STUDY OF PM CORRECTION FACTORS IN THE UK Dr Janet Dixon Department for Environment, Food and Rural Affairs, UK.

Slides:



Advertisements
Similar presentations
JULY JULIO AUGUST AGOSTO SEPTEMBER SEPTIEMBRE OCTOBER OCTUBRE NOVEMBER NOVIEMBRE DECEMBER DICIEMBRE LOS ANGELES UNIFIED SCHOOL DISTRICT DISTRITO ESCOLAR.
Advertisements

1 Yell / The Law and Special Education, Second Edition Copyright © 2006 by Pearson Education, Inc. All rights reserved.
Accredited Supplier Communications Plan FY09-10 Q1 to Q4 May 2009, v2.0 Home Access Marketing & Stakeholder Engagement Team.
01 Prologo 02 Bran 103 Catelyn 1 05 Eddard 1 04 Daenerys 1 06 Jon 1 07 Catelyn 2 10 Tyrion 1 08 Arya 1 16 Sansa 1 09 Bran 2 11 Jon 2 12 Daenerys 2 13 Eddard.
1_Panel Production. 380 pannelli 45 giorni di produzione = 8.4 pannelli/day.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Irish Festivals, Irish Life: celebrating the wealth of Irelands festivals Fiona Goh Consulting 2003.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. *See PowerPoint Lecture Outline for a complete, ready-made.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 116.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 107.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 40.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 44.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 29.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 101.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 58.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 112.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 75.
Are they really out to get us? Examining Interpersonal Perceptions in an Intergroup Context.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
NANC Report Future of Numbering Working Group FoN Co-Chairs Jim Castagna, Verizon Don Gray, Nebraska PSC Adam Newman, Telcordia Technologies Feb 18, 2010.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Spring 2011 Webinar State Student Assistance Commission of Indiana
ZMQS ZMQS
Version 0.3, 28 January 2004 Slide: 1 APPLICATIONS OF METEOSAT SECOND GENERATION (MSG) DETECTION OF CONTRAILS Author:Jochen Kerkmann (EUMETSAT)
East Parking Garage Project (Executive Leadership Council) January 31, 2011.
Photo Slideshow Instructions (delete before presenting or this page will show when slideshow loops) 1.Set PowerPoint to work in Outline. View/Normal click.
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
What Time Is It? Lesson by Mrs. Moody, FLE. M1M2 Students will develop an understanding of the measurement of time. a Tell time to the nearest hour and.
Break Time Remaining 10:00.
Find the total of 5 hours 10 minutes 3 hours 23 minutes 6 hours 39 minutes Click for solution + hours minutes7214 More than 60 minutes? YES: convert 60.
KARACHI FASHION WEEK CHAPTER 3 JANUARY 27 – 30, 2011 FASHION RUNWAY SHOW FASHION RUNWAY SHOW BRAND PRESENTATIONS BRAND PRESENTATIONS FASHION BRANDS EXHIBITIONS.
Calibration Method of Microwave Tb for Retrieving Accurate SST Akira Shibata JAXA / EORC Advances of Satellite Oceanography at Vladivostok, Oct. 3-6, 2007.
Pearls of Functional Algorithm Design Chapter 1 1 Roger L. Costello June 2011.
Equations, Tables and Graphs Graphing Activity. Warm UP xy InputOutput Determine if the following relations are functions.
15. Oktober Oktober Oktober 2012.
We are learning how to read the 24 hour clock
S elçuk N as SELÇUK NAS DOKUZ EYLUL UNIVERSITY SCHOOL OF MARITIME BUSINESS AND MANAGEMENT DEPARTMENT OF DECK CURRENT TRIANGLE.
24 th June Widening Participation in the 21 st Century: A decade of learning Level Zero Foundation Years – the Cinderella Programmes of Widening.
Produced by the Department of Learning and Teaching Resources, Belfast Institute. Want to be a xxxxx? Welcome to College Name Click here to start.
Charging at 120 and 240 Volts 120-Volt Portable Vehicle Charge Cord 240-Volt Home Charge Unit.
Want to be a xxxxx? Welcome to College Name Click here to start.
Using Technology Effectively Caroline Hargrove World Rowing Coaches Conference 22 nd January 2011.
Chapter 5 Test Review Sections 5-1 through 5-4.
SIMOCODE-DP Software.
25 seconds left…...
NI Executive Budget 2010 BRIEFING FOR CAL COMMITTEE.
Slippery Slope
: 3 00.
5 minutes.
Types of clocks. Types of clocks Sand clock or Hourglass clock.
Visions of Australia – Regional Exhibition Touring Fund Applicant organisation Exhibition title Exhibition Sample Support Material Instructions 1) Please.
Clock will move after 1 minute
NI Executive Budget 2010 Pre-Consultation. Outline Background and Context UK Fiscal Position Implications for NI Budget Way Forward Key Questions.
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Short Range 9 Km Expanded Range 29 Km Medium Range 43 Km Long Range 75 Km Israel border Missile Range.
Environmental Data Analysis with MatLab Lecture 15: Factor Analysis.
QA/QC of Scottish Air Quality Data Ken Stevenson.
Correcting TEOM Measurements using the KCL Volatile Correction Model David Green, Gary Fuller & Timothy Baker.
CARB Continuous PM 2.5 Monitoring Activity (BAM’s) Reggie Smith California Air Resources Board.
Environment Canada, ETC, Ottawa
Correcting TEOM Measurements using the KCL Volatile Correction Model
Presentation transcript:

STUDY OF PM CORRECTION FACTORS IN THE UK Dr Janet Dixon Department for Environment, Food and Rural Affairs, UK

Content Background to the UK equivalence study UK equivalence study Criteria used Results + problems Equivalence Guidance Policy issues

Current UK PM 10 network

Previous equivalence work in the UK May 99 to Oct 02, Published May 04 ( 6 sites Single PM 10 Kleinfiltergerat (KfG) and TEOM at each site Data evaluated using the then draft Guidance Expanded uncertainty of full data set = 30.5% - FAIL

UK Equivalence study Began Mar 04, published June 06 ( Costs: Equipment - £280,000 (400,000 Euros) Study - £240,000 (345,000 Euros) 9 organisations involved Equipment on national network Other equipment offered by suppliers/ manufacturers

Bristol East Kilbride Birmingham Teddington Sitetypewintersummer TeddingtonSuburban14/11/04 to 21/03/05 22/03/05 to 25/07/05 BirminghamUrban Background 28/11/04 to 22/03/05 23/03/05 to 22/07/05 East Kilbride Suburban13/10/05 to 12/01/06 01/08/05 to 12/10/05 BristolRoadside13/10/05 to 12/01/06 10/08/05 to 12/10/05

Equipment on the study PM 10 – Kleinfiltergerat (ref sampler) PM 10 Partisol 2025; PM 10 TEOM; PM 10 TEOM retrofitted with a Filter Dynamics Measurement System (FDMS); PM 10 OPSIS SM200, (SM200 Beta and SM200 Mass); PM 10 Met-One Beta Attenuation Monitor (BAM); PM 10 Met-One BAM retrofitted with a heater (Smart BAM); PM 2.5 – Kleinfiltergerat (ref sampler) PM 2.5 TEOM retrofitted with an FDMS.

Practical Problems encountered KfG –samplers stopping at high temp and %RH Partisol – minor problems TEOM – minor problems FDMS – sensitive to temp of station – o C SM200 – filter identification; initial filter thickness BAM – leak flow test failures Smart BAM – major problems with initial set-up – excluded from statistical analysis

Summary of deviations from CEN standards and Equivalence Guidance EN12341 – teflon coated glass fibre filters used EN14907 – no commercially available monitors Equivalence Guidance outliers due to human error rather than instrument error slopes of all datasets were all greater or all less than 1, and/or the intercepts of all datasets were all greater or all less than zero failure on WCM for the <50 % LV dataset alone Logic steps to determine whether an instrument meets the criteria for equivalence

Data examples: TEOM(3,1.03,1.3) and FDMS TEOM Expanded uncertainty: Annual LV = 32.68% Annual LV = 15.37% Daily LV = 40.38% Daily LV = 14.68%

Data examples: PM 2.5 FDMS TEOM Expanded uncertainty: Annual concentration cap = 24.45% Daily LV = not applicable

Results of the UK Study Candidate Instrument Equivalence Criteria Met?Correction Required Partisol 2025Meets criteriaNo correction required TEOMDoes not meet criteriaCorrection does not aid the adherence of equivalence criteria PM 10 FDMSMeets criteriaNo correction required PM 2.5 FDMSMeets criteriaNo correction required SM200 by BetaMeets criteriaNo correction required SM200 by MassMeets criteria after application of slope and intercept correction factors BAM † Meets criteria after application of a slope correction factor ambient conditions:

Policy Implications TEOM – UK currently applies the ‘consistent’ relationship allowed in the Directive TEOM x 1.3 is overly conservative at some sites Although non-equivalent – broad conclusions from TEOM will be same as those from equivalent instruments elevated levels of PM in some places; and particles pose a large public health risk across the UK Checking of UK national modelling will be affected

UK has begun a transitional period of making the network equivalent – initially using FDMS units retrofitted to existing TEOMs UK local authorities can continue to use TEOMs to fulfil their obligations under the Local Air Quality Management regime Implications on any epidemiology studies currently underway Policy Implications

Comparison of FDMS base vs TEOM 3 measurements from FDMS: non-volatile (base); volatile and total relationship between the FDMS base and TEOM measurements with and without the USEPA and UK correction factors: TEOM(0,1,1) = (PM 10 FDMS base )/1.360 TEOM(3,1.03,1.3) = PM 10 FDMS base

Summary Study report published 13 June 06 In the UK: TEOM fails equivalence tests Partisol 2025 Sequential Sampler; TEOM retrofitted with FDMS (for PM 10 and PM 2.5 ); and the OPSIS SM200 (by Beta) pass without correction OPSIS SM200 (by Mass) and Met One BAM pass with correction Have determined relationship between FDMS base and TEOM for future comparisons UK has commenced upgrading National Network initially using FDMS units retrofitted to existing TEOMs