coaching PBIS Implementation Coaching PBIS Implementation Rob Horner org.
Phase II Short Form Pencil Slat Cost Reduction Initiative Industrial Technologists' Toolkit For Technical Management QS 327 Team 2: Scott Sowders, Pam.
Industrial Technologist’s Toolkit For Technical Management (ITTTM) Assessment Overview: Orientation Tutorial Presentation 4 1. Explanation of this presentation,
A brief overview What is program evaluation? How is an evaluation conducted? When should it be used? When can it be used? Used with Permission of: John.
PPA 502 – Program Evaluation Lecture 10 – Maximizing the Use of Evaluation Results.
Beginning the Adventure of Your Thesis/Project (SWRK500) or Advanced Research (SWRK501) & Capstone Course (SWRK502) ~ Culminating Experience ~ Prepared.
Understanding Standards: Biology An Overview of the Standards for Unit and Course Assessment.
QMS, ISO and Six Sigma It’s all related….. QMS Any Quality Management System must satisfy four requirements: Processes must be defined and their procedures.
ITTTM Short Form Tool 1 Tool 1 Short Form “Technical Foundations For Industry And technology” Topics 1. Background on the toolkit 2. Kaizen defined and.
Managing Project Quality
DataLyzer® Spectrum Gage Management System introduces……
Industrial Technologist’s Toolkit For Technical Management (ITTTM) Introduction, Process, Communication Overview 1.ITTTM Toolkits, CD courseware context.
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
Short Form Tool 13 ITTTM Tool #13 Short Form “Statistical Foundations For Data-based Improvement, Lean, Six Sigma Solutions” Topics 1. Focus and benefits.
Commission on Teacher Credentialing Inspire, Educate, and Protect the Students of California Commission on Teacher Credentialing 1 Accreditation Overview.
Software Quality Assurance Activities
Everyone Has A Role and Responsibility
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
Kanban/Pull System As Part of the Continuous Improvement Process at Whirlpool Corporation - Findlay.
Industrial Technologist’s Toolkit For Technical Management (ITTTM) Content Overview: Orientation Tutorial Presentation 2 1. Explanation of the presentation,
Short Form Tool 25 ITTTM Tool #25 Short Form “ISO and QS 9000 Maturing: Foundations For Quality Services, Auditing And Lean Improvements” Topics 1. ISO/QS.
Phase I & II Short Form Presented to : Dr. John Sinn Prepared by: Team One – QS 327 Due: October 19, 2005.
Inquiry and Investigation. What was the TOPIC? PROBLEM? CIVIC INQUIRY?
Phase II QS 426/616 & 427/527 Prepared by: Aviation Security and Quality Team Summer 2005.
Current and Future Applications of the Generic Statistical Business Process Model at Statistics Canada Laurie Reedman and Claude Julien May 5, 2010.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
1 Designing Effective Programs: –Introduction to Program Design Steps –Organizational Strategic Planning –Approaches and Models –Evaluation, scheduling,
Georgia Institute of Technology CS 4320 Fall 2003.
Insert: Title of Improvement Read Out Date:. 2 Objectives for Today’s Session Share results of improvement effort Demonstrate fact-base, analytical approach.
Commission on Teacher Credentialing Inspire, Educate, and Protect the Students of California Commission on Teacher Credentialing Accreditation Overview.
Industrial Technologist’s Toolkit For Technical Management (ITTTM) Introduction, Overview: Orientation Tutorial Presentation 1 1. Explanation of this presentation,
TECHIES Team #2 Phase II Toolkits: 9, 10, 11, 13, 14, 15 Tech 302 Dr. John W. Sinn.
Industrial Technologist’s Toolkit For Technical Management (ITTTM) Process Overview: Orientation Tutorial Presentation 3 1. Explanation of this presentation,
FALCON Meeting #3 Preparation for Harnett County Schools Thursday, March 8, 2012.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
Summative vs. Formative Assessment. What Is Formative Assessment? Formative assessment is a systematic process to continuously gather evidence about learning.
 Definition of a quality Audit  Types of audit  Qualifications of quality auditors  The audit process.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Phase II QS 627/727 Documentation-based Process Improvement.
What Are the Characteristics of an Effective Portfolio? By Jay Barrett.
Beginning the Adventure of Your Thesis/Project (SWRK500) or Advanced Research (SWRK501) & Capstone Course (SWRK502) ~ Culminating Experience ~ Prepared.
Test status report Test status report is important to track the important project issues, accomplishments of the projects, pending work and milestone analysis(
Identifying Assessments
Fidelity of Implementation A tool designed to provide descriptions of facets of a coherent whole school literacy initiative. A tool designed to provide.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Continual Service Improvement Methods & Techniques.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Corrective Action Programs. 2 HSEEP Homeland Security Exercise and Evaluation Program Provides a common exercise policy and program guidance that constitutes.
Measure Phase Wrap Up and Action Items. Measure Phase Overview - The Goal The goal of the Measure Phase is to: Define, explore and classify “X” variables.
Analyze Wrap Up and Action Items
Control Phase Wrap Up and Action Items
TechStambha PMP Certification Training
Control Phase Wrap Up and Action Items
Improve Phase Wrap Up and Action Items
Adapt – Adopt Module 7 Activity Overview Approximate Time: ___ minutes
Measure Phase Wrap Up and Action Items
Module 3 Part 2 Developing and Implementing a QI Plan: Planning and Execution Adapted from: The Health Resources and Services Administration (HRSA) Quality.
QMS, ISO and Six Sigma It’s all related…..
Presentation transcript:

Team Phase II Short Form - Fall 2004 Phase II Short Form “Statistical Process Control, Six Sigma, Improvement for Lean Systems" Assessment of the ITTTM Toolkit System Under Virtual Team Environment Presented to: Dr. John Sinn Prepared by: Team 726 Fall 2004

Team Phase II Short Form - Fall 2004 Content  Short Form Purposes  Team 726 Membership  Project Descriptions  Project Objectives  Problem Statement  Assumptions/ Limitations  Research Methodology  Tool 13 Summary  FACR – Tool 13  Tool 14 Summary  FACR – Tool 14  Tool 15 Summary  FACR – Tool 15

Team Phase II Short Form - Fall 2004 Content, continued  Tool 16 Summary  FACR – Tool 16  Tool 17 Summary  FACR – Tool 17  Tool 18 Summary  FACR – Tool 18  Team 726 Project

Team Phase II Short Form - Fall 2004 Short Form Purposes Overview and summarize long form (narrative report) findings, analyses, conclusions and recommendations (FACR) for future work (2 nd half of the course). Serve as an executive summary of our team project. Highlight progress and evolving issues related to team project.

Team Phase II Short Form - Fall 2004 Team 726 Membership Team 726 is comprised of graduate students and working professionals across the country serving different types of industries and service sectors. Members include: Jim Bossert, Mark Chandler, Timothy Chow, Janett Gray, Clark Halferty, James Hicks, Vern Morris and Larry Roman. Our Instructor/Advisor is Dr. John Sinn.

Team Phase II Short Form - Fall 2004 Project Descriptions Team 726 is continuing and expanding on research conducted by Team 627/727 (Fall 2003) and Team 682/702 (Summer 2004) in assessing ITTTM Toolkit System under virtual team environment.

Team Phase II Short Form - Fall 2004 Project Objectives 1.Complete six toolkit assignments, assessing five SDA’s in each toolkit,modifying the tools to enhance the virtual team, presenting findings, and recommendations as phase reports. 2.Develop team portfolio reflecting 17 unique SDA’s and 4 continuously improved RCA’s in “grand” forms addressing main elements of appropriate ISO 9000 standard (2002 preferred). 3.Identify areas for improvement to streamline the process in using ITTTM Toolkit System.

Team Phase II Short Form - Fall 2004 Problem Statement The focus of our team project is the assessment of the ITTTM Toolkit System (sections 13-18) to determine the viability of the ITTTM Toolkit System in the application of ISO 9000 type implementation in a small to mid size service organization. We will refer to ISO 9000 (2002) as our reference standard.

Team Phase II Short Form - Fall 2004 Assumptions / Limitations Small to mid-size service organization Operating in virtual team environment Data availability Toolkits applicability Different level of experience in using ITTTM Toolkit System (learning curve)

Team Phase II Short Form - Fall 2004 Methodology The research methodology to be used is that of using the team to attempt to complete each element of the toolkit studied this semester to determine the level of understanding, the ease in completion of the tools and the transference to implementation. If we as students can successfully agree on what works, what needs improvement and how to improve, the beneficiaries will be the organizations who will use this toolkit to implement a Quality System that works.

Team Phase II Short Form - Fall 2004 Tool 13 Summary Focus and benefits of data Foundational definitions of quality Attributes, defects, defectives Inspection, data gathering systems

Team Phase II Short Form - Fall 2004 FACR – Tool 13  Team 726 has reviewed, analyzed and discussed topics related to Toolkit 13.  Members have attempted to use SDA’s, such as PASPC, VSPC, GOTA, DSDC and ISOQSAOPP to document lessons learned and examine processes in approaching our team project.  Our team has come to a consensus on narrowing down research focus and project topic after reviewing postings from members and discussing the alternatives presented to our team.

Team Phase II Short Form - Fall 2004 FACR – Tool 13, continued  All current team members (2 new members will be actively involved starting with Toolkit 14) have participated in discussions, conducted independent research on related topics and taken responsibility in compiling research data. The long and short forms are the results of the teamwork.  Although it has taken Team 726 some time to determine project focus/objectives and to be familiarized with the ITTTM Toolkit System (particularly with new improvements/processes), we have finally come together to explore exciting learning and improvement opportunities.

Team Phase II Short Form - Fall 2004 Tool 14 Summary Focus, definitions, benefits of data revisited Attributes, defects, defectives Preparation, constructing attribute charts Possible actions over time

Team Phase II Short Form - Fall 2004 FACR – Tool 14  Team focus is getting clearer  Some tools are a stretch for this module VSPC is good for variable data but not attribute  Attribute data is common in many service industries  Team is still learning how to work together  Data collection is critical, need to modify form to make more service friendly  General inspection form pretty good can go without any modification  Safety checklist needs work  Outside reading topics show the diversity of the group

Team Phase II Short Form - Fall 2004 Tool 15 Summary Attribute vs. variable systems Requirements and elements for charting Steps for constructing control charts Short run systems Using charts for ongoing improvement

Team Phase II Short Form - Fall 2004 FACR – Tool 15  Team continues to focus, and has developed a project focus.  Effort has started on Discussion Board to identify RCA/SDA’s in Tools to be modified as part of Team project.  More involved team members are using and posting to Discussion Board on frequent basis, some multiple times daily.  Most tools are a stretch for ready use in this module.  The VSPC, PASPC, and VDSRPC SDA’s are good for variable data but not attribute.  They would probably not be particularly useful for a small, virtual service organization.  Attribute data is common in many service industries, and the GIS and CEAS SDA’s would be candidates for modification in the Team Project.

Team Phase II Short Form - Fall 2004 FACR – Tool 15, continued  Team is still learning how to work together.  Issues with meeting deadlines and communications.  One team member may drop class, and team will have to redistribute tasks.  Data collection is critical, need to modify form to make more service friendly.  This could include formatting decisions on focus of SDA’s, in particular.  Outside reading topics show the diversity of the group.  Literature search as part of TRIRPA - or FACR – has demonstrated value in bringing in new and related information and ideas.

Team Phase II Short Form - Fall 2004 Tool 16 Summary  Metrology  Precision, Accuracy, Calibration, R&R  Measuring devices  4Fs: Form, Fit, Finish, Function  GDT: Geometric Dimensioning & Tolerancing  Straightness, Roundness, Flatness  Concentricity, Paralelism, Runout  Angularity, Perpendicularity, Cylindricity  Metric System

Team Phase II Short Form - Fall 2004 FACR – Tool 16  Developing team performance measures  FACR added PPDPOA: reduces value of questions at end to PPDPOA  Continued evolution PPDPOA  SDAs to improve selected: VSPC, DSPC, PASPC, GOTA  Assignments made  Continue to assess applicability of new SDAs for Team project  Progression of tailoring forms to service industry

Team Phase II Short Form - Fall 2004 FACR – Tool 17  Characteristics Variation and Systems  Use of Preventive Inspection Routines  Use of FPLP Based On Characteristics  Validation of Standard Procedures In Production.  Gage R&R in Metrology  Standards and Values  Evaluation and Analysis for Quality Improvement  Definitions of Standard Maintenance  Relationships, Issues, Involved In Characteristic Analysis, Improvement

Team Phase II Short Form - Fall 2004 FACR – Tool 17, continued  Raising team performance measures  FACR added PPDOA:  FACR questions at end diminish value to PPDPOA  Continued evolution PPDOA  Expand SDAs – DSDA, GOTA, PASPC & VSPC  Polish SDAs for service sector  Continue to assess applicability of new SDA for Team project  Further define Team 726 performance measures

Team Phase II Short Form - Fall 2004 Tool 18  Why 1.33 as an objective  General Capability Issues  Capability and ongoing improvement  Variation, out of control conditions  Quality characteristic evaluation

Team Phase II Short Form - Fall 2004 Tool 18 - FACR  Enhancing team performance measures  FACR added PPDOA:  FACR questions at end diminish value to PPDPOA  Continued evolution PPDOA  Expand SDAs: DSDA, GOTA, PASPC & VSPC  SDA’s must be clear and concise, formatted so apply to industrial services  Continue to assess applicability of new SDA for Team project  Strive to fully attain business team goals

Team Phase II Short Form - Fall 2004 Team 726 Project  The Team Project included the revision and streamlining of four Standard Dedicated Assessments (SDAs) for use by virtual teams in service industries:  Jim Bossert and Janett Gray - P Attribute Statistical Process Control (PASPC) and the SDA-Variable Statistical Process Control (VSPC)  Mark Chandler and Janett Gray - Glossary Of Terms, Applications (GOTA)  Vern Morris - Documentation System Design, Communication (DSDC)

Team Phase II Short Form - Fall 2004 Team 726 Project, continued  The Team Project also included Form Improvements by Timothy Chow for Tool 17  Portfolio Presentation Documentation Planning Organization Assessment (PPDPOA)  Tool Reading, Information Research, Project Assessment (TRIRPA)  Team Portfolio Presentation Management Assessment (TPPMA)  P Attribute Statistical Process Control (PASPC)  Variable Statistical Process Control (VSPC)  Gage Reproducibility And Repeatability System (GRARS)  Gage R & R, Training, Tradition, Infrastructural Change (GRRTTIC)  Open Agenda Tracking, Corrective Action Form (OATCAF)

Team Phase II Short Form - Fall 2004 Team 726 Project, continued  The Team Project also included Form Improvements by Timothy Chow for Tool 18:  This included PPDPOA, TRIRPA, TPPMA, PASPC, and VSPC from Tool 17  Capability Calculation (CC)  Supplier Audit General Evaluation (SAGE)  Preliminary Systematic Design Of Experiments (PSDOE)  The Team also developed a generic Findings, Analysis, Conclusions, Recommendations (FACR) for use with all Regular Critique Assessments (RCA) and Standard Dedicated Assessments (SDA)

Team Phase II Short Form - Fall 2004 Conclusion  Team 726 adapted new features/processes in using ITTTM Toolkit System, members discussed and reaching consensus in completing all RCA’s and SDA’s, particularly in adopting common practice to streamline FACR process. This step is in accordance with both the Project Objectives #1 and #2.  Utilizing primarily the Discussion Board (R&D Forum) and other communication tools, Team 726 identify four specific SDA’s to be modified for use by virtual teams in service industries. The modified SDA’s will be a part of the project deliverables. This step is corresponding to the Project Objective #3.