Nov 13 th 2013 Paul Coates Thoughts on BIM Maturity Teams Organisations Individuals Projects
Nov 13 th 2013 Paul Coates
Nov 13 th 2013 Paul Coates Informational islands that have historically existed in the AEC industries (Hannus 1995)
Nov 13 th 2013 Paul Coates Planner Explain Building Control End User Client Design Team Connecting The requirement for each party is different Semiotics Contractor Model view definitions
Nov 13 th 2013 Paul Coates The Red Queen Effect As Best Practice advances, it is necessary to change to remain competitive
Nov 13 th 2013 Paul Coates
Nov 13 th 2013 Paul Coates Why do we want BIM maturity ? To Achieve Better Buildings
Nov 13 th 2013 Paul Coates BIM File Organisation (Heng 2011)
Nov 13 th 2013 Paul Coates How can we achieve this?
Nov 13 th 2013 Paul Coates ????
Nov 13 th 2013 Paul Coates Level 2 A managed 3D environment held in separate discipline 'BIM' tools with data attached. Commercial data will be managed by enterprise resource planning software and integrated by proprietary interfaces or bespoke middleware. This level of BIM may utilise 4D construction sequencing and/or 5D cost information. The Government’s BIM Strategy Paper calls for the industry to achieve Level 2 BIM by Level 3 A fully integrated and collaborative process enabled by 'web services' and compliant with emerging Industry Foundation Class (IFC) standards. This level of BIM will utilise 4D construction sequencing, 5D cost information and 6D project lifecycle management information.
Nov 13 th 2013 Paul Coates Consult Australia 2010
Nov 13 th 2013 Paul Coates BIM Maturity Indexes COBIT BIM Meetlat BIM Successpredictor BIMM (Succar 2009) NBIMS CMM (McCuen and Suermann 2007)
Nov 13 th 2013 Paul Coates Control Objectives for Information and Related Technology (COBIT)
Nov 13 th 2013 Paul Coates Capability Maturity Model Integrates
Nov 13 th 2013 Paul Coates Bilal Succar 2004 Technology Process Policy SoftwareHardwareNetwork ContractualRegulatory Preparatory Leadership Infra Structure Human |Resources Products & Services BIMe
Nov 13 th 2013 Paul Coates NBIMS 2007
Nov 13 th 2013 Paul Coates BIM IMPLEMENTATION: MANCHESTER TOWN HALL COMPLEX RESEARCH REPORT (University of Salford)
Nov 13 th 2013 Paul Coates NBIMS 2007
Nov 13 th 2013 Paul Coates NBIMS 2007
Nov 13 th 2013 Paul Coates Skills required ? David Cracknell
Nov 13 th 2013 Paul Coates Skills required ? Indiana University BIM Proficiency Matrix (BPM) projects.buildingsmartalliance.org/files/?artifact_id=3364
Nov 13 th 2013 Paul Coates
Nov 13 th 2013 Paul Coates
Nov 13 th 2013 Paul Coates
Nov 13 th 2013 Paul Coates
Nov 13 th 2013 Paul Coates Efficiency gains of collaborative BIM (Smith 2012)
Nov 13 th 2013 Paul Coates Synchronous vs Asynchromous Communication – Graphic credit Ramius Best Solution
Nov 13 th 2013 Paul Coates Successful Collaboration has been described as Synergy, where the sum is greater than all the parts; i.e. 2+2=5.
Nov 13 th 2013 Paul Coates The concept of a BIM Big Room to facilitate collaboration
Nov 13 th 2013 Paul Coates Revit Server 2013
Nov 13 th 2013 Paul Coates Autodesk Buzzsaw
Nov 13 th 2013 Paul Coates BIM viewed as a sociotechnical system with technological base of social components (Kennerley 2012)
Nov 13 th 2013 Paul Coates Collaboration on multiple devices
Nov 13 th 2013 Paul Coates Information Delivery Manual An information delivery manual (IDM) provides significant help in getting the full benefit from a building construction information model (BIM). If the information required is available when it is needed and the quality of information is satisfactory, the construction process itself will be greatly improved.
Nov 13 th 2013 Paul Coates Tool for Benchmarking BIM Performance of Design, Engineering and Construction Firms in The Netherlands Rizal Sebastian and Leon van Berlo AECbytes Viewpoint #33 (December 6, 2007) The Interactive Capability Maturity Model and 2007 AIA TAP BIM Award Winners Tammy McCuen, Major Patrick Suermann, P.E. An integrated approach to BIM competency assessment, acquisition and application Bilal Succar, Willy Sher, Anthony Williams CIFE, NBIMS References
Nov 13 th 2013 Paul Coates