AGS Status and Plans RHIC Spin Collaboration Meeting 2/4/11.

Slides:



Advertisements
Similar presentations
E.C. Aschenauer 2013/03/132 polarisation for Blue and Yellow t o -calibration underway minimal impact on polarization, makes A N more stable  should.
Advertisements

First Operation of MI8 Collimation Bruce C. Brown All Experimenters Meeting 22 January 2007.
APEX Report April 28-29, 2009 May 4, 2009 Fulvia Pilat Time Meeting, May
SPIN
AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
RHIC/AGS Polarimeter Study May 1, 2009 H. Huang, A. Zelesnki, B. Morozov.
Accelerator Support and Maintenance Run 14. Maintenance Tomorrow Major efforts RHIC: Major efforts RHIC: Access hrs. Access hrs. RA.
Thomas Roser Muon collaboration meeting February 8-10, 2002 AGS beam intensity upgrades What has been achieved Sextupole power supply upgrades Bunch manipulation.
Mar RHIC Planning Meeting Tuesday (Mar. 1) 12pm - Sun (Mar. 6) 8pm: 128 hours Data Taking time: 39.5 hours = ~84% Beam time with collisions (including.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
AGS pp Status Feb. 20, 2015 RSC Meeting Haixin Huang.
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
I can find the slope of a line from a table or graph.
PHENIX Status, 2/22/11 VTX commissioning on beam Local polarimeter in service 9.6% in blue, -16.6% Residual transverse component for longitudinal beam.
AGS PP Progress Haixin Huang January, 3, Haixin Huang2 Daily Activities of Last Week 12/19 Difficulty to bring beam into Booster. Source only pulses.
AGS/Booster PP Setup Plan Jan. 11, 2013 RSC Meeting Haixin Huang.
AGS pp Status Mar. 17, 2015 Time Meeting Haixin Huang.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
RHIC Status Time Meeting 2/3/2015 He is fixed into the ice at the center to which flow all the rivers of guilt; and as he beats his great wings as if to.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
Preparation for RHIC PP Run in 2011 Wednesday 20, 2010 RHIC Machine Planning Meeting Haixin Huang RUN website: RUN.
AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang.
Overview of RHIC Injector Oct. 5, 2015 Haixin Huang MEIC 2015.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Relative Polarization Measurements of Proton Beams Using Thin Carbon Targets at RHIC Grant Webb Brookhaven National Laboratory Sept 14, 2015PSTP20151 for.
» Absolute Polarimetry of Proton Beams at RHIC« Oleg Eyser for the RHIC Polarimetry Group International Workshop on Polarized Sources, Targets and Polarimetry.
AGS/Booster Status March 11, 2014 Time Meeting Haixin Huang.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
APEX Report: February 26-27, 2008 Fulvia Pilat Time Meeting, March 4, 2008.
Proton Polarimetry at RHIC K. Oleg Eyser for the CNI polarimeter group Newport News, VA, October 25, 2013.
Polarized proton projections Wolfram Fischer 11 May 2012 RHIC Spin Collaboration Meeting BNL.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
AGS/Booster PP Setup Status Feb. 5, 2013 Time Meeting Haixin/Vincent.
RHIC status Chuyu Liu Time meeting Apr. 28, 2015.
Simulation of Spin Interference and Echo Effect Abstract Successively jumping across a depolarization resonance twice produces interesting spin dynamics.
Run6 CNI Analysis: Concluding Remarks and Summary of Systematic Uncertainties A.Bazilevsky For RHIC CNI group RHIC Spin Collaboration Meeting November.
POLARIZATION MEASUREMENTS AND ABSOLUTE POLARIZATION VALUES EVOLUTION DURING PROTON BEAM ACCELERATION IN THE RHIC ACCELERATOR COMPLEX A.Zelenski, T.Roser,
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
Beam intensity profile measurements with the RHIC (AGS) C-CNI polarimeters. Polarization profile measurements. Polarimeter target mechanisms upgrades.
RHIC CNI Polarimeter status RHIC CNI Group February 26, 2008.
versus Proton spin vector Double-spin helicity asymmetry: N ++ / L ++  N +  / L +  N ++ / L ++ + N +  / L +  1 P1P2P1P2P1P2P1P2 A LL  Single-spin.
Developments and Beam Studies for the Injectors APEX Workshop 2Nov06 ahrens.
Update on the CNI polarimeter results for Run02 1.Bunch-by-bunch polarization study 2.Profiles of 0-pol bunches Osamu Jinnouchi.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Proton Polarimetry Proton polarimeter reactions RHIC polarimeters.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
RHIC Status and E-lens 101 Spin Collaboration Meeting V. Schoefer 2/6/2015.
Run 10 Start-up Status
Haixin Huang AGS Cold Snake: Status and Plans.
APEX Studies: Accelerating w. Near 3 rd Order Resonance Vincent, Al, Michiko, Steve, Don, Yun, Guillaume, Mei, Todd, Wolfram, Greg, …
RHIC Status Haixin Huang RSC Meeting 02/18/2011. l Fixed the blue dump kicker noise problem last Friday. l Declared physics last Friday. l Smooth run.
Accelerator Support and Maintenance Startup for Run 13.
Status of RHIC Polarization Studies. Summary of Polarization Studies during Run09 Tune scans: – Nearby 0.7 – Near integer tune Polarization ramp measurement.
CNI polarizations in Run09: Summary A.Bazilevsky For the RHIC CNI Group March 26, 2010 RSC meeting.
AGS Polarized Proton Status January 25, 2011 Vincent Schoefer.
AGS FY11 Summary RHIC Spin Collaboration Meeting 5/6/11.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 22 Mar 2011 Agenda: Open.
RHIC pC Polarimeter status A.Bazilevsky For RHIC CNI Group February 26, 2008.
APEX RUN-11 APEX Schedule Planned Feb. 23, pm ~ 3 ramps 8am 12x12 store Physics store Beta* unsqueeze +s* adjustment GRD+team 6x6 store AC dipole.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Polarized Proton Acceleration in the AGS with Two Helical Partial Snakes October 2, 2006 SPIN 2006 H. Huang, L.A. Ahrens, M. Bai, A. Bravar, K. Brown,
Pre-Primer Sight Word Phrases
Objective- To find the slope of a line given
graphics by Prettygrafik design
Multiple Partial Siberian Snakes
Symbols for the Type of Welds.
Multiple Partial Siberian Snakes
Presentation transcript:

AGS Status and Plans RHIC Spin Collaboration Meeting 2/4/11

Polarization profiles Measured polarization profiles in the AGS – Horizontal profile steeper than in previous runs – Vertical profile is flat Completed intensity scan with J10 scrape – Consistent with a horizontal profile – Steeper dependence than any Booster scraping method

But not at RHIC Injection Single measurement at RHIC injection – Blue (sweep, fixed) = (51.4 +/- 1.7, /- 1.3) – Yellow (sweep, fixed) = (48.2 +/- 1.5, 52.1 /- 1.2) Questions: Where does the steeper profile come from? Where does it go between AGS and RHIC? How is it affected by the jump quads?