Monday January 16, 2006, Centennial Theatre Landslide Risk Management for Berkley-Riverside Escarpment Presentation to the Community January 16, 2006 Michael.

Slides:



Advertisements
Similar presentations
Risk Management an Element of Loss Control
Advertisements

Ben Poblete HSE Manager / Senior Risk Management Specialist
1 UNIVERSITIES of AUSTRALASIA BENCHMARKING RISK MANAGEMENT BILL DUNNE DIRECTOR RISK MANAGEMENT UNSW. PROUDLY SPONSORED BY UNIMUTUAL.
Medical devices: Application of risk management to medical devices
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
Status of National Effort to Enhance Road Safety in Ethiopia Presented by National Road Safety Coordinating Office 9 th Meeting of the UNRSC, November.
OR 42: County Line Curves Environmental Assessment Purpose and Need February 17, 2009.
A Joint Code of Practice Objectives and Summary Presentation
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Risk Management Introduction Risk Management Fundamentals
EMS Checklist (ISO model)
Comparative Emergency Management
Determining the Significant Aspects
Bush Fire Risk Management Planning Community Participation Department of Lands, National Parks and Wildlife Service, Integral Energy, Rural Fire Service,
Hazard Mitigation Planning I Session Name: Hazard Mitigation Planning I Coastal Hazards Management Course Signed by the President on October 30, 2000 Amends.
Mindari Session Scoutsafe and Risk Management By RL Brian See
1 Los Angeles World Airports | LAX Interim Runway Safety Improvement Project Update of Interim Safety Improvement Planning Presentation to Board of Airport.
Marine Corps Artillery Detachment, Fort Sill Veterans Day 2008 ORM.
RSACRP project - Crash Reduction Road Safety Audit and Crash Reduction Workshop Bandung, 27 & 28 May, 2011 Gerard Neilson VicRoads International Projects.
Chapter 14 Schedule Risk Management Dr. Ayham Jaaron Second Semester 2010/2011.
Erosion. What is it?  Movement of soil materials by the action of water, wind or gravity.
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Project Management Gaafar 2007 / 1 This Presentation is uses information from PMBOK Guide 2000 Project Management Risk Management* Dr. Lotfi Gaafar.
By Andrew Burke, James Ferguson and Chris Silins.
Insert the title of your presentation here Presented by Name Here Job Title - Date Monitoring national casualty trends in Great Britain Jeremy Broughton.
Charles SCAWTHORN Junji KIYONO Kyoto University Earthquake Risk Reduction 3- Mitigation and ERR Program Development 1. Concepts and Terminology 2. Hazard,
RECOVERY and RECONSTRUCTION after the PAKISTAN EARTHQUAKE CHOOSING OPTIONS THAT WILL FACILITATE LONG-TERM RECOVERY FROM THE OCTOBER 8, 2005 DISASTER.
Section Two Collapsing slopes. What is a landslide? soil layer rock layer wet soil Landslide takes place when large masses of loose rocks and soil move.
PPRT PREVENTION DES RISQUES ET LUTTE CONTRE LES POLLUTIONS Safe Communities & a Sustainable Hazaedous Industry : Present and Future Discussion.
© 2000 International Risk Control America, Inc. Risk Management Presentation — 1 International Risk Control America IRCA
Tony Gould Quality Risk Management. 2 | PQ Workshop, Abu Dhabi | October 2010 Introduction Risk management is not new – we do it informally all the time.
Hazard Identification
Environmental Assessment Public Information Meeting – September 2010 Realignment of a Portion of a Utah Lake Drainage Basin Water Delivery System (ULS)
Basics of OHSAS Occupational Health & Safety Management System
ECLAC Disaster Assessment ECLAC Disaster Assessment Training Manual Section V (ii) Coastal Engineering: Reconstruction – Management and Mitigation.
Environmental Health and Safety (EH&S) Supplier Awareness Training ISR Systems Danbury, CT 2011.
Introduction to Risk Management C7 Slide 1. The Concept of Safety  ‘Safety’ refers to the reduction of risk to a tolerable level  Risk = Likelihood.
Adaptation Planning at ODOT ODOT’s Climate Change Adaptation Strategy Report and Future Planning Liz Hormann Sustainability Planner Oregon Global Warming.
Managing Council’s Road Network for Better Outcomes Storm Damage Experience Ian de Bruyne Manager Program Planning & Delivery IPWEA Regional Forum 15 May.
OPERATIONAL RISK MANAGEMENT. The Benefits of Risk Management Reduction in Material and Property Damage. Effective Mission Accomplishment. Reduction in.
Planning for Road Safety George Mavroyeni – Executive Director, Major Projects (former Executive Director, Road Safety and Network Access) May 2011.
MUDSLIDES By, Katie Buchmann Jamie Mello. What is a Mudslide? Predicting Mudslides Damages to towns Safety issues Future decisions Location’s of mudslides.
2013 NWHA CONFERENCE FERC’S RISK-INFORMED DECISION MAKING Doug Johnson – Regional Engineer - Portland From PFMA to Risk Assessment.
Hazards Identification and Risk Assessment
Risk Estimation Two distinct categories of Risies Voluntary Risks e.g. driving or riding in an automobile, and working in an industrial facility. Involuntary.
Risk Management on Tunnelling Projects Warwick University MSc course
The Risk Management Process
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users Advancing Safety through SAFETEA-LU Michael Halladay FHWA Office of.
OHSAS Occupational health and safety management system.
RISK MANAGEMENT FOR COMMUNITY EVENTS. Today’s Session Risk Management – why is it important? Risk Management and Risk Assessment concepts Steps in the.
Mountain Risks: A Marie Curie Research & Training Network J. Corominas and the ‘Mountain-Risks’ research team Department of Geotechnical Engineering.
OHS RISK ASSESSMENT PROCEDURE Title: OHS Risk Assessment Procedure Document Unique Identifier: (Revision 2) Effective date: July 2014.
Hazards: Take Control LANDSLIDE By NEMO Saint Lucia.
Risk Assessment: A Practical Guide to Assessing Operational Risk
Collisions on our Road Network NRA HD 15 Network Safety Ranking Forbes Vigors Project Manager Road Safety National Roads Authority

Roads Operations, Public Works
Ranjan kumar Assistant Manager CCL,Ranchi
Bultfontein Road - Kimberley Slope Stability Evaluation
DEFINITIONS.
Risk management - HIRAC awareness presentation
Quality Risk Management
Environmental Health and Safety (EH&S) Supplier Awareness Training
Seminar on Land Use Planning 24 September – Nicosia Summary
Quantitative Risk Assessment
Presentation to Coachella’s City Council October 8, 2014
Indian and Northern Affairs Canada
Qualitative landslide risk assessment in New Zealand
BHOPAL Industrial Disaster Management Cycle: OECD 2004.
OPERATION & USE RISK ASSESSMENT – OURA
Presentation transcript:

Monday January 16, 2006, Centennial Theatre Landslide Risk Management for Berkley-Riverside Escarpment Presentation to the Community January 16, 2006 Michael Porter, M.Eng., P.Eng. Dr. Matthias Jakob, P.Geo. Dr. K. Wayne Savigny, P.Eng., P.Geo. BGC Engineering Inc.

Monday January 16, 2006, Centennial Theatre What We Know On January 19, 2005 a landslide killed Eliza Kuttner and seriously injured her husband At least 5 other landslides since 1972 all triggered by heavy rainfall Many other locations in the GVRD are subject to landslide hazards not unique

Monday January 16, 2006, Centennial Theatre Hong Kong (1972) Po Shan Road Landslide

Monday January 16, 2006, Centennial Theatre Hong Kong Slope Safety Program Principles of risk management and quantitative risk assessment Manage 58,000 registered slopes Dr. Norbert Morgenstern (U of A) on Advisory Panel Public education program State-of-the-art monitoring Hong Kong is now the world-leader in LRM Australia, California, Seattle, British Columbia Thousands of lives have been saved!

Monday January 16, 2006, Centennial Theatre Berkley Landslide Risk Management Program

Monday January 16, 2006, Centennial Theatre Work Completed to Date Detailed investigations in the vicinity of the January 2005 landslide: escarpment geology assessment of landslide cause assessment of residual risk Glacial Till Fill / Retaining Walls Marine Silt and Sand Colluvium

Monday January 16, 2006, Centennial Theatre Work Completed to Date Along Rest of Escarpment (Current Contract): inventory of past landslides evaluation of landslide-triggering storms rainfall and piezometer monitoring visual inspection and hand-auger drilling quantitative risk assessment

Monday January 16, 2006, Centennial Theatre Landslide Likelihood Estimates > 2 times Average ~ Average < ½ Average Subdivided crest into 75 Increments Rank based on: thickness of fill drainage conditions slope angle evidence of past movement

Monday January 16, 2006, Centennial Theatre Landslide Runout Consequence a function of the angle to the crest of the escarpment Seymour River Crest of Escarpment Landslide Initiation Zone Landslide Deposition Zone 19 o 21 o 23 o 25 o

Monday January 16, 2006, Centennial Theatre Landslide Runout Moderate to high likelihood of damage to homes Low to moderate likelihood of damage to homes Damage possible; mostly sedimentation and flooding Minor flooding >25 o >23 o >21 o >19 o

Monday January 16, 2006, Centennial Theatre Landslide Risk Estimates and Evaluation Potential for fatality at crest and base of escarpment To be safe, a property must pass two tests: risk to individuals must be tolerable societal risks must be tolerable

Monday January 16, 2006, Centennial Theatre Tolerable Risks Within a range society can live with Low, but not zero Less than other risks in everyday life Reduced further if practicable Limits defined in collaboration with the affected Community

Monday January 16, 2006, Centennial Theatre Individual Risk Risk faced by a single individual exposed to one or more landslide hazards Hong Kong: Existing slopes: per year (1:10,000) New development: per year (1:100,000)

Monday January 16, 2006, Centennial Theatre What Does per year Mean? per year = or a 1 in 10,000 chance of fatality per year of exposure Equivalent to average Canadian’s risk from motor vehicle accidents volvocanada.com

Monday January 16, 2006, Centennial Theatre Individual Risk Estimates for Berkley-Riverside Risk > per year 51 properties at base 1 property at crest Risk = to per year additional 56 properties Risk < per year rest of escarpment

Monday January 16, 2006, Centennial Theatre Societal Risk Risk imposed upon the community by a single landslide Hong Kong: F-N Curves

Monday January 16, 2006, Centennial Theatre Societal Risk

Monday January 16, 2006, Centennial Theatre Societal Risk Estimates for Berkley-Riverside Unacceptable Risk 22 source areas ALARP Zone 37 source areas Broadly Acceptable 16 source areas (Hong Kong Criteria) Assigned to the 75 source areas along escarpment crest

Monday January 16, 2006, Centennial Theatre Comments on Risk Estimates They match the historical record calibrated They represent a snapshot in time risk changes over time They do not account for: acquisition of 8 properties affected by the January 2005 landslide improvements to the storm sewer system increased public awareness of the hazards rainfall and piezometer monitoring program

Monday January 16, 2006, Centennial Theatre Monitoring Program

Monday January 16, 2006, Centennial Theatre Work Plan for Risk Reduction More investigation of top rated sites Evaluate viable risk control options: ongoing monitoring and inspection drainage improvements removal of unstable retaining walls removal or recompaction of unstable fills slope reinforcement (new retaining walls; soil nails) Quantify benefit and cost of each option Implement preferred option(s)

Monday January 16, 2006, Centennial Theatre Closing Remarks A risk management program has been initiated consistent with Canadian standards and international best practices Baseline risks have been estimated to prioritise sites for mitigation to facilitate evaluation of risk control options Risks are currently managed through monitoring We have an opportunity to apply best practices, exhibit leadership, and minimise the potential for future tragedy

Monday January 16, 2006, Centennial Theatre Thank You