30 Min Culvert Design Jered Carpenter Region 3 Roadway Design.

Slides:



Advertisements
Similar presentations
Números.
Advertisements

C) between 18 and 27. D) between 27 and 50.
Lecture 8: Design of Erodible Channels
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Chapter 3: Steady uniform flow in open channels
Fill in missing numbers or operations
1
EuroCondens SGB E.
& dding ubtracting ractions.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Cross-drainage systems: Culverts Gupta, Chapter 14, pp
Addition and Subtraction Equations
1 When you see… Find the zeros You think…. 2 To find the zeros...
CALENDAR.
Who Wants To Be A Millionaire? Decimal Edition Question 1.
Welcome to Who Wants to be a Millionaire
VII. 1 VII. Effects Of Transportation Structures On Fluvial Systems A.Riverine Systems 1.Analytical Tools to Evaluate Impacts 2.Single Channel 3.Braided.
Solve Multi-step Equations
Break Time Remaining 10:00.
The basics for simulations
PP Test Review Sections 6-1 to 6-6
MM4A6c: Apply the law of sines and the law of cosines.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Progressive Aerobic Cardiovascular Endurance Run
Chapter 1: Expressions, Equations, & Inequalities
Do Now 3/3/10  Take out HW from last night. Text p. 578, #4-48 multiples of 4  Copy HW in your planner. Text p. 586, #4-52 multiples of 4  In your notebook,
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
When you see… Find the zeros You think….
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
Slide R - 1 Copyright © 2009 Pearson Education, Inc. Publishing as Pearson Prentice Hall Active Learning Lecture Slides For use with Classroom Response.
Foundation Stage Results CLL (6 or above) 79% 73.5%79.4%86.5% M (6 or above) 91%99%97%99% PSE (6 or above) 96%84%100%91.2%97.3% CLL.
Subtraction: Adding UP
Static Equilibrium; Elasticity and Fracture
Essential Cell Biology
Clock will move after 1 minute
PSSA Preparation.
Lial/Hungerford/Holcomb/Mullins: Mathematics with Applications 11e Finite Mathematics with Applications 11e Copyright ©2015 Pearson Education, Inc. All.
Physics for Scientists & Engineers, 3rd Edition
Select a time to count down from the clock above
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
1 CTC 261 Hydraulics Storm Drainage Systems. 2 Objectives Know the factors associated with storm drainage systems.
Crossing Structures Crossing structures are those constructed at intersections of: 1. Waterway-road (culvert or bridge). 2. Waterway-Waterway (syphon or.
CE 515 Railroad Engineering
Design of Hydraulic Controls & Structures
Culvert Hydraulics using the Culvert Design Form
CE154 Hydraulic Design Lectures 8-9
Design of Open Channels and Culverts CE453 Lecture 26
Design of Culverts. Culvert Design - Basics Top of culvert not used as pavement surface (unlike bridge), usually less than 7 m.
Design of Open Channels and Culverts
1 Time of Concentration. 2 Objectives Know how to calculate time of concentration Know how to calculate time of concentration Know why it’s important.
CTC 261 Hydraulics Culvert Design Form
Surface Drainage CE 453 Lecture 25.
The Islamic University of Gaza Faculty of Engineering Civil Engineering Department Hydraulics - ECIV 3322 Chapter 6 Open Channel.
CTC 261 Culvert Basics.
Basic Hydraulics: Culverts – I
Basic Hydraulics: Channels Analysis and design – I
CE 3372 Water Systems Design Lecture 18: Storm sewers, inlets, conduits and related hydrology and hydraulics.
Basic Hydrology & Hydraulics: DES 601
Basic Hydrology & Hydraulics: DES 601
CE 3372 Water Systems Design
Basic Hydrology & Hydraulics: DES 601
Jered Carpenter Region 3 Roadway Design
CTC 261 Hydraulics Culvert Design Form
Culvert Hydraulics using the Culvert Design Form
Presentation transcript:

30 Min Culvert Design Jered Carpenter Region 3 Roadway Design

Design Steps Step 1) Gather hydrological & site specific data Step 1) Gather hydrological & site specific data Step 2)Assume culvert size Step 2)Assume culvert size Step 3)Find headwater depth for trial size Step 3)Find headwater depth for trial size Step 4)Try another size Step 4)Try another size Step 5)Compute outlet velocity Step 5)Compute outlet velocity Step 6)Determine Invert Protection Step 6)Determine Invert Protection Step 7)Document selection Step 7)Document selection

Del Rio Example

Pictures of Existing Culvert Pictures of Existing Culvert

Step 1) Gather Hydrological Data Q = cia = (.35*52*.82) = 14.9 cfs Culvert Location

Step 1 Cont.) Site Specific Data Invert In El. = 564.9’ Invert In El. = 564.9’ Invert Out El. = 564.5’ Invert Out El. = 564.5’ Pipe Length = 75’ Pipe Length = 75’ Slope = -0.5% Slope = -0.5%

Step 1 Cont.) Site Specific Data Calculate Tail Water, TW Calculate Tail Water, TW 2.5’ btm, class 50 rip-rap lined FBD with 2:1 side outlet Manning’s Equation for discharge Q = (1.486/n)*A*R 2/3 S 1/2 Using a spreadsheet & setting Q as a function of depth, I get the following results when d=1.7 ft: 15.0 cfs = (1.486/0.07)*10.03ft 2 *0.99ft 2/ /2 TW = 1.7’ TW = 1.7’

Key #15186 – Del Rio“DR” 92+15Jered Carpenter11 Feb 081 of 1 Rational 52 Ac -0.5% Trapezoid

Step 2) Assume Culvert Size Start With 18” Circular CMP

Step 3) Find HW Depth For Trial Size Assume inlet control Assume inlet control From Nomograph,From Nomograph, HW/D = 3 HW/D = 3 HW depth w/ inlet control HW depth w/ inlet control approx ft., which approx ft., which is too high I’ll try a 24” pipe I’ll try a 24” pipe

Step 3) Find HW Depth For Trial Size Assume inlet control Assume inlet control From Nomograph,From Nomograph, HW/D = 1.2 HW/D = 1.2 HW depth w/ inlet control HW depth w/ inlet control approx ft., which approx ft., which is OK. The 24” pipe looks The 24” pipe looks good so far

Key #15186 – Del Rio“DR” 92+15Jered Carpenter11 Feb 081 of 1 Rational 52 Ac -0.5% Trapezoid CMP-Circ.-18”-Mitered CMP-Circ.-24”-Mitered

Step 3 Continued  Need to calculate H, total outlet control head loss  Outlet control nomographs can be used if outlet crown is submerged. (TW>Top of Outlet) < 2’, so I will not use the nomograph < 2’, so I will not use the nomograph Check for outlet control

Step 3 Continued Alternatively, H can be calculated by following the steps on the culvert design sheet Alternatively, H can be calculated by following the steps on the culvert design sheet Calculate critical depth, d cCalculate critical depth, d c Critical depth = 1.4’ (from graph located in Chapter 8, appendix B)Critical depth = 1.4’ (from graph located in Chapter 8, appendix B)

Step 3 Continued Following Steps 4 thru 5 on the culvert design sheet: Following Steps 4 thru 5 on the culvert design sheet: (d c +D)/2 = (1.4’+2’)/2 = 1.7’(d c +D)/2 = (1.4’+2’)/2 = 1.7’ h o = TW or (d c +D)/2, whichever is greaterh o = TW or (d c +D)/2, whichever is greater 1.7’ = (d c 1.7’,use 1.7’

Key #15186 – Del Rio“DR” 92+15Jered Carpenter11 Feb 081 of 1 Rational 52 Ac -0.5% Trapezoid CMP-Circ.-24”-Mitered CMP-Circ.-18”-Mitered

Step 3 Continued Calculate Energy losses, H for the culvert From the culvert design sheet: Calculate Energy losses, H for the culvert From the culvert design sheet: H = (1+k e +(29*n 2 *L/R 1.33 ))*(V 2 /2g)H = (1+k e +(29*n 2 *L/R 1.33 ))*(V 2 /2g) K e =.7 (from table 9-3, mitered to slope) K e =.7 (from table 9-3, mitered to slope) n =.024 (from table 8-A-2) L = 75’ Use values of V and R under full flow (d=2’) R = 0.5’ V = 4.74 ft/s (Average Velocity) H = 1.52H = 1.52

Step 3) Continued Inlet Control HW Elevation = 567.3’ Inlet Control HW Elevation = 567.3’ Outlet Control HW Elevation = 567.9’ Outlet Control HW Elevation = 567.9’ The pipe flowing under outlet control. The pipe flowing under outlet control.

Step 4) Try Another Size 24” pipe is acceptable. 24” pipe is acceptable. Remainder of the Culvert design sheet is completed. Remainder of the Culvert design sheet is completed.

Step 5) Compute Outlet Velocity Previously calculated value. Determine if channel protection is required following the guidance in Chapter 11 of the hydraulics manual. Previously calculated value. Determine if channel protection is required following the guidance in Chapter 11 of the hydraulics manual. Step 6) Determine Invert Protection Follow guidance in Chapter 5 of the hydraulics manual to determine if & what type of invert protection is required. Follow guidance in Chapter 5 of the hydraulics manual to determine if & what type of invert protection is required.

Key #15186 – Del Rio“DR” 92+15Jered Carpenter11 Feb 081 of 1 Rational 52 Ac -0.5% Trapezoid CMP-Circ.-24”-Mitered CMP-Circ.-18”-Mitered Outlet Control Trap. Channel: W=2.5’ 2:1 side slopes N=.07 (class 50 rip rap) S=0.5% Dc=1.7’ Metal Circ.24” Mitered0.024 Step 7) Document Selection