Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Scenario: EOT/EOT-R/COT Resident admitted March 10th Admitted for PT and OT following knee replacement for patient with CHF, COPD, shortness of breath.
AP STUDY SESSION 2.
1
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
We need a common denominator to add these fractions.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
Custom Services and Training Provider Details Chapter 4.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Break Time Remaining 10:00.
Turing Machines.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
1 The Blue Café by Chris Rea My world is miles of endless roads.
EU market situation for eggs and poultry Management Committee 20 October 2011.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
Bright Futures Guidelines Priorities and Screening Tables
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
Bellwork Do the following problem on a ½ sheet of paper and turn in.
CS 6143 COMPUTER ARCHITECTURE II SPRING 2014 ACM Principles and Practice of Parallel Programming, PPoPP, 2006 Panel Presentations Parallel Processing is.
2 |SharePoint Saturday New York City
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
Sample Service Screenshots Enterprise Cloud Service 11.3.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
1 TV Viewing Trends Rivière-du-Loup EM - Diary Updated Spring 2014.
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
SLP – Endless Possibilities What can SLP do for your school? Everything you need to know about SLP – past, present and future.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
Note to the teacher: Was 28. A. to B. you C. said D. on Note to the teacher: Make this slide correct answer be C and sound to be “said”. to said you on.
: 3 00.
Januar MDMDFSSMDMDFSSS
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Analyzing Genes and Genomes
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
1 Titre de la diapositive SDMO Industries – Training Département MICS KERYS 09- MICS KERYS – WEBSITE.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Weekly Attendance by Class w/e 6 th September 2013.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Presentation transcript:

Perspectives and Recommendations for the Natural Gas Industry 1 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations WRGC August 19, 2014

A Short Quiz The NTSB “10 Most Wanted List” is A.Candidates for the next NTSB Chairman B.Best restaurants in DC C.Board Advocacy Priorities 2

A Short Quiz The NTSB 2014 budget is A.$55 Million B.$87.5 Million C.$103 Million D.$137 Million 3

A Short Quiz The PHMSA 2014 budget is A.$45 Million B.$118.6 Million C.$210 Million D.$260.5 Million 4 Hazmat Division Pipeline Division 2014 budget Administration’s 2015 proposal

The NTSB Board Members August 2014 Hon. Christopher A. Hart Acting Chairman Hon. Robert L. Sumwalt Hon. Mark R. Rosekind Hon. Earl F. Weener 5

6 Natural Gas Pipeline Accidents Cleburne, Texas Sissonville, West Virginia Birmingham, Alabama Manhattan, New York

Enterprise Products Operating, Ltd Natural Gas Transmission Pipeline Rupture and Fire Cleburne, Texas June 7,

Accident Summary 36-inch diameter carbon steel 1050 psig MAOP 950 psig Operating pressure 3 rd Party damage 1 Fatality 6 Injuries 8

9

Improper pipeline locate work Two parallel pipelines – 30 feet apart November 2009 locate tickets for electric utility design phase − −Energy Transfer pipeline marked − −Enterprise pipeline not marked Only one pipeline on survey map 10

Improper pipeline locate work June 2010 locate tickets for construction − −Energy Transfer pipeline marked − −Enterprise pipeline not marked on three attempts to find the construction site Ticket closed – “all clear” 11

Improper pipeline locate work Second ticket issued three days later − −Locator and contractor presumed it was a duplicate of first Ticket closed – “all clear” Locator never surveyed the right-of-way on four visits 12

Improper pipeline locate work Accident date Marked Energy Transfer pipeline Mowed right-of-way Contractor moved dig marker to increase distance from the marked pipeline… 13

Improper pipeline locate work DIRECTLY ABOVE THE UNMARKED ENTERPRISE PIPELINE 14

15

16

The NTSB Probable Cause Contractor power auger punctured the unmarked buried pipeline Contributing factors − −No permanent pipeline markers − −Pipeline locator did not mark pipeline before excavation work 17

Closeout Actions Enterprise Products Ltd. improved the locate ticket procedure and technician training Final Accident Brief issued September 9, 2013 − −No recommendations issued 18

Columbia Gas Transmission Pipeline Rupture Sissonville, West Virginia December 11, :41 pm 19

20

Accident Summary 20-inch diameter carbon steel, inch wall thickness 1,000 psig MAOP 929 psig Operating pressure Installed 1967 “Not piggable” 21

22

23

Pipeline Integrity Management Three parallel, interconnected lines − −30-inch diameter in HCA − −26-inch diameter in HCA − −20-inch diameter (not in HCA) Interstate highway does not count 24

The NTSB Probable Cause External corrosion of the pipe wall − −deteriorated coating − −ineffective cathodic protection Corrosion not detected − −Not inspected or tested since

Contributing Cause Rocky backfill degraded corrosion protection Shutdown delay − −SCADA alarms and alerts configuration delayed controller response − −No automatic shutoff or remote control valves 26

Key Findings Automatic SCADA trend data alerts would improve recognition of system problems Line would have required integrity management had highway proximity to pipeline been included in HCA decisions 27

NTSB Recommendations Columbia Gas Transmission − −Implement a process for determining alarm and alert setpoints and response actions − −Provide system trend data and assign alarm function to critical trend variations 28

NTSB Recommendations PHMSA − −Add principal arterial roadways such as interstate highways to “identified sites” for HCA determination 29

Columbia Gas Corrective Actions Conducted inline inspections on the non-HCA 20-inch pipeline Performed close interval survey Reassessed the pipeline coating using AC and DC voltage gradient testing SCADA instrument upgrades on looped systems 30

Ongoing Investigations Birmingham, Alabama Manhattan, New York 31

Birmingham, Alabama Alagasco December 17, :30 am Cast iron distribution line (1951) 25 psig MAOP 19 psig operating 1 Fatality 4 injuries 32

33

34

Manhattan, New York (Harlem) Consolidated Edison March 12, :30 am 8-inch cast iron/plastic distribution line (1890 / 2011) 8 in wc MAOP, 6 in wc operating 8 Fatalities 48 injuries 35

36

37

38

Test Your Alertness - Just Before Lunch! My closing comment on the NTSB annual budget quiz was: It is Not Enough! 39

40 John B. Vorderbrueggen, PE Chief, Pipeline and Hazardous Materials Investigations