MV. “AMBER ALENA” arrived at Karachi Port on Oct 16, 2014 consisted Packages of Power Generation units 50MW, Oil Field Machinery, Land Drilling Rigs, HOWO 50 & 70 Coal Mining Trucks and other steel cargoes i.e. Hot/Cold Rolled Steel Coils, Rolled Steel Sheet in Coils, H-I Beam, Billets, Steel Plates, Steel Wire Rods which are weighing about Metric Tons. MV. “ZHE HAI 522” arrived at Karachi Port on Oct 18, 2014 consisted 1278 Packages of Steel cargoes i.e. Checkered Plates, Hot Rolled Alloy Steel Sheet in Coils, Steel Wire Rods, Hot dipped Galvanized Steel Sheet in Coils which are weighing up to Metric Tons,. MV. “KING BRAVE” arrived at Karachi port on Oct 22, 2014 consisted 2096 packages of project cargo i.e. Komatsu Excavators & Cranes, 150 TPH Boiler and Construction Materials i.e. Mixing Plant, Steel Structure, Valve Snail Steel, Joint Steel, Channel Steel, Deformed Steel Bar, Steel Rod which are weighing up to Metric Tons.
“MV. AMBER ALENA” ARRIVED AT: KARACHI PORT PAKISTAN ARRIVED ON : 16 TH OCT 2014 PORT OF LOADING: XINGANG CHINA BERTHED AT : EAST WHARF No. 12/13 CARGO MEANT FOR : WIND POWER GENERATION PROJECTS OIL & GAS EXPLORATION COMPANY COAL MINING COMPANY STEEL INDUSTRIES, CONSTRUCTIONS AND CIVIL ENGINEERING COMMODITY: 164 PACKAGES POWER GENERATION UNITS& AUXILARIES 2500 HP LAND DRILING RIGS 02 UNITS HOWO 50 & 70 MINING TRUCKS (RHD) GENERAL(HOT/COLD ROLLED COILS / SHEET/BILLETS/H-I BEAM/ PLATES U CHANNEL ETC,) NO. OF PACKAGES: PACKAGES TOTAL WEIGHT: METRIC TONES
“MV. ZHE HAI 522” ARRIVED AT: KARACHI PORT PAKISTAN ARRIVED ON : 18 TH OCT 2014 PORT OF LOADING: BAYUQUAN CHINA BERTHED AT : EAST WHARF No. 12/13 CARGO MEANT FOR : STEEL INDUSTRIES, CONSTRUCTIONS AND CIVIL ENGINEERING COMMODITY: GENERAL(STEEL CHECKERED PLATES, HOT ROLLED ALLOY STEEL SHEET IN COILS, STEEL WIRE RODS AND HOT DIPPED GALVANIZED STEEL SHEET IN COILS ETC,) NO. OF PACKAGES: 1278 PACKAGES TOTAL WEIGHT: METRIC TONES
“MV. KING BRAVE ” ARRIVED AT: KARACHI PORT PAKISTAN ARRIVED ON : 22 ND OCT 2014 PORT OF LOADING: SHANGHAI CHINA BERTHED AT : WEST WHARF No. 24 CARGO MEANT FOR : HYDRO POWER GENERATION PROJECTS : BIOMASS GREEN FIELD PROJECTS : INFRAINSTRUCTURE COMMODITY: KOMATSU EXCAVATORS & CRANES : 150 TPH BOILER S : CONSTRUCTION MATERIALS(MEXING PLANT, STEEL STRUCTURE, VALVE SNAIL STEEL, JOINT STEEL, CHANNEL STEEL, DEFORMED STEEL BAR, STEEL ROD : NO. OF PACKAGES: 2096 PACKAGES TOTAL WEIGHT: METRIC TONES
THANK YOU FOR YOUR TIME Contact us because …. AARAS – READY FOR ACTION Whatever you’re planning, we’re there for you!! Suite 701, 7 th Floor, Business Plaza, Mumtaz Hassan Road, I.I. Chundrighar Road, Karachi – Pakistan Tel: Fax: Website :