National Electricity Grid System Interconnected System:  Java-Madura-Bali: 25 GW West & East Indonesia Grid System, there are 5 Interconnection systems:

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

LEUCEMIA MIELOIDE AGUDA TIPO 0
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Welcome to Who Wants to be a Millionaire
Advanced Piloting Cruise Plot.
Supplemental Web Fig. 2 mos10/mos10, grown on 100 mm plate SLAS27 medium, day 1.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
0 - 0.
ALGEBRAIC EXPRESSIONS
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING Think Distributive property backwards Work down, Show all steps ax + ay = a(x + y)
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Welcome to Who Wants to be a Millionaire
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
ZMQS ZMQS
Markku Lappalainen Aalto University Energy and Ecology in Finland.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
Treasure Map By: Gage Gwin Haven Beagle START. Step 1 23 tiles south CONTINUE.
ABC Technology Project
© S Haughton more than 3?
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
VOORBLAD.
Twenty Questions Subject: Twenty Questions
Linking Verb? Action Verb or. Question 1 Define the term: action verb.
Squares and Square Root WALK. Solve each problem REVIEW:
Energy & Green Urbanism Markku Lappalainen Aalto University.
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
U.S./N.C. Quiz What are the state colors? What is the state capital?
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Addition 1’s to 20.
25 seconds left…...
Equal or Not. Equal or Not
Slippery Slope
Test B, 100 Subtraction Facts
1 Atlantic Annual Viewing Trends Adults 35-54, Total TV, By Daypart Average Minute Audience (000) Average Weekly Reach (%) Average Weekly Hours Viewed.
11 = This is the fact family. You say: 8+3=11 and 3+8=11
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Figure Essential Cell Biology (© Garland Science 2010)
Map of Indonesia Total area: 1,919,317 Km2 Number of Islands: more than 13,000 The largest archipelago country in the world About 300 ethnic groups and.
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
How Cells Obtain Energy from Food
Presentation transcript:

National Electricity Grid System Interconnected System:  Java-Madura-Bali: 25 GW West & East Indonesia Grid System, there are 5 Interconnection systems: 2.Sumatra: 4.2 GW, 3.West Kalimantan: 186 MW, 4.South, Central, East Kalimatan: 650 MW), 5.North Sulawesi and Gorontalo: 250 MW, 6.South Sulawesi: 728 MW, which will become South, West South East Sulawesi in 2012.

Isolated Grid With Peak Load > 50 MW: 1.Bangka, 2.Lombok, 3.Tanjung Pinang, 4.Palu.

Isolated Grid With Peak Load: MW: (1) Jayapura, (2) Sorong, (3) Ambon, (4) Ternate, (5) Kupang, (6) Sumbawa, (7) Bima, (8) Luwuk, (9) Gorontalo, (10) Kendari, (11) Kolaka, (11) Bau-Bau, (12) Bontang, (13) Sampit, (14) Pangkalan Bun, (15) Sintang, (16) Ketapang, (17) Belitung, (18) Rengat, (19) Tanjung Balai Karimun, (20) Sungai Penuh, (21) Takengon, Meulaboh

Isolated Grid With Peak Load: 1 – 10 MW There are thousands of them. Subdistrict Capital City With Peak Load: < 1 There are thousands of them. Small Town and in the Villages

Consequences of Having those Thousands Isolated Systems  Avoided cost or BPP are huge different between grids. Highest: IDR 3.300/kWh in the Maluccus: Lowest: IDR 900/kWh in West Java. These figures are average figures for each region: an average cost large, medium and micro grids in the region. Micro grid with peak load < 1 MW Located in remote place. Consist of 1 diesel genset or several diesel gensets within capacity of tens or hundreds kW. Avoided cost could be > IDR Rp. 5,000/kWh.