SEESIM 14 UNCLASSIFIED 1 POA&M DatesTaskPOCStatus 25 Aug 13DRAFT EXSPEC DocumentOps GroupCompleted 24-27 Sep 13Exercise Specification Conference (ESC)AllCompleted.

Slides:



Advertisements
Similar presentations
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advertisements

Advanced Piloting Cruise Plot.
Fig , p Table 10-1, p. 271 Fig , p. 272.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
ZMQS ZMQS
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Duration CONSTRUCTION Opening Date EQUIP INSTALL. & TEST Incheon International Airport Control Tower Outcome Progress DESIGN & AWARD : AOR 36 MONTHS.
Richmond House, Liverpool (1) 26 th January 2004.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
ABC Technology Project
EU market situation for eggs and poultry Management Committee 20 October 2011.
1 Junior Infants Letter Sounds 2 c says /c/ as in cat c.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
VOORBLAD.
15. Oktober Oktober Oktober 2012.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
“Start-to-End” Simulations Imaging of Single Molecules at the European XFEL Igor Zagorodnov S2E Meeting DESY 10. February 2014.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
LO: Count up to 100 objects by grouping them and counting in 5s 10s and 2s. Mrs Criddle: Westfield Middle School.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Januar MDMDFSSMDMDFSSS
Week 1.
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
CpSc 3220 Designing a Database
Traktor- og motorlære Kapitel 1 1 Kopiering forbudt.
SEESIM 14 UNCLASSIFIED Exercise Specifications Conference (ESC) Sep 2013 Zagreb, Croatia Co-Chairs Technical Working Group (TWG) CPT Zoran Hemetek.
POA&M Dates Task POC Status 25 Aug 13 DRAFT EXSPEC Document Ops Group
SEESIM 14 UNCLASSIFIED 1 Operational Working Group Exercise Specifications Conference (ESC) 23rd – 27th September 2013 Zagreb, Croatia Co-Chairs LTC Ana.
SEESIM 14 UNCLASSIFIED Main Planning Conference (MPC) Apr 2014 Zagreb, Croatia Co-Chairs Technical Working Group (TWG) CPT Zoran Hemetek COL Krasimir.
Technical Working Group (TWG)
SEESIM 14 Timeline Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Presentation transcript:

SEESIM 14 UNCLASSIFIED 1 POA&M DatesTaskPOCStatus 25 Aug 13DRAFT EXSPEC DocumentOps GroupCompleted Sep 13Exercise Specification Conference (ESC)AllCompleted 15 Dec 13Install JEMM server in CroatiaHN 15 Dec 13Create JEMM accountsHN 21 Dec 13Updated EXSPEC DocumentOps Group 17 Jan 14Identify billets in Manning DocumentAll Jan 14Initial Planning Conference (IPC)All Jan 14MEL/MIL Development WorkshopOps Group 23 Mar14Develop Scenario (Road to Crisis)Ops Group 1-4 Apr 14Main Planning Conference (MPC)All 2-3 Apr 14MEL/MIL Development WorkshopOps Group 26 Apr 14DRAFT Exercise Control PlanOps Group 26 Apr 14DRAFT Exercise Manning DocumentAll 26 Apr 14DRAFT EXCON Training PlanOps Group

SEESIM 14 UNCLASSIFIED 2 POA&M (cont.) DatesTaskPOCStatus 26 Apr 14DRAFT EXCON Architecture, Floor PlansOps Group 26 May 14Final Information Management (IM) PlanInfo Manager 3 Jun14Identify names for Manning DocumentAll 3-5 Jun 14Final Coordination Conference (FCC)All 3-5 Jun 14Technical Training in CroatiaTech Group 15 Jun 14Updated Exercise Manning DocumentAll 15 Jun 14Final Exercise Control PlanOps Group 15 Jun 14Updated EXCON Training PlanOps Group 15 Jun 14Final EXCON Architecture, Floor PlansOps Group 15 Jun 14Final EXSPEC DocumentOps Group 1 Sep 14Comms “Hot” to All SitesTech Group Aug 14Equipment Installation in CroatiaTech Group 8-12 Sep 14Remote Site Installations and TestingTech Group Sep 14Site Manager and AAR Training in CroatiaSM / AAR

SEESIM 14 UNCLASSIFIED 3 POA&M (cont.) DatesTaskPOCStatus 15 Sep 14Final Collection Management Plan (CMP)AAR Sep 14Final Setup and TestingTech Group Sep 14End-to-End TestTech Group Sep 14JTLS TrainingTech Group 22 Sep 14EXCON MINIEXAll 22 Sep 14EXCON Main TrainingAll Sep 14Exercise ExecutionAll 26 Sep 14Distinguished Visitor (DV) DayAll 26 Sep 14Post Exercise HotwashAll 26 Sep 14After Action Review (AAR)AAR 26 Sep 14Closing CeremonyAll 12 Oct 14First Impressions Report (FIR)AAR 26 Dec14Final Exercise Report (FER)AAR