Validation and Verification of CDM Projects Climate Change Kiosk on CDM/DNA, COP9 December 6, 2003 Marco van der Linden SGS Climate Change Programme.

Slides:



Advertisements
Similar presentations
Paulo Manso CDM EB September, 2011 Proceeder for Submission & Approval Standardized Baselines.
Advertisements

Sarah Radovan | Chief, Measurement and Reporting, Government of Canada Considerations for Building a Cost Efficient Environmental Technology Performance.
The CDM Project Activity Cycle UNFCCC CDM joint workshop March 2003 Bonn Kai-Uwe Barani Schmidt UNFCCC/Cooperative Mechanisms
UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, March.
SDM programme, UNFCCC secretariat Kishor Rajhansa, Programme Officer STATUS AND WAY FORWARD ON STANDARDIZED BASELINES UNFCCC Joint coordination Workshop.
European Commission: Environment Directorate General Slide: 1 Linking the EU Emissions Trading Scheme with JI and CDM Linking the EU Emissions Trading.
S E R V I N G C A N A D I A N S A U S E R V I C E D E S C A N A D I E N S This may not necessarily represent the view of the Government CBA/Justice Annual.
1 Validation and registration Verification and issuance Technical Workshop on CDM Paramaribo, 20 June 2008 Adriaan Korthuis.
CDM – LULUCF Project Cycle Winrock International Sandra Brown Training Seminar for BioCarbon Fund Projects.
BLY CPA Verification- A DOE’ Perspective Archak Pattanaik New Delhi,
ICAO Symposium on Aviation and Climate Change, “Destination Green”, 14 – 16 May 2013 Destination Green Overview of the United Nations’ offset mechanisms.
Module 1: Introduction and recap M1. M1. Introduction and recap This first workshop covers all the following contents – as per work plan: CDM modalities.
Ensuring Effective Monitoring, Certification and Verification of Emissions by Jed Jones Lloyd’s Register.
1 Rajesh Kumar Sethi Chair of the CDM Executive Board Clean Development Mechanism 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop on means.
Canada’s Offset System for Greenhouse Gases Dean Stinson O’Gorman New Brunswick Climate Change Hub meeting October 7, 2009.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
TÜV SÜD South Asia Programme of activities (PoA) - Requirements & Challenges in CPA inclusion By Vijayanand TÜV SÜD South Asia
CDM PoA CPA. What is a Programme of Activities? Definition: A programme of activities (PoA) is a voluntary coordinated action by a private or public.
UNFCCC Secretariat Overview of the CDM and the CDM project Cycle Training-Workshop to support the “Uganda Municipal Waste Compost Programme” Kampala, Uganda,
SDM programme UNFCCC secretariat Session 2: The CDM project cycle Monitoring, Verification and CER issuance Training-Workshop to support the “Uganda Municipal.
CDM Project Cycle Carbon Markets – CDM project development, 8. August 2010 Jørgen Fenhann.
UNFCCC Secretariat Status of negociations on CDM Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America and the Caribbean,Bogota, (31 –
CDM National Authorities : an Example Prepared for the National Workshop on Capacity Development for Clean Development Mechanism (CD4CDM) March 2003,
Introduction to Climate Change: - global warming - basis steps in a clean development project - connection of CDM with European Trading Scheme Wim Maaskant.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
Climate Change and CDM in Thailand
Expertise everyday, everywhere Verifying Sinks and Bio-energy Projects Irma Lubrecht Société Générale de Surveillance.
How to develop a Carbon Finance project?. Assessment of tool - Is this landfill project feasible? Source:
Expert Group Meeting ‘Using Energy Management Standards to stimulate persistent application of Energy Efficiency in Industry’ Alexandre V. MELLO Environmental.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
CD4CDM Suriname, First National Workshop, April 2008 Climate Change and CDM Institutional Architecture Glenn S. Hodes UNEP Risø Center.
CDM implementation in Korea Gyungae Ha Center for Climate Change Mitigation Projects Korea Energy Management Corporation October , AIT, Thailand.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
CLEAN ENERGY MECHANISMS IN CONVENTIONAL POWER GENERATION H.AZOUZ, CDM Project Management Officer at STEG
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
WB Carbon Finance Project Cycle and Role of Key Players Introduction to Carbon Finance March 10, 2004.
Welcome. The legal framework of CDM - UNFCCC, at Rio de Janeiro Earth Summit, Kyoto protocol, CDM, Parties and Benefits Basic requirements.
Capacity Development for CDM - RW4 Tunis, August Capacity Development for CDM General Description of the Project Cycle Tunis, August.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
Good Practice for monitoring plans Viewpoint of a DOE Marco van der Linden, SGS Climate Change Programme
UNFCCC Secretariat Utilizing the existing CDM institutional arrangements for NAMAs Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
L/O/G/O ประเสริฐสุข จามรมาน รองผู้อำนวยการองค์การบริหาร จัดการก๊าซเรือนกระจก ยุทธศาสตร์การเติบโต แบบสีเขียว (Green Growth) 1.
CD4CDM Review of Workshop 1 ….innovating energy solutions…. KITE, SSN & UNEP.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
1 Summary National Workshop Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
Structure of the presentation The origins of CDM What is the CDM? Players of CDM.
Regional perspectives under the Clean Development Mechanism Jose Domingos Gonzalez Miguez, Ministry of Science and Technology, Brazil.
CAPACITY DEVELOPMENT FOR CDM IN VIET NAM Presented by Nguyen Mong Cuong Project CD4CDM - Viet Nam Outline  Overview of project  Project activities and.
Introduction of information note Compilation and analysis of available information on the scope, effectiveness and functioning of the flexibility mechanisms.
Validation and Verification of CDM projects SGS Climate Change Programme Shivananda Shetty Business Manager – SGS India Syed Khursheed Zaidi Operation.
The Role of Designated Operational Entities in the CDM High-Level Roundtable on CDM Reform World Bank Carbon Finance Business Washington, D.C., October.
UNFCCC secretariat, Sustainable Development Mechanisms programme Nashib Kafle, Associate Programme Officer Session 3: The Concept of Programme of Activities.
Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank.
NAMA potential of Vietnam Vuong Xuan Hoa Institute of Meteorology, Hydrology and Environment Ministry of Natural Resources and Environment Climate Change.
Voluntary Emission Reduction (VER) Standards EcoSecurities Carbon Neutral Network on 2Degrees September 2008.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
The standard solutions to improving environmental performance Vicki Gomersall, Product Manager.
Capacity Development for the CDM (CD4CDM) First National Workshop - SURINAM Host Country Institutional Issues Miriam Hinostroza UNEP.
1 CDM institutional framework Maria Netto UNFCCC secretariat Addis Ababa 21 October 2003
CDM –Functional Overview
Clean Development Mechanism
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
DNV experiences and viewpoints
Session 1 Guidelines for projects under Article 6 of the Kyoto Protocol First UNFCCC workshop on implementation of Article 6 projects under the Kyoto Protocol.
Operationalizing Export Certification and Regionalization Programmes
CDM Activity Cycle under the Marrakech Accords
Presentation transcript:

Validation and Verification of CDM Projects Climate Change Kiosk on CDM/DNA, COP9 December 6, 2003 Marco van der Linden SGS Climate Change Programme

2 Contents of presentation Introduction to DOE’s Brief introduction to SGS Input of DOE in the CDM project cycle Validation of CDM projects Monitoring Plan Verification of CDM Projects Final remarks More information and contact details

3 Introduction to DOE’s Kyoto Protocol requires an independent third party to be involved in CDM project cycle Independent party is referred to as a Designated Operational Entity (DOE) DOE is legal entity with two basic functions:  Validation and subsequently request for registration of a proposed CDM project activity  Verification and certification of the emission reductions of a registered CDM project activity Core task of a DOE is to protect the environmental integrity of the CDM and facilitate the trade in emission reductions by providing confidence

4 Brief introduction to SGS SGS is the worlds largest inspection, verification and testing company, providing services in over 140 countries world-wide In house expertise: metering, calibration, laboratories, industrial inspection, environmental impact assessments, air and water quality, land contamination, ISO certification, EMAS Verification….. SGS Climate Change Programme  Started in 1997 with “sinks” projects, since then, expanded into all GHG sectors / all gases  Validated more than 30 potential JI and CDM projects; (preliminary) verification of around 10 potential CDM and voluntary projects

5 Input of DOE in the CDM project cycle Project Developer Project idea Implementation/ Monitoring Verification / certification Validation / registration Write Project Design Document CER DOE Project Developer DOE

6 Validation of CDM projects Projects are required to use a methodology that is approved by the CDM Executive Board to establish the project baseline, additionality and monitoring methodology The purpose of a validation is to have the DOE assess the project design, in particular the use of the approved methodology and the project’s compliance against the requirements of the Marrakech Accords and the host party Main criteria are:  Completeness of documentation  Host country acceptance and host country eligibility  Applicability and correct use of the approved methodology  The project reduces emissions below those in absence of the project  Environmental and social performance  Development of an effective monitoring plan  National and international stakeholder consultation

7 Monitoring Plan During implementation of the project, the project manager will have to monitor the GHG emissions Monitoring plan must show how the data are going to be collected During validation:  The parameters used to predict the emissions will be cross- checked against the monitoring plan to ensure that those parameters which have a very strong influence on the reported results will be collected with the highest accuracy.  The assessment team will be particularly interested to see how data will be collected and how quality of data will be assured. The monitoring plan must also cover environmental and social impacts as required by any Social / Environmental Impact Assessment and any other regulatory requirements

8 Monitoring Plan (cont) During project implementation:  The project managers must collect data exactly as specified in the monitoring plan  The Verifier will verify that the Monitoring Plan has been implemented as specified in the validated Project Design Document Changes to the Monitoring Plan need to be approved by a Validating Operational Entity

9 Verification of CDM projects Verification is the periodic independent review of the monitored project emissions during the implementation period By comparing these with the baseline emissions, it results in an opinion of the number of emission reductions The Verifier “certifies in writing” the number of avoided emissions and submits a Certification Report. At this stage a high level of certainty is required

10 Final remarks DOE has to be independent of the project, this means they can not consult on the development of the project or the writing of the project design document Except for small scale projects, the DOE performing the validation must be different from the DOE performing the verification in order to ensure there is no conflict of interest

11 More information and contact details UNFCCC website: CDM project cycle: Role of DOE: Contact details SGS: Marco van der Linden Tel: +31 (0) Corporate Website: