DOE’s Plutonium Disposition Infrastructure with a Focus on the Savannah River Site Tom Clements Adviser to the South Carolina Chapter of the Sierra Club.

Slides:



Advertisements
Similar presentations
MOX Fuel Fabrication Facility: Leading the Nuclear Renaissance
Advertisements

Mosi Dayani, MFFF Project Engineer U.S. Department of Energy, NNSA Presentation to the DOE Operating Experience Committee, 2010 ISM Champions Workshop.
Not to be Considered as a Regulatory Submittal Pre-Decisional DRAFT 19438_1 Preferred Alternative Recommended by Core Team Environmental Impact Statement.
DOE Plans for Restarting Domestic Pu-238 Production
Argonne National Laboratory is managed by The University of Chicago for the U.S. Department of Energy Advanced Fuel Cycles and Repositories Dr. Phillip.
Lithuanian concept for disposal of
Optimisation of New Build Spent Fuel Management and Disposal Peter Haslam Public Policy Advisor Nuclear Industry Association 25 January 2011.
Iran’s Nuclear Program: Status and Implications Olli Heinonen Belfer Center for Science and International Affairs Harvard Kennedy School 19 November, 2013.
U.S. HEU Disposition Program Robert M. George Office of Fissile Materials Disposition International Nuclear Materials Management Annual Meeting July 2009.
Projectizing an Operating
ANS Winter Meeting Key Insights. Plenary Session Takeaways Global Nuclear Leaders are non-Western – China/India/Russia/South Korea Current challenge to.
Liquid Waste Organization
1 Status of DOE Cleanup in Idaho Presentation to the “LINE Commission” By Rick Provencher Manager, DOE Idaho Operations Office April 7, 2012 Idaho Falls,
Progress on Cleanup of the INL Site for the INL Retired Employees Association Bob Iotti, President and CEO September 2008.
1 EM Update and Perspective David Huizenga Senior Advisor for Environmental Management 2012 DOE Project Management Workshop April 3, 2012.
1 Commercial Spent Fuel Management By Thomas B. Cochran Natural Resources Defense Council Presented at the Meeting of the National Academy of Sciences.
Augustus Merwin Presented to the National Security Forum
The Nuclear Fuel Cycle. Presentation Components of the Fuel Cycle Front End Service Period (conversion of fuel to energy in a reactor) Back end Storage.
Long Term Storage, The Failure of the Federal Government, and NIMBY.
The Yucca Mountain Repository for Nuclear Waste April 23, 2007 Edward F. Sproat III Director Office of Civilian Radioactive Waste Management U.S. Department.
Safety  performance  cleanup  closure M E Environmental Management National Spent Nuclear Fuel Program Role in DOE’s Transformation Barb Beller, Project.
Nucular Waste A Technical Analysis Ian Baird 5/12/08.
Defense Waste Processing Facility 257 Actual Canisters Produced in FY05 37% Waste Loading (averaged for FY05) 1,995 Total Canisters Produced (as of the10/31/05.
1 Waste Management David Nickless Environmental Management Los Alamos Field Office March 3, 2015.
Near Term Planning for Storage and Transportation of Used Nuclear Fuel Jeff Williams Project Director Nuclear Fuels Storage and Transportation Planning.
NUCLEAR FUEL CYCLE PLANTS OF ENEA AND FN TO BE DECOMMISSIONED NUCLEAR FUEL CYCLE PLANTS OF ENEA AND FN TO BE DECOMMISSIONED FN INDUSTRIAL FUEL FABRICATION.
Spent Nuclear Fuel Timothy Pairitz. Nuclear Power 101 Uranium-235 is enriched from 0.7% to 3-5%. Enriched fuel is converted to a uranium oxide powder.
Nuclear Reprocessing: an existing alternative energy approach By: Justin Rearick-Hoefflicker.
Savannah River Site Status Report DOECAP Analytical Services Program 2014 Workshop Ken Guay, (DOE SR Program Manager) September , 2014 Albuquerque,
Nuclear Reactors Health Physics Society - Power Reactor Section Radiation Science Education.
Welcome to… Hosted by Pull the Plutonium Pork – End MOX Monday, June 24, :00 PM EDT.
GNEP: A Proliferation Risk or a Solution to the Nuclear Waste Problem? Allison Macfarlane George Mason University Senate briefing June 23, 2008 Allison.
4/2003 Rev 2 I.4.9j – slide 1 of 18 Session I.4.9j Part I Review of Fundamentals Module 4Sources of Radiation Session 9jFuel Cycle – High Level Waste Disposal.
Fuel Cycle – High Level Waste Disposal
The Nuclear Fuel Cycle Dr. Okan Zabunoğlu Hacettepe University Department of Nuclear Engineering.
Current DOE Efforts in Nuclear Materials Management Patrice M. Bubar Associate Deputy Assistant Secretary, Office of Integration and Disposition (EM-20)
MOX Safety Fuels the Future Integration of Safety in Design in MOX Fuel Fabrication Facility Sue King.
Reprocessing. Reprocessing is tricky Reprocessing: separating the elements in the highly radioactive spent fuel Small reactors that produce medical isotopes.
M E Environmental Management safety  performance  cleanup  closure The U.S. Department of Energy Environmental Management Intergovernmental Meeting.
Savannah River Site Site Utilization and Management Plan May 13, 2005.
National Cleanup Workshop Managing Large Capital Projects Ken Picha Deputy Assistant Secretary for Tank Waste and Nuclear Material.
Nuclear Waste. What is Nuclear Waste? Waste that results from the use of radioactive materials -Nuclear energy -Nuclear weapons -Hospitals, Universities,
Integrated Used Nuclear Fuel Management Regulatory Information Conference U.S. Nuclear Regulatory Commission March 11, 2009 Steven P. Kraft Senior Director.
4/2003 Rev 2 I.4.9j – slide 1 of 18 Session I.4.9j Part I Review of Fundamentals Module 4Sources of Radiation Session 9jFuel Cycle – High Level Waste Disposal.
1 Construction of Salt Waste Processing Facility (SWPF) Charting the Course for Major EM Successes in September 29, 2015 Frank.
IAEA International Conference on Management of Spent Fuel
EM Budget--- Past/Present/Future Mark W. Frei U.S. Department of Energy October 14, 2005.
The Nuclear Fuel Cycle 1. NUCLEAR FUEL Nuclear fuel is the energy source of nuclear reactors and an essential element of the reactor core. The heat energy.
Critical and Source Driven Subcritical Systems for: - Waste Transmutation - Fuel Breeding Phillip Finck Associate Laboratory Director for Nuclear Science.
The Nuclear Fuel Cycle Mary Lou Dunzik-Gougar, PhD ANS Teachers’ Workshop 2014.
Frank Marcinowski Deputy Assistant Secretary for Regulatory Compliance Office of Environmental Management U.S. Department of Energy Environmental Management.
1 ISMS/EMS Lessons Learned on Plutonium Disposition Projects at SRS Presented by: Joan S. Bozzone NNSA Environmental Manager NNSA Site Engineering and.
Nuclear Waste. High /Low Level Waste Low level waste: generated at hospitals, educational facilities, nuclear power plants and industry. Examples: radio-chemicals,
U.S. HEU Disposition Program Robert M. George HEU Disposition Program Manager Office of Fissile Materials Disposition.
US-DPRK Next Steps Workshop January 27, 2003Washington, D.C. Yongbyon Spent Fuel Experience Presented by Mark Mohr
 closure E M Environmental Management  cleanup  performance safety STRATEGY MEETING NATIONAL SPENT NUCLEAR FUEL PROGRAM Bringing Innovation to Spent.
1 EM Update Presented to the National Governors Association Federal Facilities Task Force Dr. Inés Triay Principal Deputy Assistant Secretary for Environmental.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Nuclear Engineering Division Argonne National Laboratory.
The Yucca Mountain Repository for Nuclear Waste June Edward F. Sproat III Director Office of Civilian Radioactive Waste Management U.S. Department.
International Atomic Energy Agency Reprocessing, Waste Treatment and Disposal Management of Spent Nuclear Fuel Seminar on Nuclear Science and Technology.
The Uranium Fuel Cycle Robert Tsai November 21, 2006.
South Carolina Nuclear Advisory Council SRS Update and FY 2017 Budget Service ● Safety ● Security ● Stewardship ● SRNL ● Sustainability April 14, 2016.
Savannah River Site Watch Columbia, South Carolina
THE NUCLEAR FUEL CYCLE. The Nuclear Fuel Cycle consists of sequence of steps in which U ore is mined, milled, enriched, and fabricated into nuclear fuel.
Savannah River Downblending Program for Surplus, Non-Pit Plutonium Unclassified Kenneth S. Fuller K-Area Complex Operations Support Manager 2016 INMM Annual.
EFCOG Startup and Commissioning Task Team Introduction
Nuclear Waste.
Mary Lou Dunzik-Gougar, PhD ANS Teachers’ Workshop 2013
NDA Draft Strategy.
Challenges at DOE’s Savannah River Site CPRC’s “Power to the Peaceful” February 4, 2017.
Presentation transcript:

DOE’s Plutonium Disposition Infrastructure with a Focus on the Savannah River Site Tom Clements Adviser to the South Carolina Chapter of the Sierra Club Columbia, S outh Carolina Plutonium Disposition Alternatives Workshop Washington, DC January 30-31, 2014

Key plutonium disposition facilities Savannah River Site – Aiken, South Carolina K-Area Materials Storage facility (KAMS) K-Area Interim Surveillance facility (KIS) H-Canyon reprocessing plant HB-Line Defense Waste Processing Facility (DWPF) MOX Fuel Fabrication Facility (MFFF) Waste Solidification Building (WSB) New Mexico Advanced Recovery and Integrated Extraction System (ARIES) - Los Alamos National Lab, New Mexico Pipe Overpack Containers (POCs) to Waste Isolation Pilot Plant (WIPP) - Carlsbad, New Mexico

DOE complex

Savannah River Site Aiken, South Carolina

SRS: 310-square miles/800-square km 10,000 employees; site manager always claims “SRS is not a closure site”

C-Reactor – on path for in-situ decommissioning

K-Area Materials Storage facility (KAMS) designated as DOE’s storage facility for non-pit plutonium, contains about 13 MT

Storage containers in KAMS 9975 shipping and storage container 3013 can, placed inside a 9975

K-Reactor becomes KAMS; IAEA safeguards on about 2 MT – containers tagged and under video observation

Pantex (Amarillo, Texas) – weapon assembly & dismantlement site, pit storage (limit 20,000)

Mixed Oxide Fuel Fabrication Facility (MFFF) 600,000 square feet, 1500 employees December 13, 2013

MFFF includes a PUREX line to purify plutonium to MOX feedstock standards

Waste Solidification Building – to process uranium and actinide waste from MFFF; quietly put on 5-year “lay-up” by NNSA in December 2013

Alternative options for MOX plant?  Fissile material storage;  Pit dissambly;  Install furnaces for plutonium oxide production;  Install gloveboxes for WIPP option;  Fabrication of plutonium pucks – ceramic or glass – for disposal in HLW canisters;  Fabrication of “off-spec” MOX pellets for disposal with spent fuel;  Packaging of other waste materials at SRS;  Small modular reactor fuel fabrication;  Mothball for possible future use;  Waste Solidification Building for TRU or other waste packaging.

H-Canyon Reprocessing Facility - designated to process several MT of non-pit plutonium-239 for MOX feedstock – safety review delayed; first 40 kg plutonium now in solution in process tank; not under IAEA safeguards; 50 years old; 800 employees

Los Alamos National Lab TA-55 – location of plutonium facilities, including the planned Chemistry and Metallurgy Research Replacement facility (CMRR)

“Plutonium pits are transformed into plutonium oxide powder by roasting them in a way similar to roasting green chili, shown here. (Photo: LANL) “ – “Meeting Nonproliferation Agreements Requires Destroying Thousands of Surplus Plutonium Pits,” National Security Science magazine, November 2012

Advanced Recovery and Integrated Extraction System (ARIES) - has produced several hundred kgs of plutonium oxide to meet MOX feedstock requirements, target in 2014 is 300 kg & 2 MT by 2018; produced in Plutonium Facility-4 (PF-4) at LANL and shipped to SRS in 3013 cans

Processing of pits in ARIES; pit and non- pit plutonium in H-Canyon  Pit processing needed in all cases.  Continue to process all surplus plutonium to oxide? To MOX feedstock standards or for waste disposal?  Use both ARIES and aging H-Canyon, in part to continue work for LANL and SRS?  Use MOX plant for pit disassembly, conversion;  Look again at dedicated pit disassembly facility?  Store all plutonium until disposal decisions made and facilities available, halt use of facilities for oxide production? (H-Canyon may still reprocess spent HEU-bearing fuels.)

Defense Waste Processing Facility (DWPF) – has filled 3,758 containers – about half of total

DWPF receives sludge from “tank farm” and cesium stripped from salt waste; “waste incidental to reprocessing” goes into vaults with grouted saltstone

Plutonium loading in DWPF canisters SRS presentation of Sept. 9, 2008:.087 kg Pu-239/m³ allowed, to dispose of 5 MT Pu a loading of 3.6 kg/m³ needed, but ~20 kg/m³ is “critically safe”

DWPF and plutonium immobilization  Why was immobilization halted?  How seriously has it been analyzed in the assessment?  What is plutonium loading capacity of a canister?  Basis for 897 gm limit now that Yucca Mountain halted?  Savannah River National Lab: 18 kg/DWPF canister analysis?  Where is criticality analysis of 20 kg/m³?  At various loading amounts, how much plutonium can go into remaining canisters?  Immobilization of ceramic or glass pucks?  Is a radiation barrier needed? What about the “spent fuel standard”?  Given Yucca Mtn. situation, new opportunities for repository WAC for DWPF canisters?  Problems with processing large amounts of plutonium through H- Canyon and to DWPF system?

222 “pipe overpack containers” shipped from SRS to Waste Isolation Pilot Plant (WIPP) - ~33 kg plutonium; perhaps 600 POCs packaged and ready to ship

HB-Line – furnace and glove box to process material form H-Canyon in oxide – into POCs to WIPP or 3013s for MOX feedstock

HB-Line glovebox – where plutonium mixed with “stardust” for WIPP disposal

~$100,00/kg to package SRS plutonium into POCS for WIPP

Defense Authorization Act of 2002 – amended twice (c) Contingent requirement for removal of plutonium and materials from Savannah River Site If the MOX production objective is not achieved as of January 1, 2014, the Secretary shall, consistent with the National Environmental Policy Act of 1969 [42 U.S.C et seq.] and other applicable laws, remove from the State of South Carolina, for storage or disposal elsewhere- (1) not later than January 1, 2016, not less than 1 metric ton of defense plutonium or defense plutonium materials;

Packaging Plutonium at SRS for WIPP  To meet Jan. 1, 2016 requirement to remove 1 MT from SC, WIPP is the only option;  Install more gloveboxes and furnace in HB-Line;  Install more gloveboxes and furnace in K-Area Interim Surveillance facility (KIS);  Install glovebox in H-Canyon “truck well;”  Install gloveboxes and furnances in MOX plant;  Cost for all steps of oxidation, packaging?;  Gloveboxes at other facilities at SRS? L-Reactor, C-Reactor;  Packaging of “hybrid container” for WIPP?

Conclusions  Plutonium disposition necessary;  Secure storage of plutonium at SRS, Pantex;  Pit disassembly needed;  Convert plutonium to oxide;  Ship POCs at SRS to WIPP;  Install gloveboxes for packaging of initial 1 MT for WIPP;  Analyze “stardust;”  R&D for rapid deployment of immobilization in DWPF;  Mothball MOX plant, explore alternate use;  Stakeholder input into assessment, way forward.