Linear Collider Detector R&D Support John Jaros SiD Workshop at SLAC August 22, 2012.

Slides:



Advertisements
Similar presentations
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Valencia May
Advertisements

White Papers, Framework Proposals, FOA’s, and LCDRD John Jaros SiD Meeting Oregon ALCPG March 23, 2011.
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
Vtx Detectors, Jim Brau, UTA, Jan 11, Jim Brau ALCPG Workshop UT Arlington Jan 11, 2003 Summary of Vertex Detector Working Group R&D efforts in.
R Frey ESTB20111 Silicon-Tungsten Electromagnetic Calorimeter R&D Collaboration M. Breidenbach, D. Freytag, N. Graf, R. Herbst, G. Haller, J. Jaros, T.
Office of Science U.S. Department of Energy Presentation to the American Linear Collider Workshop Cornell University July 13 – 16, 2003 Jim Reidy July.
A Possible Strategy Towards a Future Lepton Collider Tor Raubenheimer SLUO Annual Meeting September 17, 2009.
Summary Remarks By Jonathan Dorfan. We Are Living In a Remarkable Time – We Stand at the Door to a A scientific Revolution  Discoveries of the past five.
ALCC Americas’ Linear Collider Committee Andy White University of Texas at Arlington.
Silicon Detector: Simulation & Reconstruction Norman Graf SiD Advisory Meeting September 14, 2009.
David Attié Club ‘ILC Physics Case’ CEA Saclay June 23, 2013 ILD & SiD concepts and R&D.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
Charge to the SiD Workshop Andy White University of Texas at Arlington.
Status Report of the LCC Detector R&D task force Maxim Titov (CEA Saclay) Jan Strube (Tohoku University)
ALCPG software: status and future plans LCWS UT Arlington October 23, 2012 Norman Graf (for the sim/reco group)
Summary of Calorimetry/Muon Sessions Burak Bilki University of Iowa Argonne National Laboratory.
Generic Detector R&D for an Electron Ion Collider RHIC & AGS Annual Users Meeting T. Ludlam, June 2011.
1 + DOE/NSF ILC Detector R&D Review June19-20, 2007 At Argonne National Laboratory Paul Grannis Jim Whitmore.
SiD R&D on PFA and Calorimetry -> IDAG guidance. -> Present PFA situation. -> Developing a timeline for PFA development. -> Calorimetry aspects.
J. Brau SiD Workshop (SLAC) Mar 4, Linear Collider Detector R&D Proposal to NSF/DOE for US Universities J. Brau.
SiD Concept – R&D Needs Andy White U. Texas at Arlington SiD Concept Meeting LCWS06 Bangalore, India March 11, 2006.
ACFA Summary Akiya Miyamoto, KEK KILC12 26 April, 2012.
Beam Test Activities LC Test Beam Activities VLCW06 July 20, 2006 Jae Yu Facility updates Beam Test Activities FNAL ILC-Task Force Conclusions.
Preparing for the SiD LoI SiD Parallel Session TILC08 March 5, 2008 John Jaros.
CALICE Referees’ Review Andy White, Junji Haba DESY – PRC 71 April 2011.
ALCPG2011, March 2011 H.Weerts1 ALCPG2011 Summary H.Weerts Argonne National Laboratory.
World Wide Study of Physics and Detectors for a future e + e - Linear Collider David J. Miller; towards a WWS response to ILCSC/ICFA How do we propose.
24 Mar 2009Paul Dauncey1 CALICE-UK: The Final Curtain Paul Dauncey, Imperial College London.
ACFA-7; Taipei, Nov 2004 H.Weerts Kick-off The Si licon D etector Design Study SiD Organization & Status H.Weerts Fermilab/Michigan State Univ. SiD kick.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting.
Lcsim software: status and future plans ECFA-LC DESY May 28, 2013 Norman Graf (for the sim/reco group)
5 February 2003Paul Dauncey - Calice Status1 CALICE Status Paul Dauncey Imperial College London For the CALICE-UK groups: Birmingham, Cambridge, Imperial,
SiD collab. Mtg., 30 jan 2008 H.Weerts Stimulate the discussion & Closing Remarks to SiD collaboration meeting 30 January 2008 H.Weerts Argonne National.
SiD – Beyond Snowmass Andy White University of Texas at Arlington for the SiD Concept 1/18/2013SiD Beyond Snowmass A. White.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
14 April 2006RDB Meeting – Chris Damerell 1 ILC Detector R&D US Funding Needs Chris Damerell  Established funds in FY05 and required funds from FY06 for.
SiD workshop, January 16-18, 2013 H.Weerts Building the SiD collaboration H.Weerts Argonne National Laboratory Proposal & suggestions.
SiD R&D Priorities Andy White University of Texas at Arlington SiD Workshop at SLAC March 2009.
SiD Detector Baseline (A brief review) Andy White University of Texas at Arlington.
1 Scope of PosiPol2008 WS LC related positron source issues (ILC and CLIC) General Capture Section Targets Polarized Particle Physics Laser Applications.
Lucie Linssen, CLICdp, bi-monthly meeting, 3 Aug General news CLICdp monthly meeting August 3 rd 2015.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
SiD Workshop Highlights May 8, 2007 John Jaros. Jim Brau WWS Detector Roadmap SiD Workshop, Fermilab April 9, 2007 Keeping up with Machine: Motivation.
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
Budget Outlook Glen Crawford P5 Meeting Sep
SiD Vertexing and Tracking Contribution to the LOI Bill Cooper Marcel Demarteau Ron Lipton Rich Partridge Dong Su For the SiD Vertex/Tracking Group SiD.
Snowmass Summary Session: Introduction D. MacFarlane August 23, 2013.
SiD Detector Concept R&D Perspective Andy White SiD R&D Coordinator University of Texas at Arlington.
Proposal for the End Station Test Beam (ESTB) at SLAC John Jaros ALCPG09 Albuquerque September 30, 2009.
Simulation Plan Discussion What are the priorities? – Higgs Factory? – 3-6 TeV energy frontier machine? What detector variants? – Basic detector would.
Detector R&D at Fermilab Some Perspectives Marcel Demarteau For the Fermilab Detector & Physics R&D Group SiD Workshop SLAC January 28-30, 2008.
Fermilab: Introduction Young-Kee Kim DOE KA12 (Electron Research)Review June 22-23, 2010.
KA12 Marcel Demarteau Fermilab DOE Site Visit August 23,
SLAC contribution to the Muon Accelerator Program (MAP) SLAC2MAP.
Vincent Boudry LLR, École polytechnique LCTW'09 Orsay 2-5 November 2009 Calorimetry Hot spots.
HPS EC Report John Jaros HPS Collaboration Meeting at JLAB May 5, 2017.
SiD R&D Plan and Opportunities for New Collaborators
SiD Calorimeter R&D Collaboration
LC Test Beam Activities
Prospects for ILC Detector R&D Funding
PDAP Junji Haba, KEK.
detector development readout electronics interconnects bump bonding
Preparations for the SiD Workshop at Fermilab, April 9-11
The SiD Detector Outline Overview
January Collaboration Meeting
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
ILC Detector Technology
End Station Test Beam (ESTB) at SLAC
Detectors for future accelerators
Presentation transcript:

Linear Collider Detector R&D Support John Jaros SiD Workshop at SLAC August 22, 2012

The 2012 FOA and LCDRD  LC Detector R&D has been supported by DOE over much of the past decade, at the labs and through the Universities.  Most recently, DOE has supported the University Detector R&D project, including SiD R&D, which was administered by Jim Brau out of U Oregon.  Funds for SiD R&D’s third and final year were dispensed at the end of FY2011 at the level of ~$0.9M, providing support through much of FY SiD SLAC Workshop 2012

The 2012 FOA and LCDRD  A DOE Collider Detector Funding Opportunity (FOA) was announced winter 2011, with proposals due in March.  In response, the LCDRD Consortium was born. It solicited the HEP community for LC detector R&D, and attracted many of the projects which had been supported by SiD R&D.  Proposals were solicited Winter/Spring 2011, resulting in the submission of a Field Work Proposal (FWP) from SLAC. PIs were Jim Brau, Marcel Demarteau, John Jaros, and Ron Lipton. 3SiD SLAC Workshop 2012

LCDRD Requested $10M over 5 years 4SiD SLAC Workshop 2012 LCSIM Chronopix Vertex Sim Laser Alignment SiD Tracking “ GEM Dual Readout CAL DHCAL SiW Ecal “ IOWA PFA RPC Gas E Spectrometers “

LCDRD Proposal  LCDRD was presented as a Consortium Proposal  A Review Board established LCDRD priorities and provided governance. Brau, Jaros, Lipton, Para, Peterson, Weerts served on the Board.  Pitch: Support the simulations and do the essential R&D to allow an objective comparison of the various lepton collider options (ILC, CLIC, MuC) in time for “Snowmass” (which at the time wasn’t yet scheduled). 5SiD SLAC Workshop 2012

LCDRD Proposal  Highest priority was support for lcsim infrastructure, to be used for ILC, CLIC, and MC studies.  Detector R&D was completely dominated by ILC detector work. The intent was to broaden the scope in the out years to include CLIC and even Muon Collider detector R&D as new projects became well-defined.  The LCDRD Proposal included an overall narrative, summaries of the individual proposals, and copies of proposals themselves 6SiD SLAC Workshop 2012

Review of LCDRD  DOE used external reviewers, and chose to review individual sub- proposals, not the overall consortium proposal.  LCSIM, highly ranked, was urged last September to submit an independent FWP. It will be funded this September for $300k for one year.  Bad news for all other LCDRD proposals was unofficially circulated by the end of SiD SLAC Workshop 2012

Review of LCDRD  Several of us (Demarteau, MacFarlane, Brau, White, Grannis, Jaros) met with Jim Siegrist and Glen Crawford at DOE February 15, 2012, to ask about LCDRD status (proposal had been declined), request continued LC detector R&D support, and discuss strategy.  Siegrist was sympathetic to keeping LC effort afloat. Suggested we work out next steps with DOE after seeing reviewer’s comments.  Reviewer’s comments were delivered in late June. They were discussed with Glen Crawford on June 27, Most reviews were quite positive.  Glen suggested we pursue a new, scaled-down, one year FWP. He also called our attention to a new detector FOA from DOE HEP. 8SiD SLAC Workshop 2012

LCDRD …one more time  Solicitation We transmitted reviews to the original proponents, informed them about a new FOA they could individually apply to, and solicited their enrollment in LCDRD, Round II.  Sharpened and updated the LCDRD Pitch: Higgs + Japanese Interest + Snowmass  important to keep SiD and ILC physics and detector interests in the US alive and competitive. Need to be ready to participate if world-wide project is realized in the next few years.  Leaner and Meaner 300k-500k deemed “appropriate”; one year proposal Same PIs: Brau, Demarteau, Jaros, Lipton SLAC FWP Submission aimed for end of August 9SiD SLAC Workshop 2012

LCDRD II Projects  Vertex * Chronopix (UO and Yale) * Pixel Sim (UCSC)  Silicon Detectors * SiD Microstrip Performance and Readout (UCSC) * Beamcal sensors and radiation hardness (UCSC) * Cables/connections for tracker modules (UNM)  Calorimetry * SiW Prototype Ecal (UO and UCD) * DHCAL Support (U Iowa) * GEM (UT Arlington) * PFA (U Iowa)  Beamline * Energy Spectrometer (UO) 10SiD SLAC Workshop 2012

Status  Gathering proposals and budgets this week (most are in)  FWP Budget assembled this and next week  SLAC internal Budget Review next week  Hopefully, Director’s approval and submission before September 1  Fingers crossed This year’s proposal is a keep alive effort which we hope can grow into a substantial, multi-year proposal, if Linear Collider futures continue to improve and DOE takes note. 11SiD SLAC Workshop 2012