Thursday 28.10. ● 00h37: Stable beams. Fill #1450. ● 15h17: Beam dump by operations. Integrated: 6.4/6.2/5.2 pb-1 (ATLAS/CMA/LHCb). Length of fill: 14h40.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 116.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
0 - 0.
1 1  1 =.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt ShapesPatterns Counting Number.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 10 second questions Numbers and number system Numbers and the number system, fractions, decimals, proportion & probability.
Who Wants To Be A Millionaire?
Who Wants To Be A Millionaire? Decimal Edition Question 1.
Welcome to Who Wants to be a Millionaire
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
ZMQS ZMQS
$100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400.
Break Time Remaining 10:00.
This module: Telling the time
Tie me kangaroo down sport 10:30 Stable beams Fill 2739 Initial luminosity 6.48e33 cm-2s-1 13:00 Beams dumped (~50 pb -1 ) Off to Oz with: Atlas: 6.6/6.3.
Thursday 12 th April - morning Machine in access for a problem on the injection kickers… MKI2 problem – fuse - PFNs were properly charged but pulses were.
2 |SharePoint Saturday New York City
© S Haughton more than 3?
VOORBLAD.
15. Oktober Oktober Oktober 2012.
How to Find the Square Root of a Non-Perfect Square
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Squares and Square Root WALK. Solve each problem REVIEW:
We are learning how to read the 24 hour clock
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Addition 1’s to 20.
25 seconds left…...
Equal or Not. Equal or Not
Slippery Slope
Test B, 100 Subtraction Facts
: 3 00.
5 minutes.
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
A small truth to make life 100%
Clock will move after 1 minute
Partial Products. Category 1 1 x 3-digit problems.
A SMALL TRUTH TO MAKE LIFE 100%
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
Presentation transcript:

Thursday ● 00h37: Stable beams. Fill #1450. ● 15h17: Beam dump by operations. Integrated: 6.4/6.2/5.2 pb-1 (ATLAS/CMA/LHCb). Length of fill: 14h40. ● 15h25: Ramp down. Cycle. Change of monitor factor for 4 BLM’s not done before (0.3 -> 0.5). ● 16h45: Injection. ● 19h46: Start ramp. 368b. ● 20h12: Beam dump just at flat top. ALICE removed beam permit. ALICE BCM triggered.  UFINO ● 22h51: Injection. 8:30 meeting 1

Fill 1450: Up to 6.4 pb -1 Delivered 8:30 meeting 2

Dump B1 8:30 meeting 3

Fill 1451: UFINO IR2 8:30 meeting 4 ALICE BCM triggered See losses on BLM’s: Symmetric left and right of IR2 Developing over 5ms Factor 100 below dump threshold! ALICE BCM triggered See losses on BLM’s: Symmetric left and right of IR2 Developing over 5ms Factor 100 below dump threshold!

Fill 1451: UFINO IR2 8:30 meeting 5

Fill 1451: UFINO IR2 - Pressure 8:30 meeting 6

Friday ● 00h36: Start ramp. 368b. ● 01h27: Beam dump at 3.5 TeV. BLM trigger in Q4.L2 (UFO?). Losses start in injection kicker. ● 02h35: Injection. ● 03h15: Start ramp. 368b. ● 04h16: Stable beams. Fill #1453. Turn-around: 2h40. 8:30 meeting 7

Fill 1452: Beam Dump IR2 8:30 meeting 8

Fill 1452: Beam Dump IR2 8:30 meeting 9

Fill 1452: Beam Dump IR2 8:30 meeting 10

Fill 1452: Probably from MKI’s 8:30 meeting 11 

Pressure: Better with Low Intensity 8:30 meeting 12

Intensity Limit 150 ns 8:30 meeting e13 p (?)  To be followed… 312b 364b 424 b 364b

Ahead ● Got up to 47 pb -1 in ATLAS. ● Length scale calibration ALICE. Then dump around 9h30. ● Afterwards: Switch to 50 ns ● Tentative plan: See next slide. ● To be finalized after the meeting. 8:30 meeting 14

Draft Planning 8:30 meeting 15 Fri08h004hTransv. DamperW. Hoefle, D. Valuch 12h004hInj up to 72b if possible in time constraints/ RF B. Goddard et al, P. Baudrenghien, W. Hoefle, D. Valuch 16h002hreserve 18h008hTOTEM/RF/ALICEOP, TOTEM, E. Chapochnikova Sat02h006hMD 08h006hInj up to 72b per shot if possible in time constraints, RF, transv. damper, inject 100b with 50ns for ramp B. Goddard et al, P. Baudrenghien, D. Valuch 14h005hRamp 100b, stable beamOP, R. Steinhagen, M. Gasior, R. Jones, 19h0014hInject 200b with 50ns, ramp 200b, stable beam B. Goddard et al, OP, W. Herr, E. Metral, T. Pieloni, R. Steinhagen, M. Gasior, R. Jones Sun09h004hFill 300b, Beam-Beam MD 450 GeVOP, W. Herr, E. Metral, T. Pieloni, R. Steinhagen, M. Gasior, R. Jones, F. Roncarolo 13h006hRamp 300b, stable beamsOP 19h0013hFill 400b, ramp, stable beamsOP Mon08h00MD block starting, Injection setup for high intensity at 450 GeV, 72b injection, …