RPG: September 24, 2013 1 Approach for ERCOT Independent Review of the 2013 Houston Import Project Jeff Billo, Manager, Transmission Planning September.

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

The Midwest ISO from a Transmission Owner Perspective.
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
Market Interface Committee Recent Regulatory Activities Philip Tice October 14, 2011.
FPSC Ten Year Plan Workshop Nuclear Panel Steven Scroggs Senior Director, Project Development Florida Power & Light Company August 15, 2007.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
Gas-Electric Coordination Update JGC Meeting August 23-24, 2012.
Cleco Transmission Planning Summit Attachment K November 15, 2007 Terry Whitmore.
Houston Region Import Capacity Project Planning for Reliable Power.
Al McBride MANAGER, AREA TRANSMISSION PLANNING Existing Import Interfaces: Transmission Transfer Capabilities and The Calculation of Tie Benefits DECEMBER.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Regional Planning Group Project
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Modeling Choices & Approaches Key Model Outputs: Carbon emissions Other emissions Electricity prices Total electricity system costs Fuel use and diversity.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
Navarro to Houston Presentation to ERCOT RPG August 27, 2013.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
Valley Import Overview Jeff Billo Regional Planning Group Meeting July 22, 2014 Preliminary1.
SLIDE 1 AEMO INDEPENDENT ASSESSMENT OF NSW & TAS NETWORKS July 2014 PRESENTED BY NATIONAL PLANNING.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
PROJECT NO PUCT STAFF WORKSHOP 11/19/14 Julia Harvey Kristi Denney Kevin Mathis Jasmin Thevaril.
RPG Meeting Five Year Plan Extension Brad Schwarz.
OSC Meeting April 27, Transmission Cost Allocation Overview.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
March 13, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
POWER SYSTEM PLANNING CHARTER AND PROCESSES UPDATES Presentation to TAC Sept 9, 2004 Transmission Services Ken Donohoo, Manager of System Planning
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
April 16, 2010 RPG Meeting Lamesa Area Upgrades ERCOT Independent Review Jeff Billo.
2008 Annual Five Year Plan Update 2 10/12/2007 Regional Planning: Jay Teixeira, Harry Liu, Brad Schwarz, Jeff Billo, Chris Ngai.
June 2008 Windsor-Essex Electrical Service Needs and Solutions.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
Jeff Billo Manager, ERCOT Transmission Planning Kenedy to Nixon to Seguin Line Upgrade Project Regional Planning Group (RPG) Review; ERCOT Independent.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
Long Term Study Task Force Update ERCOT Long-Term Study Scenarios January 13, 2012.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
Impacts of Environmental Regulations in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT January 26, 2016.
LCRA TSC/ CPS Energy Transmission System Addition Regional Planning Group Project Jeff Billo Sr. Manager, Transmission Planning TAC ERCOT Public March.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
May 15, 2009 Regional Planning Group CREZ Implementation Study Update Warren Lasher Manager, System Assessment.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
ERCOT – MISO DC Tie Study Comments
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
PLWG Report to ROS September 4, PGRR039 PGRR requires Interconnecting Entities (IEs) to provide information for ERCOT’s resource adequacy reports,
POWER SYSTEM PLANNING CHARTER AND PROCESSES Presentation to TAC May 6, 2004 Transmission Services Ken Donohoo, Manager of System Planning Dan Woodfin,
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
CREZ Related Generation Interconnection Studies July 2008 Jeff Billo RPG meeting
August 24, 2007 ERCOT Regional Planning Group Meeting CREZ Transmission Optimization Study Warren Lasher System Assessment.
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
June 11, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
Response to TAC Questions on PGRR031 TAC– January 28, 2014 Jeff Billo, ERCOT 1.
ERCOT – MISO DC Tie Study Regional Planning Group November 20, 2015.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
2016 LTSA Update Doug Murray 6/21/2016. Agenda Introduction Scenario Retirement Process Scenario Summary Results Appendix.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
1 ERCOT 2015 West Texas Study November 18, 2014 Jeff Billo.
Houston Import Project – ERCOT Independent Review
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Houston Import Study Update
Freeport Area Master Plan Project -
Transmission Planning in ERCOT- Overview
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Warren Lasher Manager, Long-Term Planning and Policy
Presentation transcript:

RPG: September 24, Approach for ERCOT Independent Review of the 2013 Houston Import Project Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group

RPG: September 24, CenterPoint Energy, Garland Power and Light/ Cross Texas Transmission, and Lone Star Transmission independently identified a reliability need to increase the import capability into the Houston area by 2018 –Each submitted a project proposal to the Regional Planning Group (RPG) in July/ August 2013 –The projects received a large number of comments from stakeholders ERCOT will conduct one combined Independent Review of the project proposals The following slides discuss the proposed approach to the ERCOT Independent Review Background

RPG: September 24, Is there a reliability criteria violation due to Houston power imports? a)What are the study assumptions? 2.If there is a criteria violation, what is the best project set to solve the problem? a)What options should be studied? b)What is the capital cost estimate for each option? c)What is the levelized cost of each of the options? i.Consider the transfer capability of each option (including voltage stability) ii.Consider the impact of Category C and D contingencies iii.Consider what additional projects may be needed for reliability over the next X years iv.Consider staging the project v.Consider the congestion-related impact d)What sensitivities affect the project selection? i.Consider older generation retiring Questions to be answered during the ERCOT IR

RPG: September 24, Are there non-transmission alternatives that can solve the criteria violation? a)Generation b)Demand Response 4.Should ERCOT designate the project “critical to reliability?” Questions to be answered during the ERCOT IR

RPG: September 24, Is there a reliability criteria violation due to Houston power imports? a)What are the study assumptions? Latest 2018 SE case from the 2013 Regional Transmission Plan (RTP) –Contains more up-to-date load forecast than cases used in project submittals –Cobisa and Pondera King plants are not included in model Both plants have interconnection agreements from several years ago but have not provided financial commitment to move forward –Deepwater Energy Storage, Deer Park Energy Center, Channel Energy Center plants are in the model –All contingencies and assumptions consistent with the 2013 RTP ( –Generator outage contingencies will include Cedar Bayou 2, STP (1 unit), Frontier, Gibbons Creek (for G-1 + N-1 contingency analysis) Question 1

RPG: September 24, If there is a criteria violation, what is the best project set to solve the problem? a)What options should be studied? ERCOT will review all options submitted in the three RPG proposals and studied in the 2012 Long-Term System Assessment –Options may be eliminated based on submitted reports –Options may be eliminated throughout the study process –Options may be added based on ERCOT judgment Question 2a

RPG: September 24, If there is a criteria violation, what is the best project set to solve the problem? b)What is the capital cost estimate for each option? ERCOT will use an estimate provided by the Transmission Owner for the upgrade of existing facilities ERCOT will use a per mile estimate based on CenterPoint Energy’s detailed cost estimates for new 345 kV line construction –Generally higher and more conservative estimate –CenterPoint Energy has experience with constructing 345 kV lines in the Houston area ERCOT will work with TSPs on developing appropriate cost estimates for 500 kV facilities Question 2b

RPG: September 24, If there is a criteria violation, what is the best project set to solve the problem? c)What is the levelized cost of each of the options? i.Consider the transfer capability of each option (including voltage stability) ii.Consider the impact of Category C and D contingencies iii.Consider what additional projects may be needed for reliability over the next X years iv.Consider staging the project v.Consider the congestion-related impact Question 2c

RPG: September 24, ERCOT will calculate the transfer capability of each option ERCOT will study the impact of Category C and D contingencies for each option ERCOT will determine what year the area load is projected to exceed the import transfer capability with the proposed upgrade Question 2c continued

RPG: September 24, If import capability will be exceeded by 2028 the cost of additional upgrades needed by 2028 will be quantified and included in the analysis –Comments to the Brattle Group in regards to their review of ERCOT’s Long-Term Study earlier this year indicated that not all stakeholders are comfortable yet with a 20-year planning horizon –Considering history and the magnitude of the scope of the options (in terms of expense and landowner impact), 15 years (10 years after project in-service date) seems to be an appropriate horizon to analyze If import capability exceeds 2028 load levels, no additional upgrade costs will be included in the levelized cost estimate Note: use of levelized cost estimates is limited to aiding in the selection of the option that best meets the long- term needs for the area. Project justification will strictly follow the ERCOT Protocols and Planning Guide Question 2c continued

RPG: September 24, ERCOT will consider if a project can be staged and the effect that may have on the levelized cost ERCOT will consider congestion-relief related benefits that the studied options provide Question 2c continued

RPG: September 24, If there is a criteria violation, what is the best project set to solve the problem? d)What sensitivities affect the project selection? i.Consider older generation retiring ERCOT will conduct a sensitivity to determine the levelized cost of the options from a reliability perspective if gas generation older than 50 years (throughout ERCOT) were to retire (perhaps requiring additional upgrades by 2028) Question 2d

RPG: September 24, Are there non-transmission alternatives that can solve the criteria violation? a)Generation b)Demand Response If there is a reliability criteria violation ERCOT does not have the authority to compel generation additions or to compel load to participate in demand response ERCOT may include a discussion in the final report on the effect resource additions in the Houston area may have on deferring transmission improvements –However, CenterPoint Energy’s report showed that new generation additions have been offset by generation retirements. Given the age and efficiency of the generation fleet in the area it is not unreasonable to expect this trend to continue Question 3

RPG: September 24, Should ERCOT designate the project “critical to reliability?” See PUCT Substantive Rule (b)(3)(D) ERCOT will consult with the designated transmission providers at the end of the review to determine if the project can be constructed in time to meet the need without the critical designation If it cannot, ERCOT will pursue the critical designation for portions of the project requiring a Certificate of Convenience and Necessity Question 4

RPG: September 24, The approach presented in this presentation is draft and subject to change based on ERCOT and stakeholder review Please submit any comments to: Jeff ERCOT has begun to work on Question 1 Updates will be provided at future RPG meetings Next Steps

RPG: September 24, Comments or Questions?