Off-site storage options Rail 101

Slides:



Advertisements
Similar presentations
Created by Gwendolyn Best
Advertisements

Railcar 101 The Basics of Railcars: Car Types, Components and Rules
Introduction to INTTRA-Act Booking Q Proprietary and Confidential Copyright © 2005 INTTRA Inc. 2 INTTRA and Ocean Logistics Execution Notifications.
Accredited Supplier Communications Plan FY09-10 Q1 to Q4 May 2009, v2.0 Home Access Marketing & Stakeholder Engagement Team.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 75.
Electricity and Natural Gas Supply, Reserves, and Resource Adequacy CMTA Energy Conference Energy: Growing Californias Economy William J. Keese California.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
Doc.: IEEE /0008r2 Submission March 2006 Steve Shellhammer, QualcommSlide 1 EC Summary of PAR Development Notice: This document has been prepared.
UNITED NATIONS Shipment Details Report – January 2006.
Performance of Hedges & Long Futures Positions in CBOT Corn Goodland, Kansas March 2, 2009 Daniel OBrien, Extension Ag Economist K-State Research and Extension.
February, 2010 LEA Support Advisory Council. Agenda 2:30-3:00Discuss plan revision process (feedback and support) 3:00-3:30Discuss February workshops.
2006 Preliminary AYP Release. Overview 1. State Summary Results 2. Update of Preliminary AYP Data 3. Schedule for Appeals and Final Release 4. Overview.
0 - 0.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
Addition Facts
Writing times in digital

Year End T&L and Leave Processing December 9, 2004 SSW Auditorium Presented by Susan Beckerman.
Year-end Planning Key Changes Accruals Receiving P-Cards Roles/Responsibilities Handout Year-end calendar 1.
The Rest of EDI - International and Transportation/Logistics.
Richmond House, Liverpool (1) 26 th January 2004.
Student & Work Study Employment Facts & Time Card Training
KRONOS COMPENSATORY TIME AND.
Break Time Remaining 10:00.
Day of the week 9:00 – 10:00 10: :00 12: :00 13: :00 14: :00 15: :00 16:00 – 17:00 17: :00 18:00 – 19:00 19:00 – 20:00.
Leading Change. Leading Learning. Transforming Our District for Student Success. Finals Schedule H ALF D AYS.
2007 Pearson Education, Inc. All rights reserved C Structures, Unions, Bit Manipulations and Enumerations.
Shakopee Tennis Association
Program Overview: Florida Atlantic University Travel Management Program.
Discrete Event (time) Simulation Kenneth.
Three Key Process Measures: Flow Rate
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Customize Your View of Data Training Presentation for Supply Chain Platform: BAE Systems July 2012.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Created by Susan Neal $100 Fractions Addition Fractions Subtraction Fractions Multiplication Fractions Division General $200 $300 $400 $500 $100 $200.
We are learning how to read the 24 hour clock
1..
OUR PLAN Expand our program options to serve our families better in
OUR PLAN Expand our Kindergarten program options and offer before and afterschool child care to serve our families better in
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
School Census Summer 2010 Headlines 1 Jim Haywood Product Manager for Statutory Returns Version 1.0.
: 3 00.
5 minutes.
Types of clocks. Types of clocks Sand clock or Hourglass clock.
1. 2 No lecture on Wed February 8th Thursday 9 th Feb Friday 27 th Jan Friday 10 th Feb Thursday 14: :00 Friday 16:00 – 19:00 HS N.
1 Union Pacific Railroad You will need a myUPRR User ID to view Chargeable Events on the UP Web site. If you have a User ID, go to
Bell Schedules Club Time is available from 8:05-8:20  1 st 8:20 – 9:15  2 nd 9:20 – 10:10  3 rd 10:15 – 11:05  4 th 11:10 – 12:50 A(11:10)
Chapter 15: Quantitatve Methods in Health Care Management Yasar A. Ozcan 1 Chapter 15. Simulation.
Fundamentals of Cost Analysis for Decision Making
Clock will move after 1 minute
PSSA Preparation.
09:00 – 13:00h 13:00 – 17:00h 17:00 – 21.00h 20:00 – 22:00h TRAINING ROUND AMBIENT MUSIC TRAINING ROUND DJ “CHERYL DANGER” SUNDAY 20th AGENDA Approximate.
FINAL EXAMINATION SCHEDULE SPRING 2009 MAY 15 – MAY 22 NOTE: A class that meets at more than one of the times on this final examination schedule will take.
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Introduction into Simulation Basic Simulation Modeling.
Lecture 12 Compound Interest Ana Nora Evans 403 Kerchof Math 1140 Financial Mathematics.
CN – Brampton International Terminal ‘Best Practice’ Seminar Toronto, February 9, 2006.
Presentation transcript:

CN Brampton Import Storage 9 February 2006 (revised 31 March 2006)

Off-site storage options Rail 101 Agenda Backgound Import storage policy Off-site storage options Rail 101 - 1 -

Background The rapid growth in international trade is placing a strain on all components of the supply chain - 2 -

Background 26% 27% 35% 17% 30% - 3 -

Background 140% Growth - 4 -

Background CN is positioning itself, and thereby positioning its customers, to capitalize on this growth Expansion of operating hours Provision of reserved capacity Terminal expansion CN’s Brampton storage policy is designed to create the capacity for CN’s customers to continue growing Brampton is a cross-dock facility Storage is offerred where land is not required for primary operations Customers are better served by ensuring their costs are related to the infrastructure they consume - 5 -

Import storage – one free day, thereafter $200/day or part thereof Import Storage Policy Import storage – one free day, thereafter $200/day or part thereof Day of availability Day after availability 07:00 the next day Day 0 Day 1 Day 2 Day 3 07:00 07:00 Import Available Day of Availability Free Day $200 $400 - 6 -

Day of Availability plus Two Days for $125 Off-Site Storage Options CN provides lower cost off-site storage options for customers unable to pick up their imports upon arrival $125 for up to 2 days of storage Day of availability, next two days, up to 07:00 the next day $75 for each additional 24 hours or part thereof Excludes Dangerous Goods, running reefers, containers not released by Canada Customs Containers without a pick up appointment at the time of grounding will be moved to off-site storage Alternatively importers may select from a variety of service providers who will remove an import form CN Brampton within the free time and store it until the importer is ready to receive it Day 0 Day 1 Day 2 Day 3 07:00 07:00 Import Available Brampton Day of Availability Free Day $200 $400 Misc Day of Availability Day of Availability plus Two Days for $125 $125 + $75 - 7 -

TD Vancouver Waterfront Appointment system opens for Friday Rail 101 Import trains: Halifax – daily departure 20:05 Atlantic, arrival 02:30 day 2 (30h transit), pad 03:45 Montreal – daily departure 07:15 Eastern, arrival 17:35 (10h transit), pad 02:30 day 1 Deltaport – daily departure 03:00 Pacific, arrival 03:20 day 4 (93h transit), variable pad Vancouver waterfront – daily dearture 20:00 Pacific, arrival 09:30 day 5 (106h transit), pad 16:00 day 5 Port loading patterns, ETA availability Booking appointments Import must have a published availability Loaded vs moving Appointment system must be open Import Available Brampton TD Vancouver Waterfront TA Brampton Sunday Monday Tuesday Wednesday Thursday Friday Appointment system opens for Friday TD Halifax TA Brampton Import Available Brampton - 8 -

Rail 101 Pad Availability To assist the importer with planning their pick up CN will update its systems with an anticipated “pad availability” by noon the day before scheduled placement This will enable an importer to arrange/comfirm their pick up with the importer - 9 -

Intermodal Shipment Status Rail 101 Intermodal Shipment Status - 10 -

Rail 101 Points to Note: Scheduled placement is generally conservative Designed to ensure availability by listed time If no appointment is made prior to grounding the import will be moved off-site To ensure import remains at Brampton do not wait until day of placement to make appointment Appointment may be made when import dispays ETA Reconfirm after pad availability is displayed An alert will be sent to the registered email address if pad availability precludes appointment from being fulfilled Certain circumstances may prevent an import being available immediately at scheduled pad placement. To prevent a dead run: Monitor actual pad availability when scheduling tight Plan pick up for the free day - 11 -

Rail 101 Considerations: If CN has not provided a scheduled pad availability by noon the day before, the import will continue to have two free days Storage clock will begin with the later of scheduled pad availability or actual availability If an appointment cannot be fulfilled due to rescheduling/late pad placement the import will continue to have two free days - 12 -

Rail 101 Storage: Any party that will guarantee storage should be set up to do so on line At the present time, storage may only be guaranteed once the container grounds - 13 -