GSC EMERGENCY COMMUNICATIONS TASK FORCE REPORT (GSC-EM TF) Chantal Bonardi, GSC-EM Task Force Convenor GSC-18 Meeting, 22-23 July 2014, Sophia Antipolis,

Slides:



Advertisements
Similar presentations
GSC: Standardization Advancing Global Communications 1 ITU-T Status Report on Disaster Relief and Early warning SOURCE:ITU-T TITLE:ITU-T Status Report.
Advertisements

Vientiane, Lao Peoples Democratic Republic, July 2012 Standardization for disasters Takashi Egawa, Vice chair of FG-disaster NEC Corporation
World Telecommunication Development Conference May to 4 June 2010, Hyderabad, India Programme 1 Resolution 47 Riccardo Passerini Telecommunication.
ITS Agenda Item at WRC-15: Automotive Short-Range High Resolution Radar.
ITU Activities on Bridging the Standardization Gap (BSG) ITU Regional Standardization Forum for Africa (Kampala, Uganda, June 2014) Vijay Mauree,
Maputo, Mozambique, April 2014 ITU Activities on Bridging the Standardization Gap (BSG) Hiroshi OTA Study Group Engineer, ITU/TSB
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GTSC-9 Summary Glenn Parsons, GTSC-9 Chair, ISACC Document No: GSC16-CL-04 Source: GTSC-9 Contact:
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC-16 Closing Plenary Summary Report Jim MacFie, Chair Ed Juskevicius, Rapporteur Document No: GSC16-CL-39r1.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All The Internet of Things (IoT) aka Machine 2 Machine (M2M) Bilel Jamoussi Chief, Study Groups Department.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:
CCSA REPORT Zemin YANG, Secretary General GSC-18 Meeting, July 2014, Sophia Antipolis, France Document No: GSC(14)18_013 Source: China Communications.
GLOBAL ICT STANDARDISATION FORUM FOR INDIA (GISFI) Prof. Dr. Ramjee Prasad, CTiF, Aalborg University Fellow IEEE, FIET, FIETE, FWWRF - Founding Chairman,
OneM2M Draft proposal for slide set. This is not intended to be a oneM2M presentation. It is a collection of source material slides which can be used.
REPORT FROM SESSION #3, CRITICAL COMMUNICATION Jonas Sundborg, ETSI Board Chairman, ETSI GSC-18 Meeting, July 2014, Sophia Antipolis, France Document.
GSC-19 Meeting, July 2015, Geneva Individual to Authority standardisation Chantal Bonardi, GSC-EM Task Force Convenor Document No:GSC-19_104a Source:GSC-EM.
TIA Report on Global Standards Collaboration 11 Meeting (GSC-11) Telecommunications Industry Association Dan Bart.
M2M Consolidation August 17-18, 2011 Washington D.C. 1 ARIB/TTC’s Feedback on Consolidation Issues M2MCons02_06.
OECD Review of Russian Statistics Peer Review Mission to Russia April 2012 Tim Davis Head, Global Relations, Statistics Directorate.
10/10/2015 GSC8 Resolutions 11 Resolutions Joint 3, GRSC 5, GTSC 1, IPR 1, UWG 1 1GSC-9, Seoul SOURCE:TTA TITLE:GSC8 Resolutions AGENDA ITEM:Opening Plenary.
What is ETSI EMTEL all about Claire d’Esclercs Technical Officer for EMTEL European Telecommunications Standards Institute.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All SMART GRID ICT: SECURITY, INTEROPERABILITY & NEXT STEPS John O’Neill, Senior Project Manager CSA.
GSC-19 Meeting, July 2015, Geneva Report of the Critical Communications Session Dr. Farrokh Khatibi (ATIS) Director of Engineering, Qualcomm Document.
CJK9, Zhangjiajie, China 1/14 Discussion: [Drafted] 3GPPs works in CJK Cooperation CJK 9, Zhangjiajie, China April 8-10,2009 Changho RYOO
25/11/2015 ITU-T NGN - Progress and Plans Brian Moore Lucent Technologies Chairman of ITU-T Study Group 13 1GSC-9, Seoul SOURCE:ITU-T TITLE:ITU-T NGN -
Report of the oneM2M Legal Subcommittee Group Name: oneM2M Steering Committee Source: Thomas Goode, ATIS, Meeting Date:
International Telecommunication Union COPANT/PASC April ITU and international standards collaboration Gary Fishman Chairman ITU Telecommunication.
Fostering worldwide interoperabilityGeneva, July 2009 GSC-14 Closing Plenary Summary Report Malcolm Johnson, GSC-14 Chair Global Standards Collaboration.
Status report on CJK NGN Working Group April 9, th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group.
Update on ESCAP Work on Trade Facilitation and implementation of the ROC-TF mechanism Regional Organizations Cooperation Mechanism for Trade Facilitation.
OneM2M Partnership Project. Contents Introduction Founding Partners Participation Scope & Objectives Structure Deliverables Contacts © 2013 oneM2M Partners.
GSC IMT Task Force Report Kohei SATOH ARIB DOCUMENT #:GSC13-PLEN-64r1 FOR:Presentation SOURCE:Kohei Satoh (ARIB) AGENDA ITEM:GRSC (7); Plenary (6.1) CONTACT(S):Kohei.
Jeju, 13 – 16 May 2013Standards for Shared ICT GSC Emergency Communications Task Force Report (GSC-EM TF) Presenter: Chantal Bonardi GSC-EM Task Force.
GSC-16 Closing Plenary Summary Report
GSC Emergency Communications Task Force Report (GSC-EM TF)
Introduction: What is critical communication?
GSC-14 Closing Plenary Summary Report
Report from Session #2: SDN/NFV
ISACC Activities Since GSC-16
GSC-EM TF goal, as defined initially
Plan of ITS TF Activity Takeshi Yamamoto, ARIB Document No:
ETSI Standardization Activities on M2M communications
Glenn Parsons, GTSC-9 Chair, ISACC
Presenter: Luis Jorge Romero oneM2M Steering Committee Chairman
GSC Emergency Communications Task Force Report (GSC-EM TF)
Report from STRATEGIC Session #3, Critical communication
Emergency Communications
Discussion on engaging with other partners
Emergency Communications
GSC-16 Closing Plenary Summary Report
Emergency Communications - Summary
Attendance GSC-19: 92 delegates
Critical Communications* Dr. Farrokh Khatibi (ATIS)
GLOBAL ict standardisation forum for india (Gisfi)
ISACC Activities Since GSC-16
Global Standards Collaboration (GSC) GSC-15
Update of ARIB Activities on IMT Standardization
ITU and international standards collaboration
Plan of ITS TF Activity Takeshi Yamamoto, ARIB Document No: GSC-21_020
GSC Emergency Communications Task Force Report (GSC-EM TF)
Report from Session #2: SDN/NFV
Status report from ITU-R WP 5A on ITS activities
ITS Task Force Report Takeshi YAMAMOTO ARIB GSC17-PLEN-82r2
Plan of ITS TF Activity Takeshi Yamamoto, ARIB Document No:
Activities of ARIB on IMT Standards
GSC IMT Task Force Report
GSC-13 Opening/Plenary Summary Report
GSC-13 Opening/Plenary Summary Report
Glenn Parsons, GTSC-9 Chair, ISACC
NGN Summary Contributions from ETSI (GTSC9-05) and ATIS (GTSC9-09):
Report of GSC-12 Opening Plenary
Presentation transcript:

GSC EMERGENCY COMMUNICATIONS TASK FORCE REPORT (GSC-EM TF) Chantal Bonardi, GSC-EM Task Force Convenor GSC-18 Meeting, July 2014, Sophia Antipolis, France Document No: GSC(14)18_003r1 Source: GSC-EM Task Force Convenor Contact: Chantal Bonardi Agenda Item: 7.2

GSC-EM TF GOAL, AS DEFINED INITIALLY GSC-18, July 2014, Sophia Antipolis Goal: discover and document a coordinated approach on how to provide emergency communications before, during and after a significant disaster Expected outcome of the GSC-EM TF: Identify commonalities, gaps and possible overlaps of standards in each region Catalogue of what exists in each region and what may exist tomorrow on a global scale Collect regulatory requirements Broad scope: Public Safety was considered in the report, and not only Emergency calls Results of the Task Force study: report (word version) to be delivered at GSC#17 Based on the “word” report, make suggestions to the GSC for harmonization 2

FIRST PHASE: ORGANIZATION AND ACHIEVEMENTS First phase: from GSC-EM TF start (early 2012) to GSC#17 (May 2013) All GSC SDOs participated: ARIB (Japan), ATIS (United States of America), CCSA (China), ETSI (Europe), ISACC (Canada), ITU (United Nations), TIA (United States of America), TTA (Korea) and TTC (Japan), Also input from India and on one topic from Australia, via GSC SDOs. Dedicated mailing list: 50 people subscribed (submitted by GSC SDOs). Monthly confcalls (from June 2012 to April 2013) Average of 9 participants/confcall, Aim of confcalls: discuss new input and update draft word report accordingly. GSC-EM TF word report delivered to GSC#17: publically available and widely distributed. GSC-EM TF word report GSC#17 agreed to continue the work of the Task Force until GSC#18, in order to complete the report, like covering all the regions and main countries. GSC-18, July 2014, Sophia Antipolis3

SECOND PHASE: ORGANIZATION Same organization as for the first Phase: Communication via the GSC-EM mailing list: still 50 people subscribed, Monthly confcalls (from September 2013 to June 2014): less participation. New contacts were provided by GSC SDOs, with the aim to get information from other countries and regions: New contacts from: Africa, Central America (i.e. Mexico), South America (i.e. Argentina, Brazil, Caribbean, Chile, Colombia, Peru, Venezuela), Arabic States (i.e. United Arab Emirates), Asia and Pacific (i.e. Australia, Indonesia, Israel, New Zealand, Philippines, Taiwan), Commonwealth of Independent States (i.e. Russia), These contacts were subscribed to the GSC-EM mailing list only if they were GSC SDO Members: very few were in this case, Non-GSC SDOs Members could not attend monthly confcalls on a regular basis: the majority of our contacts were in this case. A list of the regions/areas/countries the Task Force could cover was set up, with contacts details and status of the foreseen information delivery information. GSC-18, July 2014, Sophia Antipolis4

SECOND PHASE: SUCCESSES AND DIFFICULTIES What can be considered as a success? The GSC-EM Task Force got new appropriate contacts for new regions worldwide and for a lot of new countries, They are happy to be able to contribute Updated information was provided by all GSC SDOs, where relevant. What has been difficult? It took time to find appropriate contacts, despite great efforts It took time to make them understand what the Task Force was expecting from them, It generated a lot of work, as the majority of them could not be subscribed to the GSC-EM mailing list, It is a big effort for most of these new contacts to collect information and to be able to contribute on time. GSC-18, July 2014, Sophia Antipolis5

SECOND PHASE: ACHIEVEMENTS Information for new clauses has been provided for the following regions: Central America, with Mexico Arabic States, with United Arab Emirates Asia and Pacific, with Israel and Taiwan for Public Warning System For other regions (like Africa, South America or CIS) or countries, that were planned to be covered as well, the Task Force got appropriate and motivated contacts. But it has not been possible to collect information within the timeframe available Updates have been provided by all GSC SDOs to ensure the information is still accurate, and to fill in clauses that were empty in the first word report. An updated “word” report is delivered to GSC#18 (document GSC(14)18_004), that also includes updates in the Conclusions and Suggestions clauses. Changes in clauses 11 and 12 are indicated in blue in the further slides GSC-18, July 2014, Sophia Antipolis6

REMINDER ABOUT THE STRUCTURE OF THE GSC-EM TASK FORCE WORD REPORT The 4 scenarios "in case of emergency“ were considered. GSC SDOs’ regions were extended to other regions so now the report includes North America, Central America, Arabic States, Asia and Pacific, and some countries for each region; and Europe Global standards (like 3GPP and ITU standards) were also included. Regulatory aspects per country or region are also part of the word report. Ongoing standardization and regulation initiatives were also considered. Future possible standards were added. Conclusions and suggestions finalise the report. GSC-18, July 2014, Sophia Antipolis7

CONCLUSIONS OF THE GSC-EM TF WORD REPORT OF THE SECOND PHASE (1) Regulatory approach Different National regulations for emergency communications exist in each of the countries covered In some regions there is collaboration between countries for regulation Availability of a dedicated spectrum for Public Protection and Disaster Relief is rare In most countries this topic is under study, but not all Availability of standards 3 scenarios, in case of an emergency, are covered: alerting the individuals, alerting the authorities, communication between and among authorities: All countries/regions covered have implemented the main standardized systems, but are not necessarily the same A national or regional emergency mandated number exist (but is not the same worldwide) 4 th scenario “communications between individuals”: there are no standardized systems for this scenario. It is worth noting that for this type of communications, today, social medias play an important role. GSC-18, July 2014, Sophia Antipolis8

CONCLUSIONS OF THE GSC-EM TF WORD REPORT OF THE SECOND PHASE (2) Future standards Possible new technologies for public safety (such as Reconfigurable Radio Systems): under study at the moment, ITU-T Focus Group on Disaster Relief Systems, Network Resilience and Recovery has finalized its study in June 2014, This group has identified potential study areas for standardization that may lead to further work in ITU-T Study Groups, mainly SG2 and SG15, and so to possible global recommendations Recent technologies such as LTE have been mandated for public safety in some countries (like in U.S.A.). There is increased focus on LTE in many countries, even if not mandated. Standards cooperation Some initiatives of SDOs cooperation already exist such as 3GPP, MESA, CMAS (Canada and U.S.A.). Collaboration between countries or regions is very important. Collaboration between all SDOs (and not only GSC SDOs) seems essential for a coordinated approach. Considering the difficulty to get information from non-GSC SDOs’ countries or regions, it has to be studied what would be the best and more appropriate way. GSC-18, July 2014, Sophia Antipolis9

SUGGESTIONS OF THE GSC-EM TF WORD REPORT OF THE SECOND PHASE (1) Having the same system deployed everywhere in the world, for each kind of communication (such as alerting the individuals) could be an ideal solution But regulatory requirements are different from one country/region to another Will future technologies solve this issue, or will interoperable solutions between different systems have to be worked out? Encourage and enhance collaboration between SDOs worldwide, and see if harmonization of standards could be better developed Collaboration is already in place in some parts of the world where there are regional (or partly regional) approach (such as Europe and Canada/U.S.A.) SDOs have a very good opportunity to collaborate on new capabilities and new technologies for emergency communications and public safety GSC-18, July 2014, Sophia Antipolis10

SUGGESTIONS OF THE GSC-EM TF WORD REPORT OF THE SECOND PHASE (2) Encourage interoperable solutions The report provides a better knowledge of existing technologies/capabilities and gives an opportunity to work with SDOs worldwide to develop interoperable solutions where possible In order to facilitate interoperable solutions and reduce cost and time of deployment, public safety solutions should, whenever practical, be based on global commercial standards. SDOs are encouraged to consider public safety support when writing standards; and required standardization time and deployment cost. If the GSC would like the GSC-EM Task Force to continue its work, in order to complete the “word” report (mainly with new countries and regions), the Task Force would need more time and also recommendations on how to proceed with non-GSC SDOs. GSC-18, July 2014, Sophia Antipolis11

GSC#18 IS INVITED TO Note the interim conclusions and suggestions in slides 8 to 11. Encourage and enhance collaboration between SDOs worldwide, and see if harmonization of Standards could be better developed. Encourage interoperable solutions based on global commercial standards. Give more time and guidance to the GSC-EM Task Force to enable it to complete its “word” report (see document GSC(14)18_004). GSC-18, July 2014, Sophia Antipolis12

Special thanks to the participants of this Task Force who have provided the new contacts, and have worked hard to try to get information on time! Contact Details: GSC-18, July 2014, Sophia Antipolis13 Thank you!