Curriculum Review LOG 340 “Performance Based Life Cycle Sustainment” Presented to the Life Cycle Logistics (LCL) Functional Integrated Product.

Slides:



Advertisements
Similar presentations
WELCOME BUDGET MANAGERS AND CHIEF FISCAL OFFICERS
Advertisements

Intel® Teach Program Essentials Course Day 4.
© Copyright 2006 FPT Software 1 © FPT SOFTWARE – TRAINING MATERIAL – Internal use 04e-BM/NS/HDCV/FSOFT v2/3 How to work in Fsoft project Authors: KienNT.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Joint ATS-WASC Accreditation Reviews Jerry McCarthy, ATS Teri Cannon, WASC.
NANPA Oversight Working Group Status Report to the NANC March 20, 2001 Chair Pat Caldwell.
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
NANPA Oversight Working Group Status Report to the NANC November 27, 2001 Chair Pat Caldwell.
Cultural Heritage in REGional NETworks REGNET. 4. July 2002REV02 Luxembourg – Management Issues 2 Management Issues January 2002 – June 2002 Reporting.
Aviation Security Training Module 4 Design and Conduct Exercise II 1.
Lisa Brown and Charles Thomas LAWNET 2002 Taking the Mystery Out of Project Management.
Fiscal Law Project Planning Session Results December 18, 2002.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
February, 2010 LEA Support Advisory Council. Agenda 2:30-3:00Discuss plan revision process (feedback and support) 3:00-3:30Discuss February workshops.
1 Phase III Secondary Schools Teacher Assistant Basics & Attendance Student Information Services Section April 2008.
Grants 3.0 Departmental Administrator Review January 22, 2014.
Guide to Compass Evaluations and
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Break Time Remaining 10:00.
6/26/ Virtual Town Hall Meeting June 26, 2013 Announcements & Updates to Policy Changes Karen Wong, Director Public Safety Communications Office.
Certified Lean Master The Best in Lean Supply Chain Training and Certification.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
NIMS Communications and Information Management IS-700.A – January 2009 Visual 4.1 NIMS Resource Management Unit 4.
Defense Acquisition University (DAU) Course Certification Requirement Changes for FY11 & FY12 (ao 17 June 2011)
Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting your organization’s logo –“View”
Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting your organization’s logo –“View”
We are learning how to read the 24 hour clock
NIMS Resource Management IS-700.A – January 2009 Visual 5.1 NIMS Resource Management Unit 5.
Slide 01 (of 22)Title 26/04/2010 Version 1.0 GUIDE to ‘SIMPLE’ Mouse click to continue AN OVERVIEW OF BT’s CONVEYACE INVOICE RECONCILIATION ASSISTANCE.
IAEA Training in Emergency Preparedness and Response Development of Simulation Exercise Work Session (Drill) Module WS-012.
25 seconds left…...
Week 1.
We will resume in: 25 Minutes.
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
LOG 340 Curriculum Review 13 Jan 2012 Curriculum Review LOG 340 Life Cycle Product Support Presented to the Life Cycle Logistics (LCL) Functional Integrated.
IT Curriculum Process and Products September 6, 2014 David Pearson Director, Engineering and Technology Center.
LOG 101 Curriculum Review 21 Oct 2011 Curriculum Review LOG 101 Acquisition Logistics Fundamentals Presented to the Life Cycle Logistics (LCL) Functional.
1 Life Cycle Logistics Knowledge Sharing Learning Assets 15 July 2011.
Enterprise Life Cycle Logistics Management (LOG350) Course Review Marty Sherman Center Director – Life Cycle Logistics LCL FIPT 14 Nov 08.
LOG 235 Curriculum Review 8 Oct 2010 Curriculum Review LOG 235 Performance Based Logistics Presented to the Life Cycle Logistics (LCL) Functional Integrated.
LOG 340 Curriculum Review 7 January, 2011 LOG 340 “Life Cycle Product Support” Presented to the Life Cycle Logistics (LCL) Functional Integrated Product.
LOG 235 Performance Based Logistics On the Move: Dr. Russell A. Vacante CDSC DAU 12 December/02 LOG 235.
LOG 101 Curriculum Review 16 Jul 04 Richard A. Andrews, CPL Course Manager.
Life Cycle Logistics FIPT Life Cycle Logistics Learning Asset Association for FIPT Approved High Priority Competencies 21 October 2011.
LOG 236 Curriculum Review 15 Jan 2010 Curriculum Review LOG 236 Performance Based Logistics Presented to the Life Cycle Logistics (LCL) Functional Integrated.
Life Cycle Logistics FIPT Agenda Introductions & Agenda– Bill Kobren0800 – 0810 Action Item Review – Tom Simcik0810 – 0820 Functional Advisor Comments.
Continuous Learning Module (CLM) Status Update Defense Acquisition University.
LOG 201 Curriculum Review 13 Jan 2012 Curriculum Review LOG 201 Acquisition Logistics Fundamentals Presented to the Life Cycle Logistics (LCL) Functional.
1 November 6, 2003 Systems Sustainment Management, Fundamentals LOG-102 John Baranowski Defense Acquisition University Program Director, Sustainment.
Planned ACQ101ACQ201 LOG101LOG201LOG304 On-line HybridClassroom Level I Level IILevel III LOG235 Acquisition Logistics Education Scheme.
LOG 101 Curriculum Review 16 Oct 2009 Curriculum Review LOG 101 Acquisition Logistics Fundamentals Presented to the Life Cycle Logistics (LCL) Functional.
Strategic Vision Life Cycle Logistics Functional IPT Mrs. Sue Dryden DASD(Materiel Readiness) January 13, 2012.
Defense Acquisition University LOG 204 Configuration Management Course Update Mr. Bill Kobren Program Director, Sustainment February 6, 2006.
Curriculum Review Product Support Assessment-Driven DAU Performance Based Logistics (PBL) Learning Asset Transition Roadmap Presented to the Life Cycle.
| 1 Weapon System Acquisition Reform- Product Support Assessment DAU SYMPOSIUM 13 April 2010 Presented by: Basil Gray Where Innovation.
1 Systems Engineering Initiatives 26 June 2007 Dr. Don Gelosh Sr. Systems Engineering Consultant OSD(AT&L)/SSE/ED.
LOG235/236 Performance Based Logistics Bruce Hatlem Logistics Functional IPT September 2007.
LOG 200 Curriculum Review 15 Apr 2011 Curriculum Review LOG 200 Intermediate Acquisition Logistics Presented to the Life Cycle Logistics (LCL) Functional.
LOG 101 Curriculum Review 28 Jun 02 Richard A. Andrews, CPL Course Manager.
FY12-14 Life Cycle Logistics DAWIA Certification Requirements Overview and Life Cycle Logistics Competency Validation Status Update Life Cycle Logistics.
LOG 235 Performance Based Logistics On the Move: Fielding Expected June 03 Dr. Russell A. Vacante CDSC DAU Thursday 24 October /02 LOG 235.
LOG FIPT October 16, 2009 DoD Product Support Assessment Team (PSAT) Implementation.
Integration of DTM “Reliability Planning, Analysis, Tracking and Reporting” into LOG 103 and other DAU Life Cycle Logistics Learning Assets.
Presentation transcript:

Curriculum Review LOG 340 “Performance Based Life Cycle Sustainment” Presented to the Life Cycle Logistics (LCL) Functional Integrated Product Team (FIPT) Presented by Dave Floyd, CPL Performance Learning Director Defense Acquisition University

Agenda Overview Status Update Schedule Issues and Concerns Alternatives Questions & Answers

Overview LOG 340 replaces LOG 236 (PBL) with a two-week , 300 Level Performance-Based Course Nine case studies over the 8 ½ day course Two full day exercises/workshops (LCSP, BCA) Leverages off of LOG 236 and 304 as a baseline and point of departure Responds to 5000.02, Next Generation Product Support Business Model and New DAG update Aligns with LOG 201, LOG 235 and LOG 350 Transitions from TLO/ELO construct to Competency/Proficiency construct Based on LCL, Supply, Maintenance and Deployment/Distribution/ Transportation competency sets Includes a simulation game IAW new policy emphasis Leverages CL Modules as prerequisites, read-aheads and homework Shifts from “Instructor-led” to “Instructor-facilitated”

Status LOG 340 Proposal submitted on 8 April, 2010 LOG 340 Task 4.2.5 Proposal submitted on 13 April, 2010 Life Cycle Logistics Guidebook (formerly the Acquisition Logistics Guide) Contract awarded in mid May Project Management Plan delivered 21 June, 2010 Project Management Plan approved 1 July, 2010 Issues with Instructor and Student Pilot dates Correlation of LOG 340 TLOs and ELOs to DoD Core Logistics Competencies and Proficiencies delivered 15 July, 2010 Comments submitted 21 July, 2010 Comments on LOG 340 Task 4.2.5 Proposal sent on 15 July, 2010 Award of LOG 340 Task 4.2.5 anticipated by end of July 2010

LOG 340 Development Schedule Task Number Task Title Deliverable PWS Section Reference Start Date End Date Task 3 Conduct Design Meeting and Develop Course Design Document Final Course Design Document 4.2 Course Design Document 08/23/10 09/06/10 Task 4 Develop Draft Course Materials Draft Course Materials 4.2.2 Task 2: LOG340 Course Development 09/07/10 11/24/10 Task 5 Conduct a Review and Provide Recommended Changes to the “Performance-Based Logistics: A Program Manager’s Product Support Guide” Recommended Changes to the “Performance-Based Logistics: A Program Manger’s Product Support Guide” 4.2.3 Performance Based Logistics: A Program Manager’s Product Support Guide” Review and Comment 11/18/10 12/06/10 Task 6 Conduct a Review and Provide Recommended Changes to the On-Line PBL Toolkit Recommended Changes to the On-Line PBL Toolkit 4.2.4 On-Line PBL Toolkit Review and Comment Task 7 Conduct Faculty Pilot Validation Plan 4.4 Faculty Pilot 12/07/10 12/17/10 Task 8 Support Student Pilot 4.5 Student Pilot 01/25/11 02/04/11 Task 9 Develop Final Course Materials Final Course Materials 02/07/11 02/18/11

Issues and Concerns LOG teaching requirements are expected to increase Growth in Acquisition workforce Increase in student throughput quotas from USAF and DLA Additional LOG courses to be deployed Insourcing DAU is not funded to hire more Life Cycle Logistics instructors DAU classroom capacity is reaching it’s peak LOG 340 is a two-week course that will replace a one-week course The additional week of training introduces risk of exceed instructor and classroom capacity Contingency planning is needed to address these issues and concerns

Week One Notional Course Outline

Week Two Notional Course Outline

New One Week Notional Course Outline Moved from first week of two-week LOG 340 course

Week One Course Lessons for Reapplication Consider Merging With LOG 350 Move to One-week LOG 340 Turn highlighted lessons into one-week course On Line Course, or Classroom Convert to individual CLMs Hold for future use