1 Jochem de Ruig 6 May 2009 / GM / Amsterdam Discussion on Charging Scheme 2010 Jochem de Ruig.

Slides:



Advertisements
Similar presentations
BrandZ top 100 most valuable global brands summary April 28 th May 2009.
Advertisements

Welcome to Who Wants to be a Millionaire
Axel Pawlik. 4 th ASO GA Meeting, 24 April 2003, Santiago. Open Policy Process in the RIPE Region Axel Pawlik RIPE NCC.
RIPE Network Coordination Centre Axel Pawlik LACNIC X, 22 May 2007, Isla Margarita IANA Policy for Allocation of ASN Blocks to RIRs.
Axel Pawlik. LACNIC IV, 25 April 2003, Santiago. 1 Update from the RIPE NCC.
Kuala Lumpur February 2004 APNIC 17 Kuala Lumpur February 2004 APNIC 17 IPv4 /8 Address Space Status.
Copyright © 2007 JPNIC All Rights Reserved. IPv4 Countdown Policy Proposal (LAC ) Toshiyuki Hosaka Working Group on the policy for IPv4 address.
Axel Pawlik. LACNIC VI, March 2004, Montevideo. An RIR in 2010 History, Continuity and Future presented by: Axel Pawlik.
1 Axel Pawlik LACNIC IX, May 2006, Guatemala RIPE NCC Update.
Internet Number Resource Status Report As of 30 September 2004.
Montevideo 31 DE MARZO 2004 LACNIC VI Prepared By NRO (APNIC, ARIN, LACNIC, RIPE NCC)
Axel Pawlik. LACNIC V, 19 November 2003, La Habana. 1 RIPE NCC Update.
The RIPE NCC Update Ingrid Wijte Registration Services Assistant Manager.
Current Policy Topics Emilio Madaio Policy Development Officer RIPE NCC RIPE May 2013, Dublin.
Measuring IPv6 Deployment Geoff Huston George Michaelson
Where are we with IPv6? Geoff Huston APNIC. The minister for communications and information technology does not believe that regulatory intervention is.
September 2009 Internet Number Resource Report. INTERNET NUMBER RESOURCE STATUS REPORT As of 30 September 2009 September 2009.
March 2010 Internet Number Resource Report. INTERNET NUMBER RESOURCE STATUS REPORT As of 31 March 2010 March 2010.
Internet Number Resource Status Report As of 31 March 2006.
Internet Number Resource Status Report As of 30 September 2006.
Internet Number Resource Status Report As of 31 December 2004.
Internet Number Resource Status Report As of 31 March 2005.
Internet Number Resource Status Report As of 31 December 2005.
Copyright (c) 2001 Japan Network Information Center Introducing Changes in JPNIC Structure Izumi Okutani IP Address Section Japan Network Information Center.
JPNIC IPv6 agent service APRICOT2000 Seoul, South Korea Masayoshi Toya JPNIC secretariat 2000/3/1 Copyright(C) Japan Network Information Center.
João Damas. APNIC Open Meeting, 27 October 2000, Amsterdam. RIPE NCC Status RIPE NCC Staff presented by: João Damas Head of External.
1 [prop-040] Proposal for APNIC non-member annual service fee Annual Member Meeting 8 Sep 2006 APNIC 22, Kaohsiung, Taiwan Save Vocea.
Axel Pawlik. APNIC 16, 22 August, Seoul. 1 RIPE NCC Update.
1 MyAPNIC Project update Database SIG APNIC 23, Bali 28 February 2007.
IPv6 Resource Management System Project Update Bangkok, 4 March 2002.
1 Axel Pawlik APNIC 21, 3 March 2006, Perth RIPE NCC Update APNIC 21.
ARIN IP Address Stewardship 3 February About ARIN Regional Internet Registry (RIR) – Established December 1997 by Internet community 100% community.
Policy Proposals: AfriNIC-10 Public Meeting Vincent Ngundi AfriNIC PDP-MG Chair AfriNIC-10, Cairo, Egypt.
APNIC Update AfriNIC 10 May2009. Overview APNIC 27 policy outcomes APNIC Members and Stakeholder Survey IPv6 Program Research and development activities.
RIPE Network Coordination Centre AfriNIC-10, 20 May 2009, Cairo Andrei Robachevsky 1 Update from the RIPE NCC.
Analysis of the impact of IPv4 transfer policies; Issues and solutions Dawit Bekele & John Schnizlein Internet Society AfriNIC-9 Mauritius.
The RIPE NCC Update Ingrid Wijte Registration Services Assistant Manager.
NRO report Adiel Akplogan Chairman (2009) NRO Executive Council.
ARIN Update Marc Crandall ARIN Advisory Council. Policy Discussions Last Call – Equitable IPv4 Run-Out When ARIN gets its last /8, instead of giving ISPs.
APNIC Update AfriNIC 11 November Overview Services status Policy developments Priority activities Next meetings.
Spearheading Internet technology and policy development in the African Region Resource Services Report.
RIPE Network Coordination Centre Afrinic-9, November 2008, Mauritius Filiz Yilmaz 1 Update from the RIPE NCC ArtistServer.com/Brillman.
Article 55 of Council Regulation (EC) No 1083/2006: Revenue-generating projects Impact of the revision 2010 Presented by Anton Schrag DG.
R I P E N e t w o r k C o o r d i n a t i o n C e n t r e. h t t p : / / w w w. r i p e. n e t. n c r i p e. n e t 1 The Internet Registry System IPv4.
Welcome to Who Wants to be a Millionaire
1 News from APNIC AfriNIC 9 27 November Coming up Some numbers Some service updates Some policy news 2.
.1 Conditional object incentives: more value for UK housing subsidies? Michael Oxley HSA York April
Huiswerkoplossings.  1) As x = -1 dan is y = -2(-1) – 8 = 2 – 8 = -6 As x = -2 dan is y = -2(-2) – 8 = 4 – 8 = -4 As x = -3 dan is y = -2(-3) – 8 = 6.
APNIC Update Paul Wilson Director General. Overview Priorities in 2009 IPv4 exhaustion IPv6 deployment Security Internet Governance Priorities in 2010.
Experience of operating.CL Patricio Poblete NIC Chile Kuala Lumpur, July 24, 2004.
Pressure = force area = 12 N 25 cm 2 = 0.48 N/cm 2.
10 Year Old Topic 2 9 Year Old Topic 4 8 Year Old Topic 5 8 Year Old Topic 6 7 Year Old Topic 7 7 Year Old Topic 8 6 Year Old Topic 9 6 Year Old Topic.
Are You Smarter Than a 5 th Grader? 1,000,000 5th Grade Topic 1 5th Grade Topic 2 4th Grade Topic 3 4th Grade Topic 4 3rd Grade Topic 5 3rd Grade Topic.
APNIC Executive Council (EC) Report APNIC 31 Hong Kong 25 February
APNIC Executive Council Report APNIC 27 Meeting Manila, Philippines 27 February 2009.
1 APNIC Status Report RIPE 50 Stockholm, Sweden. 2 Selected activities – Services IPv4 Allocations – accelerating –Single /8 allocation in Japan IPv6.
Nigel Titley. RIPE 54, 9 May 2007, Tallinn, Estonia. 1 RIPE NCC Certification Task Force Update Presented by Nigel Titley RIPE NCC.
Update about the “SHOULDs Analysing Project” in RIPE Policy Documents “Should” we use the RFC 2119 Defined Language in RIPE Policy Documents? Jan Žorž,
A Five Year Retrospective Charles Darnell & Gordon Rands Western Illinois University.
Another Presentation © All Rights Reserved.
1 Jochem de Ruig 28 May 2009 / UKNOF / Sheffield The Economic Crisis and effects on RIRs and RIR Registrations Jochem de Ruig Chief.
Mirjam Kühne 1 IPv6 Registration at the RIPE NCC IPv6 Forum, Berlin Mirjam Kühne, RIPE NCC.
IPv4 Final Distribution Business Processes Andrea Cima, RIPE NCC RIPE 64.
Treasurer Paul Andersen. Summary 2011 Draft Financial Results 2012 Q1 Unaudited Results Reserves Fees.
RIPE Network Coordination Centre APNIC 27, February 2009, Manila Mark Dranse 1 Update from the RIPE NCC ArtistServer.com/Brillman.
The RIPE NCC Update Axel Pawlik Managing Director.
RIPE NCC update and financial processes Jochem de Ruig – Chief Financial Officer.
Axel Pawlik. Regional Symposium on E-gov’t and IP, 24 November 2004, Dubai. Busting Internet Myths An Introduction to the RIPE NCC.
Discussion on Charging Scheme 2010 Jochem de Ruig
RIPE NCC Update APNIC 18 Axel is a pilot and this is an aerial view of Amsterdam.
Presentation transcript:

1 Jochem de Ruig 6 May 2009 / GM / Amsterdam Discussion on Charging Scheme 2010 Jochem de Ruig

May 2009 / GM / Amsterdam 2 Jochem de Ruig History – Reasoning for Charging Scheme Initially – Flat fee (self declared category) Change in Fee based on algorithm reflecting services rendered from the RIPE NCC Change in 2004 – Expansion of number of categories from 3 to 5 to better reflect different member size Over the years model changed moderately to reflect policy changes (Initial allocation, Direct Assignments) Direct assignments scored over time in 2004!

May 2009 / GM / Amsterdam 3 Jochem de Ruig Scenarios A.Current Charging Scheme B.Scenario with recurring Fee per individual Direct Assignment C.Scenario with recurring Fee for Direct Assignments Base for scenarios Membership and Resources numbers of mid April 2009 Service Fees remain the same as 2009

May 2009 / GM / Amsterdam 4 Jochem de Ruig A. Current Charging Scheme One fee for all RIPE NCC Services Five categories XS/S/M/L/XL A score determines what category a member has Score based on Internet Number Resources over time All Internet Number Resources are scored

May 2009 / GM / Amsterdam 5 Jochem de Ruig B. Scenario with Fee per Direct Assignments Separate fee for Direct Assignments Five categories XS/S/M/L/XL A score determines what category a member has Score based on PA IPv4 & PA IPv6 over time Direct Assignments have a recurring charge per assignment Scenario 1 – 50 EUR per DA and 2 – 100 EUR per DA

May 2009 / GM / Amsterdam 6 Jochem de Ruig C. Scenario with Fee per Direct Assignments Additional fee for Direct Assignments Five categories XS/S/M/L/XL A score determines what category a member has Score based on PA IPv4 & PA IPv6 over time Direct Assignments have a recurring charge for assignments based on a grouping No of DAFeeNo of DAFee , , ,000

May 2009 / GM / Amsterdam 7 Jochem de Ruig Scenario overview In million EURScenario AScenario B1Scenario B2Scenario C Revenue Additional Revenue Maximum fee in kEUR Top 10 fees in kEUR – 9.5 >50% Fee increase-3%6%2% In # >50% Fee increas

May 2009 / GM / Amsterdam 8 Jochem de Ruig Strategic & future considerations Or “Grand new charging scheme” Revise charging model more drastically to reflect current and possible future changes ….. For instance what is the impact of IPv4 depletion on the Charging Scheme? Will it still be a valid, fair system?

May 2009 / GM / Amsterdam 9 Jochem de Ruig Questions ? & Discussion