GPB FY 2015 GRASSROOTS PARTICIPATORY BUDGETING. AGENCY NGA BUDGET DILG5,752,833,715.28 DA4,282,468,270.80 LGSF2,789,061,572.37 DSWD2,717,446,237.27 DEPED1,493,509,100.45.

Slides:



Advertisements
Similar presentations
1 Radio Maria World. 2 Postazioni Transmitter locations.
Advertisements

The Fall Messier Marathon Guide
EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Números.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Real GDP USs Real GDP EUs Real GDP Japans Real GDP.
Name: Date: Read temperatures on a thermometer Independent / Some adult support / A lot of adult support
/ /17 32/ / /
Reflection nurulquran.com.
EuroCondens SGB E.
Worksheets.
Slide 1Fig 26-CO, p.795. Slide 2Fig 26-1, p.796 Slide 3Fig 26-2, p.797.
Slide 1Fig 25-CO, p.762. Slide 2Fig 25-1, p.765 Slide 3Fig 25-2, p.765.
Association Between Use of Bleeding Avoidance Strategies and Risk of Periprocedural Bleeding Among Patients Undergoing Percutaneous Coronary Intervention.
1. 19 F: 9e –, 9p +, 10n 0 Ar-40: 18e –, 18p +, 22n 0 2.a) Al 2 S 3 b) MgO 3.NaF = 4.0 – 0.9 = 3.1: ionic, London. H 2 O = 3.5 – 2.1 = 1.4: dipole-dipole.
1) a) H = 2.06%, S = 32.69%, O = 65.25% b) Ca = 54.09%, O = 43.18%, H = 2.73% 2) 24 x x x.112 = ) a) g/mol, b) g/mol.
Addition and Subtraction Equations
1 When you see… Find the zeros You think…. 2 To find the zeros...
Western Public Lands Grazing: The Real Costs Explore, enjoy and protect the planet Forest Guardians Jonathan Proctor.
Commission Payout Dates Starts Thursday, Ends Wednesday Initials paid 2 weeks later on Thursday Residuals paid out on 20 th of each month Can track sales.
Commission Payout Dates Starts Thursday, Ends Wednesday Initials paid 2 weeks later on Thursday Residuals paid out on 20 th of each month Can track sales.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
1 1  1 =.
1  1 =.
CHAPTER 18 The Ankle and Lower Leg
Summative Math Test Algebra (28%) Geometry (29%)
2.11.
ASCII stands for American Standard Code for Information Interchange
WARM UP What is the value of 4 5 x 4? Explain. WARM UP What is the value of 4 5 x 4 3 ? Explain.
I can interpret intervals on partially numbered scales and record readings accurately ? 15 ? 45 ? 25 ? 37 ? 53 ? 64 Each little mark.
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
HB 1358 Oil & Gas Production Tax Distribution Office of State Treasurer.
The 5S numbers game..
突破信息检索壁垒 -SciFinder Scholar 介绍
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
The basics for simulations
A sample problem. The cash in bank account for J. B. Lindsay Co. at May 31 of the current year indicated a balance of $14, after both the cash receipts.
© 2010 Concept Systems, Inc.1 Concept Mapping Methodology: An Example.
MM4A6c: Apply the law of sines and the law of cosines.
7 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Flexible Budgets, Variances, and Management Control: I Chapter.
The Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DPWH STRATEGIC INFRASTRUCTURE POLICIES AND PROGRAMS 1 Secretary ROGELIO L. SINGSON.
MCQ Chapter 07.
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
Progressive Aerobic Cardiovascular Endurance Run
Solutions to Section 7.1. Prob#Billing Date Previous Balance Finance Charge New Purchases Payments Credits New Balance 38/15$ 600$ 9$ 140$ 100$ /22$
Blue Cross Blue Shield of Kansas Benefits Plan Options.
Visual Highway Data Select a highway below... NORTH SOUTH Salisbury Southern Maryland Eastern Shore.
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
ST/PRM3-EU | | © Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying.
2.10% more children born Die 0.2 years sooner Spend 95.53% less money on health care No class divide 60.84% less electricity 84.40% less oil.
Subtraction: Adding UP
Numeracy Resources for KS2
Stupid Divisibility Tricks Marc Renault Shippensburg University MathFest August 2006.
Static Equilibrium; Elasticity and Fracture
Fractions Simplify: 36/48 = 36/48 = ¾ 125/225 = 125/225 = 25/45 = 5/9
ANALYTICAL GEOMETRY ONE MARK QUESTIONS PREPARED BY:
Resistência dos Materiais, 5ª ed.
Lial/Hungerford/Holcomb/Mullins: Mathematics with Applications 11e Finite Mathematics with Applications 11e Copyright ©2015 Pearson Education, Inc. All.
Doc.: IEEE /0333r2 Submission July 2014 TGaj Editor Report for CC12 Jiamin Chen, HuaweiSlide 1 Date: Author:
UNDERSTANDING THE ISSUES. 22 HILLSBOROUGH IS A REALLY BIG COUNTY.
School Health Profiles (Profiles) 2010 State Results National Center for Chronic Disease Prevention and Health Promotion Division of Adolescent and School.
úkol = A 77 B 72 C 67 D = A 77 B 72 C 67 D 79.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
GRASSROOTS PARTICIPATORY BUDGETING PROCESS: a status report.
Presentation transcript:

GPB FY 2015 GRASSROOTS PARTICIPATORY BUDGETING

AGENCY NGA BUDGET DILG5,752,833, DA4,282,468, LGSF2,789,061, DSWD2,717,446, DEPED1,493,509, DOH1,472,862, DTI614,125, DOLE444,277, DOT348,041, DENR323,508, TESDA296,367, NIA178,701, NEA101,716, DOE84,679, TOTAL20,899,600, BREAKDOWN BY AGENCY

BREAKDOWN BY REGION REGIONPROJECT AMOUNT ARMM 313,920, CAR 964,500, CARAGA 1,004,369, NCR 251,977, REGION I 1,592,098, REGION II 1,159,221, REGION III 1,628,398, REGION IV-A 1,787,500, REGION IV-B 967,500, REGION IX 977,000, REGION V 1,691,589, REGION VI 1,823,810, REGION VII 1,896,375, REGION VIII 1,871,775, REGION X 1,333,107, REGION XI 753,500, REGION XII 882,956, SUB Total 20,899,600,082.04

GPB 2015 Amount per PAP AGENCYPAPAmount (in Million) DALocally Funded Projects4,282.5 NIALocally Funded Projects178.7 DENRNational Greening Program323.5 DEPEDGulayan sa Paaralan Innovative/Abot Alam/ALS No details Repair School Furniture , DILGWater Projects Capdev DILG DILG Other Projects 2, ,022.4

GPB 2015 Amount per PAP AGENCYPAPAmount (in Million) DOEHousehold Electrification Program84.7 DOHEnvironmental and Occupational Health Family Health Health Emergency Management Health Facilities Enhancement Program DTTB and RHPP Infectious Disease Prevention and Control Locally Funded Projects National Pharmaceutical Policy Devt

GPB 2015 Amount per PAP AGENCYPAPAmount (in Million) DOTIndustry Training Planning Product development DSWDKalahi CIDSS Protective Services Sustainable Livelihood Program 1, DTIIndustry Clustering LRED Others One Town One Product Rural Microenterprise Program Shared Service Facility Yaman Pinoy

GPB 2015 Amount per PAP AGENCYPAPAmount (in Million) LGSFIntegrated Community Food Production Core Local Road Other LGU Projects , NEASitio Electrification program Barangay Line Enhancement Program TESDATechnical Vocational Training/Community Based Taining DOLEVarious Projects (Training, Rural Emergency Employment Services, reintegration Services) 444.3