NOAA WEATHER WIRE SERVICE PROJECT Presented to: NWS Partners September 19, 2013 Presented by: Jim McNitt Project Manager Office of Science and Technology National Weather Service National Oceanic and Atmospheric Administration Department Of Commerce 1325 East-West Highway Silver Spring, MD Tel: X
2 Legacy NWWS
NWWS Legacy End-user System Configuration 3
New NWWS Components NWWS-Sat: Satellite broadcast via AWIPS SBN to end users. End User Client (EUC): EUC software to reside on satellite users’ systems. Functions are: message collection, message archiving, message visualization, and product filtering. Open Interface (OI): Data “push” via internet. Low-cost option for users without stringent delivery requirements. Being developed using existing NWS-Chat capability, and integrated within NWS Information Dissemination System (NIDS). National Law Enforcement Telecommunications Systems (NLETS): New software to handle message collection, message transformation based on user profile configurations, and dissemination to NLETS center to support 34 state entities, who redistribute to other state/local emergency managers End User Satellite Terminal (EUST): Contract with DRS Technical Services, Inc. 4
NWWS Systems Architecture 5
New NWWS End-user System Configuration 6
NWWS Data Product Comparisons Calypso vs. DVB-S2 Receiver (Novra S-300 or similar) 7 Calypso (current)DVB-S2 Receiver (new) RS232 Data OutputEthernet 10/100 Base T Data Output Product filtering included within receiver. No product filtering within the receiver - Filtering needs to be provided by the Government-furnished EUC application or by the end user-developed external application Data product format is WMO message.Data product format is WMO message wrapped in NOAAPort Transport layer protocol
NWWS Satellite and End User Client (EUC) Progress and Status 8 Completed System Integration Test (SIT) Completed System Acceptance Test (SAT) Posted Service Change Notice (SCN) on First meeting of Configuration Control Board (CCB) on 9/10/13 Completed the Operational Support Implementation Plan (for Tier 1, 2,and 3 support during OT&E) Completed End User Client software version.005 NWS approved the Operational Test and Evaluation (OT&E) Test Plan Completed OT&E Phase 1 Test Readiness Review (TRR) on 9/12/13 Started OT&E Phase 1 on 9/13/13. OT&E Phase 1 will continue through 12/18/13
Milestone Schedule 9 Task NameStartFinish NWWS PDR11/27/12 NWWS CDR4/16/134/17/13 NWWS Delta CDR7/31/137/13/13 Develop NLETS Release 110/8/1210/31/13 Install NLETS in the Telecommunications Gateway development environment) 11/5/1312/2/13 Develop NLETS Release 2 (including the Message Monitoring System (MMS)) 6/3/1311/29/13 NLETS Developmental Test and Evaluation (DT&E)12/3/131/24/14 Implement NWWS Open Interface (OI) in NIDS6/26/1310/2/13 NWWS Satellite System Integration Test (SIT) and System Acceptance Test (SAT) 6/11/137/24/13 SIT and SAT for NWWS OI NIDS10/3/1310/24/13 NWWS IOT&E Ph 1 (Sat and EUC)9/12/1312/18/13 Deployment Readiness Review (DRR) upon completion of Test Review Board’s review of IOT&E Ph 1 results 1/30/141/31/14 NLETS/MMS SIT and SAT1/28/143/14/14 IOT&E Ph 23/24/145/23/14 DRR for NWWS NLETS and OI7/8/14 3 months Concurrent Ops7/10/149/30/14
Questions? 10