Session 5: Dredging in sensitve areas

Slides:



Advertisements
Similar presentations
SiTPC status in Saclay David Attié SiTPC Phone Meeting,
Advertisements

INSTITUTE FOR CYBER SECURITY April Access Control and Semantic Web Technologies Ravi Sandhu Executive Director and Endowed Chair Institute for Cyber.
GL10 – December 8-9, Grey literature in French digital repositories: a survey J. Schöpfel (University of Lille 3) C. Stock (INIST-CNRS)
Financial and Grants Management Institute - March 18-20, Federal Grants Management for Fiscal Staff.
Financial and Grants Management Institute - March 18-20, Developing and Managing Your Budget.
Paris Clubs role in the financing of development March Paris Clubs role in the financing of development Thomas Courbe – Secretary General of the.
Status of Dermo Disease in Matagorda Bay Oysters (July 2006) Sammy M. Ray URS Corporation Meeting.
May Expansion of Clinical Trial Registration and Results Reporting Requirements Deborah A. Zarin, M.D. ClinicalTrials.gov National Library of Medicine.
Experiences from Romania Water Safety Plans in schools Geneva 13/14 September Geneva 13/14 September Good Practices in Water, Sanitation.
2 nd Annual Dredged Material Management Summit Minimizing Sedimentation In Harbors and Marinas 6 October, 2005 Minimization Of Sedimentation In Harbors.
Masterclass Introduction to hands-on Exercise Aim of the exercise Find out what happens in proton-proton collisions at the LHC as seen by the ATLAS.
Masterclass Introduction to hands-on Exercise Aim of the exercise Identify electrons, muons, neutrinos in the ATLAS detector Types of Events (particles.
10th Fiesole Collection Development Retreat March The UK Research Reserve: from concept to realisation Clare Jenkins.
The versatile solution for efficient dredging and water construction.
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
EMS Checklist (ISO model)
Turbulent mixing in shallow water basins; parameterization of vertical turbulent exchange coefficient 19 th Congress of Mechanics 26 th August 2009 A.I.Sukhinov,
10/04/20081 TWG of ESF Committee 10 April 2008 Franck Sébert Head of unit DG EMPL/I/1 Relations with Control Authorities Action plan to strengthen the.
Rule September The following presentation is for educational purposes only and is not a substitute for the statute and Division rules.
EPI809/Spring Chapter 10 Hypothesis testing: Categorical Data Analysis.
Determination of Forward and Futures Prices Chapter 5 Options, Futures, and Other Derivatives, 7th Edition, Copyright © John C. Hull
1 Dredging Phases 4 phases –excavation –lifting –transportation –disposal Guide 4: Machines, Methods and Mitigation; Chapter 2: Phases of a Dredging Project;
Martin Wolpers & Erik Duval 7 Dezember  Today – LAST LECTURE!  Student presentations  Wrap-up  Oral examens  Feedback  About the course 
April 18, iContent Document Management StudentHRPAYFinance Other.
Environmental Aspects of Natural Gas Mid-stream Operations (an overview) June 2004 Presentation by Bruce Kosugi OGC SCEK Fund Workshop June 10, 2004.
Warschauer, M. (2002). A developmental perspective on technology in language education. TESOL Quarterly, 36(3) ELTAM A Developmental Perspective.
Patterns and Algebra in Stages 3 and 4 Judy Anderson The University of Sydney AIS Conference 2008.
OPEN AND DISTANCE LEARNING TEACHER TRAINING PROGRAMME-MALAWI IMPACT EVALUATION DESIGN SHORT TERM STRATEGY FOR IMPROVING STUDENTS ’ LEARNING OUTCOMES THROUGH.
Interplay of the ADA, FMLA, and Workers’ Compensation Training for Supervisors •
UMR = Balance of Environment and Transportation 1. Pool # 8 - Environmental Management Project 2. Transportation Route – human habitation & settlement.
$1 Million $500,000 $250,000 $125,000 $64,000 $32,000 $16,000 $8,000 $4,000 $2,000 $1,000 $500 $300 $200 $100 Welcome.
Competitive Intelligence – It’s Not Just For Spies! March 10, 2008 Linda Rink President.
02/12/ a tutorial on Markov Chain Monte Carlo (MCMC) Dima Damen Maths Club December 2 nd 2008.
Regression and Correlation methods
Earth Control Measures at Project Detail Site Location Marina Barrage.
TRD alignment with Muenster cosmics, D. Miskowiec, TRD status, 07-Jun TRD alignment with (German) cosmics Dariusz Miśkowiec (GSI), Eva Sicking (Uni.
St Petersburg - ICTP Third International Conference on Teaching of Psychology (ICTP-2008). St.-Petersburg Psychological Society, St-Petersburg State.
Modular – Flexible – Networked
UK Higher Education library statistics The role of SCONUL.
IMPROVING ESTIMATES OF SUSPENDED SEDIMENT CONCENTRATION AND FLUX IN THE LITTLE BEAR RIVER Brant Whiting, Jeffery S. Horsburgh and Amber S. Jones Utah Water.
Marine Construction SCM 330 Tyler Mason Pratt Tyler Mason Pratt
Landfill Water Quality Project Paul Brooks, Lea Bullard, Leslie Harper, Amanda Strickland, Sarah van Schagen April 30, 2004 University of North Carolina.
DREDGING YOUR DOCKS 2013 Supported by: USACE Galveston District U. S. Coast Guard Sabine Neches Navigation District.
Ross By-Pass Tunnel Cleanup Pre-Bid Project Overview May 2014
Fox River Cleanup Operable Units Fox River Cleanup Total river 39 miles long, OU 2 – 5 is about 13 miles PCB contamination Combined Remedy: Prospective.
Environment Engineering I
Lake Whetstone Sediment Removal by Hydraulic Dredging
CEDA DREDGING DAYS 2008 ANTWERP DEBATE ON LENGTHY, COMPLEX and SUSPICIOUS DECISION-TAKING PROCESS IN DREDGING and RECLAMATION PROCESSES THE POINT OF VIEW.
CEDA Dredging Days Antwerp Steps towards the development of green dredging technology 3 October 2008 Henk van Muijen MTI Holland BV.
The situation in Norway concerning sediments/dredging Tore Lundestad, Port of Borg, Norway.
Prepared for: Prepared by: A Tutorial for Identifying a Project-Specific Dredged Material Placement Site October 2012 Bill Goodfellow Kaitlin McCormick.
PIANC Dredging 2012 Conference Castro Cove Sediment Remediation Project, Richmond, California Ian Austin PhD PE - URS Corporation Paul Ryan – Chevron Environmental.
Former Point Cook Fire Training Area Contamination Remediation Works Project Community Information Session 26 September 2013.
Water Pollution Monitoring
S. 1 Pilot study 2: Assessment of sediment traps.
Water Analysis & Control. Water analysis & control WATSAN M15 ERU 2 Contents 1.Chemical parameters and ranges 2.Water sources: Sampling procedures 3.Laboratory.
Potential Impacts of a Seawater Intake Structure and a Brine Disposal System for the Proposed Desalination Plant at Mile 6, Swakopmund Marine Ecological.
EU Project: Trans-Boundary River Management Phase II for the Kura River basin – Armenia, Georgia, Azerbaijan
Effect of dredging sequence on the efficiency of water injection dredger and trailing suction hopper dredger, a case study of the port of Calais Abbass.
US Army Corps of Engineers BUILDING STRONG ® Dredging with Turbidity Tests and the EPA in Green Bay Harbor Michael Staal, E.I.T. Civil Engineer U.S. Army.
Pine Mountain Lake Dredging Project Moffatt & Nichol Project Engineers Cooper Crane & Rigging, Inc. Contractor The Right Contractor Adaptability Communication.
PIANC MarCom Working Group 51 Report “Guidelines for Water Injection Dredging (WID)” Smits, J., Vandycke, S., van den Heuvel, M., Welp, T., Cranch, A.,
Everything Goes Somewhere: Tracking the Movement of Dredged Sediments in Port and Coastal Environments Using Dual Signature Sediment Tracers Kevin Black.
Same dredger, different location: Environmental impacts of dredging
Christopher R. Bennett Darejan Kapanadze The World Bank
Impact of Meteorological Events and Sand Excavation on Turbidity and Total Suspended Solids Levels of Imo River by Dr. Chinedu E. Ihejirika Department.
PIANC, Chair of WFD Navigation Task Group
How Do You Know an Ecosystem is Healthy?
Presentation transcript:

Session 5: Dredging in sensitve areas CEDA dredging days – October 2008 Session 5: Dredging in sensitve areas Date: 2 Oct 2008 Time: 10:50 – 11:10 Author: Jeroen Gheysens CEDA dredging days Oct 2008 1

Overview Main project information Dredging in sensitive areas Environmental monitoring Dredging of contaminated materials Reclamation area layout CEDA dredging days Oct 2008 2 2

Geographical Location SÃO PAULO RIO DE JANEIRO BRAZIL Reclamation Area Dredging Area SEPETIBA BAY CEDA dredging days Oct 2008 3

General Info on Project CLIENT: ThyssenKrupp CSA Companhia Siderúrgica CONTRACTOR: Consorcium Dredging International nv – Boskalis International bv EXECUTION PERIOD September 2006 – April 2008 CEDA dredging days Oct 2008 4

Access Channel Harbour Basin Length 4,3km Bottom width 128m RECLAMATION AREA Access Channel Length 4,3km Bottom width 128m Dredging depth -14,5m CD Volume 6.600.000 m³ Harbour Basin Turning circle 250m Volume 4.500.000 m³ DREDGING AREA CEDA dredging days Oct 2008 5

Large Cutter Suction Dredger (CSD) Boosters Cosel: 5.500 kW DI 509: 4.475 kW Nieuwe Merwede: 2.984 kW Large Cutter Suction Dredger (CSD) Vlaanderen XIX: 8.358 kW CEDA dredging days Oct 2008 6 6

Confined Disposal Facilities CDF 1 135.000 m³ CDF 2 141.000 m³ Contaminated Material Volume 131.000 m³ Capping Material Volume 54.000 m³ CEDA dredging days Oct 2008 7

Environmental CSD Beaver St. Lawrence Cutter Power: 171 kW Pump Power: 839 kW CEDA dredging days Oct 2008 8 8

Overview Main project information Dredging in sensitive areas Environmental monitoring Dredging of contaminated materials Reclamation area layout CEDA dredging days Oct 2008 9 9

Dredging in sensitive areas Sepetiba Bay: historical contamination, mainly heavy metals – Mangroves - Fishery Environmental effects Spreading and settlement of resuspended solids Impact on soil organisms during operation Alteration of bathymetry Changing shoreline configuration MINIMISE THE ENVIRONMENTAL EFFECTS! CEDA dredging days Oct 2008 10

Dredging in sensitive areas Minimise the environmental effects Understand the environmental situation and identify the most sensitive areas Selection of dredging equipment Identification of environmental impacts Selecting the most appropriate working method Well trained, experienced and environmental aware crew Environmental management and monitoring plan CEDA dredging days Oct 2008 11 11

Overview Main project information Dredging in sensitive areas Environmental monitoring Dredging of contaminated materials Reclamation area layout CEDA dredging days Oct 2008 12 12

Environmental Monitoring Water quality monitoring Suspended solids dewatering < 500mg/l Capping of CDF’s Capping layer of 1m with ‘no contamination’ Noise level monitoring < 65dB (background level) CEDA dredging days Oct 2008 13 13

Environmental Monitoring Baseline monitoring Identification of the situation before the start of the works Relationship turbidity – suspended solids Background monitoring Weekly basis (background locations) Identify turbidity from other sources River discharges Heavy rainfall Seasonal fluctuations CEDA dredging days Oct 2008 14 14

Environmental Monitoring Water quality monitoring Daily measurements at fixed locations Turbidity (~ Suspended Solids) Water temperature Salinity Instrument Depth DREDGING AREA RECLAMATION AREA CEDA dredging days Oct 2008 15 15

Fixed points in the river São Francisco TSS (mg/l) = 1,14 NTU CEDA dredging days Oct 2008 16 16

Fixed points in the Sepetiba Bay TSS (mg/l) = 2,74 NTU CEDA dredging days Oct 2008 17 17

Points around the dredger TSS (mg/l) = 2,74 NTU CEDA dredging days Oct 2008 18 18

Overview Main project information Dredging in sensitive areas Environmental monitoring Dredging of contaminated materials Reclamation area layout CEDA dredging days Oct 2008 19 19

Confined Disposal Facilities CDF 1 135.000 m³ CDF 2 141.000 m³ Contaminated Material Volume 131.000 m³ Capping Material Volume 54.000 m³ CEDA dredging days Oct 2008 20

Dredging of contaminated materials Minimise spillage, turbidity and turbulence Minimise storage by high concentration dredging Minimise noise and unpleasant smells Optimise precision for accurate and selective thin layer dredging CEDA dredging days Oct 2008 21 21

Dredging of contaminated materials Environmental Sweep Dredger vs Environmental Disc Cutter CEDA dredging days Oct 2008 22 22

Overview Main project information Dredging in sensitive areas Environmental monitoring Dredging of contaminated materials Reclamation area layout CEDA dredging days Oct 2008 23 23

Reclamation area layout Mangroves (high environmental sensitive area) Protect from salt water of the dredging process Risk of bund wall failures (Monitoring!) Reduce suspended solids dewatering Maximise travel distance of water on the area Weir boxes (managing water levels on the area) Monitoring! CEDA dredging days Oct 2008 24 24

CEDA dredging days Oct 2008 25 25