United States Department of Energy Value Engineering CONTRACTOR PERSPECTIVES Bruce Lenzer, CVSL, FSAVE Richard Harrington, CVSL, CH2MHill.

Slides:



Advertisements
Similar presentations
ACT Canada TDM Summit Halifax| October, 2008 Telework Pilot : The City of Calgary.
Advertisements

Significance of ISO to the Food Industry
Operations Management Maintenance and Reliability Chapter 17
LOGO Environmental Planning & Assessment Centre, Yonsei University Prof. Dr. Mu Choon Lee Sep EA master programs in Korea.
BULGARIA Resourcing the Judiciary for Performance & Accountability 2008 Judicial Public Expenditure & Institutional Review A Presentation of the World.
Threshold System Presented by Jan Stanley, State Title I Director Office of Assessment and Accountability Fall Title I Directors Conference October 23-25,
NERC Reliability Readiness The Next Steps Mitch Needham NERC Readiness Evaluator September 24, 2007.

BCs Drinking Water Action Plan Dr Shaun Peck Deputy Provincial Health Officer Ministry of Health Services.
Effective Contract Management Planning
Contract and Project Management: A Field Perspective Moderator Michael Peek, PE CCE CFM Office of Engineering and Construction Management.
Contract Fundamentals at Fresno State Doug Carey, Grants Administrator Office of Research and Sponsored Programs California State University, Fresno.
Tabular Format (TF!/SeeSOR) Lifecycle Approach to Services Procurement
Agenda Introduction Advisory Circular Changes Consultant Selection Procedures Contract Format and Provisions Methods of Contracting and Allowable Costs.
Federal Buildings Personnel Training Act of 2010
The Office of Information Technology ITA Meeting May 6, 2010 Harris Room (UC 2.212)
Inventory Control Panel Discussion Jamie Wheat, BFS/GA/Equipment Management Wednesday, March 26, 2014.
GenTax® Upgrade to Version 9
Value Engineering How DOT’s uses this valuable tool in project development What is it When is it used How do we use it.
Shared Services Canada Governance and Policy Frameworks at SSC January 25 th, 2013 ITIR – Procurement Benchmarks Advisory Committee.
Quality Assurance Update Presented byRay Hardwick Presented by: Ray Hardwick.
Bulk Petroleum Executive Agent Cynthia F. Smith PETRO May 30, 2012.
KEITH CANTANDO, CBCP CORPORATE SECURITY - PROGRAMS PROGRESS ENERGY PS-Prep (DHS – Voluntary Private Sector Preparedness Accreditation.
FISCAL YEAR Finance/IT Department Budget Presentation.
Sustainability (Green Building) Status and Reporting FIMS Real Estate Workshop June 2, 2009 Memphis, TN Thomas Traceski Director, Office of Environmental.
1 Developing EPA’s Peer Review Program Joint JIFSAN/SRA/RAC Symposium Dorothy E. Patton, Ph.D., J.D. September 30, 2003.
Department of Energy Quality Assurance Updates Frank Russo Deputy Assistant Secretary Office of Corporate Performance Assessment Energy & Environmental.
Aug. 22, 2007 Americas CF&S Kick Off Meeting 1 Overview of Value Engineering Program T. Lackowski.
Company Presentation. Triple-T at a glance Founded in 1994 Providing end-to-end solutions: expertise and certifications in a wide range of disciplines.
Objectives Terminal Objective
Bill Clark Manager, Seattle Facilities & Engineering Space Planning, BMRAM System Owner.
4-H Administrative Update 2006 Youth Development Institutes March 2006.
1 EM Update and Perspective David Huizenga Senior Advisor for Environmental Management 2012 DOE Project Management Workshop April 3, 2012.
Continuous Value Enhancement Process
TALOS Total ATM Life-cycle operational Solution. The Cost equation Life cycle costs are high Life cycle costs are complex Life cycle costs involve all.
Telecom Lifecycle Management Solutions for Sales Partners.
Presentation By: Chris Wade, P Eng. Finally … a best practice for selecting an engineering firm.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
ENERGY CONSERVATION TEAM (Facility Audits and Recommissioning )
Basel Accord IITRANSITIONSERVICES Business Integration Support FCM Management Limited Paris New York Toronto.
Implementing and Managing a Maintenance Plan The Maintenance Plan Ken Henman.
UNCLASSIFIED Mission and Installation Contracting Command FOUO Cathy Bella PARC February 2012 Contracts or Agreements with Municipalities.
Government Furnished Equipment (GFE) Overview
Program Performance Accountability & Measurable Results Kevin Keaney, Chief Pesticide Worker Safety Programs U. S. EPA 2005.
Change Management “Getting from where you are, to where you want to be”
June 20, 2012 Outsourcing Physical Plant Should I ???
Industrial Engineering Roles In Industry
Clean Facilities… Sustainable Solutions Local Touch… National Reach.
Acquisition Strategy Under the laws of the State of Colorado Commercial acquisition practices to be utilized.
Department of the Interior CPIC Forum Department of the Interior CPIC Forum Capital Planning and Investment Control (CPIC) Revisions to the Construction.
Acquisition and Contract Management Update Jay Rhoderick Associate Deputy Assistant Secretary for Tank Waste and Nuclear Material AtomEco-2012.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
© Dr. John T. Whiting All Rights Reserved Slide 1 Information Technology – The Key to Public Education Reform Based.
Mobile County Public School System District Technology Plan James Willcox Joanne Kline Yoko Nagashima.
2 William P. McNally Assistant Administrator for Procurement NASA Procurement Tenets August 4, 2008 NCMA Conference.
DOE Order 413.3A Program and Project Management for the Acquisition of Capital Assets Catherine Santana Deputy Director, Project Management Systems, OECM.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
Do Work Safely DOE Hanford Site Recovery Act Support to New Workers Ted Giltz Hanford Site Recovery Act Project Manager
Office of Acquisition and Property Management Integration of Value Engineering (VE) and the Five-Year Planning Process.
The global energy landscape and its impact on Bangladesh Dr. Boris Gehring TÜV SÜD Slide 1 13/10/15‘Safe Future Now’ Summit on Power and Energy in Bangladesh.
DOE ASSET MANAGEMENT PLAN
Federal Acquisition Service U.S. General Services Administration OASIS One Acquisition Solution for Integrated Services What is OASIS? OASIS One Acquisition.
1 NASA Office of Procurement NASA Procurement Tenets April 15, 2008 SMC Brief Bill McNally Assistant Administrator for Procurement.
Monitoring the Long-Term Effectiveness of Integrated Safety Management System (ISMS) Implementation Through Use of a Performance Dash Board Process Mike.
“Provide best value for customer agencies and taxpayers” 1 Software Asset Management Fred Allen - SAM Program Manager General Services Administration Interagency.
COMMAND STAFFING Presented by Adrienne Somerville AIR 2.0 Technical Lead 26 July 2007 Enabling the Right Skills At the Right Time To Accomplish the Right.
Budget Study Sessions Strategic Support Proposed Operating Budget OUTCOMES: - A High Performing Workforce that is Committed to Exceeding.
Strength Through Science
The Federal Oversight and Contractor Assurance System Directives Safety Culture Improvement Panel Meeting September 7, 2016 Patricia.
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

United States Department of Energy Value Engineering CONTRACTOR PERSPECTIVES Bruce Lenzer, CVSL, FSAVE Richard Harrington, CVSL, CH2MHill

HISTORICAL PERSPECTIVE  1980 – 1987 Programs started at Field Office Levels, little or no central coordination or reporting  Some contractor initiated VE due to VE Clauses in contracts  1987 – 1992 Program expanded with HQ coordination and support  1990 Some Field Offices implemented VE policy, procedures, and requirements with their prime contracts  1992 High visibility at the Superconducting Super Collider, invigorated focus of VE use in Scientific R&D

HISTORICAL PERSPECTIVE  1993 – 1996 Office of Field Management, (now Office of Engineering and Construction Management) issues DOE Orders:  413.3B “Program and Project Management for Acquisition of Capital Assets” (includes requirement to perform VE as part of Stage Gate Process at Critical Decision 2)  DOE O 430.1A “Life Cycle Asset Management”  DOE P “Value Engineering Policy”  For implementing PL

HISTORICAL PERSPECTIVE  1996 – 2000  Energy Facilities Contractors Group (EFCOG) published Value Management guide  HQ VE website developed for DOE Office of Engineering and Construction Management  Website included links of project reports and cost savings or avoidance summary data  A DOE HQ Champion utilized CVS VE Specialist to gather historical reports from 5 – 7 years  ~ $750M Savings & ~ $2B in LLC cost avoidance  Several high visibility and successful VE studies  Al Gore Golden Hammer Award  Customer Partnering Awards from Deputy Secretary for Facility Management

HISTORICAL SUCCESS  Hanford Nuclear Reservation:  1990 – 1996  Average 48:1 ROI  Completed VE Projects contributed to ~$30M additional contractor award fees  1996 – 2002  Completed VE Projects contributed to ~$1B additional contractor award fees

HISTORICAL SUCCESS  VE Applications:  Design and Construction  New and Existing Facility & Systems Renovations/Upgrades  Scientific Equipment, Decision Analysis, R&D

HISTORICAL SUCCESS  VE Applications – Continued -:  Processes (Soft VE) including:  Contract Requirements  Supply Chain  Configuration Management  QA – Corrective Action Management  Calibration Program  Engineering & Design Processes & Standards  Information Systems  Project Delivery Systems  Work Management  Maintenance  Fabrication  Materials Management  Telecommunications

8 SOFT VE – BUSINESS PROCESS RESULTS  Supply Chain Optimization 2000$ 58M (5yr)  Supply Chain Validation 2001$ 14M/Year  Integrated:  Materials & Supply Chain Mgmt.$ 100M/(5yr)  Work Management & Work Control $ 10M (5 yr)  Predictive, Preventive Maint. & Calibrations $ 30M (5yr)  Quality Corrective Action Mgmt. $ 20M (5yr)  Contract Requirements Value Analysis$ 53M (18yr)  Contract Cost Avoidance ALL RIGHTS RESERVED  2004 Synergy Value Solutions, LLC

HISTORICAL SUCCESS  VE Applications – Continued -:  Hybrid Function Diagram:  FH MATERIALS MGMT COMBINED.pdf FH MATERIALS MGMT COMBINED.pdf

PROGRESSIVE STATUS  1996 – Present  Decline in VE contract requirements and reporting & use except:  …..for use on projects subject to DOE O 413.3B “Program and Project Management for Acquisition of Capital Assets”  VE Process watered down to punch the ticket  Example….one project used VE on Civil & Facility Engineering, but not technical components. Tech. components comprised 80% of project cost  Required by some contracts, but not as much  Few if any voluntary uses

PROGRESSIVE STATUS  Perception of Project Managers that projects will lose budgets if VE used  Fewer VE professionals around the complex  1996 Sunset of OMB Circular  OMB Auditing stops  Diminished HQ support  Untrained, unqualified, uncertifed personnel have allowed VE to become synonymous with cost cutting  1997 – 2011 VE became synonymous with other improvement techniques  Non-certified consultants are performing similar processes, but not VE….Some titled the work as VE

PROGRESSIVE STATUS  Focus on using flavor of the month e.g. SixSigma  Cases where certified VE consultants not using function analysis  Performing 1 and 2 day studies doing brainstorming and evaluation only ….. Not true VE Studies  DOE Office of Engineering and Construction Management eliminated VE Website  Loss of champion at DOE HQ and Field Offices…. No succession planning to continue VE program

FUTURE OF DOE VE/VM PROGRAM  2006 EFCOG Executive & DOE Management awarded DOE Complex Best in Class VE Study & Results  2012 recent VE success in DOE Department of Environmental Management has drawn attention to the need re-educate DOE Complex on how VE can make a difference to reduce schedule risk, reduce worker exposure, and saving $millions  Re-issuing VE expectations in Public Law  Re-establishment of OMB A-131  Leverage Federal Acquisition Regulation  Part 48 & 52

FUTURE OF DOE VE/VM PROGRAM  Federal Budgets are tight, and expected to be tight, for the foreseeable future  These facts give impetus for resurrecting a complex wide DOE VE program  Timing is good for DOE to reestablish an effective program

FUTURE OF DOE VE/VM PROGRAM  Lawrence D. Miles Value Foundation  New Website   DOE Process Example