Making Clean Local Energy Accessible Now December 16, 2013 Flattening the Duck Dynamic Grid Solutions for Integrating Renewables.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Who Wants To Be A Millionaire?
Demand Response in Ontario Paul Grod, CEO, Rodan Energy July 11, 2013.
Welcome to Who Wants to be a Millionaire
Slide 1 Insert your own content. Slide 2 Insert your own content.
1 Chapter 40 - Physiology and Pathophysiology of Diuretic Action Copyright © 2013 Elsevier Inc. All rights reserved.
Recent Successes in Demand Response
Electricity and Natural Gas Supply, Reserves, and Resource Adequacy CMTA Energy Conference Energy: Growing Californias Economy William J. Keese California.
WORKSHOP ON UTILITY WIND INTEGRATION STUDIES: MODELS AND METHODS Panel 6 – Base Load Unit Cycling Costs Gene Danneman P.E. June 24 & 25, 2010.
Modeling Tres-Amigas Modeling Work Group Meeting August 27, 2009 WECC Staff.
Pacific Gas and Electric Company Long Term Procurement Plan Proceeding Renewable Integration Model Results and Model Demonstration October 22, 2010 Workshop.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
NECPUC SYMPOSIUM Concurrent B Natural Gas Conditions Facing New England Mark R. Babula ISO New England Inc. Supervisor - Power Supply & Reliability June.
FPSC Ten Year Plan Workshop Nuclear Panel Steven Scroggs Senior Director, Project Development Florida Power & Light Company August 15, 2007.
0 - 0.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Editing Instructions Simply add a question and 4 possible answers by overtyping the white text. The green box on the next slide shows which answer should.
Welcome to Who Wants to be a Millionaire
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Welcome to Who Wants to be a Millionaire
Welcome to Who Wants to be a Millionaire
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
Smart Metering,AMI & Meter Data Management – Components of a Smart Grid by Tony Ithier SIEMENS.
WELCOME! Meridian Township Data Review Jan 25,
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
Electricity supply contracts CLIC Workshop 04/02/2014 F. Duval.
TIM MASON RENEWABLE RESOURCE INTEGRATION IEP ASSOCIATION ANNUAL MEETING FALLEN LEAF LAKE 5 October 2011.
Highlights of the 2003 New York ISO State of the Market Report David B. Patton, Ph.D. Potomac Economics Independent Market Advisor April 14, 2004.
Saving Energy In Schools Okehampton College - Devon.
1 Proprietary & Confidential © 2012 BrightSource Energy, Inc. All rights reserved. © BrightSource Energy, Inc. All rights reserved. 1 Ivanpah.
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
Can Renewable Energy Solve the Climate Problem? Geoffrey Heal Columbia Business School October
Canada Committed to a Nuclear Future Presented to the 15 th Pacific Basin Nuclear Conference by Milton Caplan President, MZConsulting Inc October.
New England Developments in Demand Response and Smart Grid 2010 National Town Meeting on Demand Response and Smart Grid Henry Yoshimura, Director, Demand.
Take from Ten First Subtraction Strategy -9 Click on a number below to go directly to that type of subtraction problems
Probabilistic Volatility in the Western Interconnection Matthew Elkins.
Study Results Common Case Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the results of the 2022 Common Case.
Created by Susan Neal $100 Fractions Addition Fractions Subtraction Fractions Multiplication Fractions Division General $200 $300 $400 $500 $100 $200.
Energy & Green Urbanism Markku Lappalainen Aalto University.
“A Transformation to Smart Grid”
The Australian Renewable Energy Agency and the New Energy Course Argus Australia Power Generation Fuels 27 February 2013.
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Addition 1’s to 20.
25 seconds left…...
Equal or Not. Equal or Not
Slippery Slope
Test B, 100 Subtraction Facts
EnvironmentEnvironnementCanada Nusa Dua, Bali, Indonesia September 5 – 7, Part 4: LFG Utilization.
Week 1.
California Energy Commission 1 Energy Workshops for W&WW Agencies UTILITY STRATEGIES FOR SHIFTING PEAK DEMAND PERIOD WATER & ENERGY USE REGIONAL STRATEGIES:
Energy Storage on the Grid: Informing Future Development Eric Hittinger Advisors: Jay Whitacre, Jay Apt Department of Engineering and Public Policy Carnegie.
We will resume in: 25 Minutes.
1 Unit 1 Kinematics Chapter 1 Day
Taina Wilhelms 1 ENERGY YEAR 2010 Finnish Energy Industries
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Out of Region Market Assumptions Resource Adequacy Technical Committee April 6 th, 2011.
Energy Year 2014 Electricity Finnish Energy Industries.
Investigating a Higher Renewables Portfolio Standard In California Power Association of California Symposium May 20, 2014 San Francisco, CA Nancy E. Ryan.
Electric Rates and Standby Charges Presented by: Cheryl Eakle – KPPC Jason Volz – Harshaw Trane August 13, 2014.
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
Achieving 50 percent renewable electricity in California: The role of non-fossil flexibility in cleaning the electricity grid Jimmy Nelson, Ph.D. Energy.
Scenarios for a South African peaking CSP system in a short term Stellenbosch University Energy Postgraduate Conference 2013 Cebo Silinga Supervisor: Paul.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
Updated Energy Year 2011 Electricity Finnish Energy Industries
Shaping Up The Duck Chart Independent Energy Producers Association Annual Meeting Mark Rothleder Vice President, Market Quality and Renewable Integration.
Forecasting and Operations CAISO Case
Jim Mcintosh Director, Executive Operations Advisor California ISO
Presentation transcript:

Making Clean Local Energy Accessible Now December 16, 2013 Flattening the Duck Dynamic Grid Solutions for Integrating Renewables

Making Clean Local Energy Accessible Now 2 The California ISO Duck Chart (2012 – 2020) 5,300 MW 8-11am Potential over-generation Potential over-generation 13,100 MW 5-8pm

Making Clean Local Energy Accessible Now 3 CAISO Duck Chart (2020 Issues) 5,300 MW 8-11am Potential over-generation Potential over-generation 13,100 MW 5-8pm

Making Clean Local Energy Accessible Now 4 Flatten the Duck – Import/Export Import/Export

Making Clean Local Energy Accessible Now 5 Flatten the Duck – Curtail Baseload Generation Rather than address over-generation with more natural gas generation, California can strategically plan maintenance on baseload plants during shoulder months. Source: CAISO Summer Loads and Resources Assessment CAISO planned outages ranged up to 7000 MW per weekday in the summer of 2012.

Making Clean Local Energy Accessible Now 6 Flatten the Duck – Demand Response Demand Response

Making Clean Local Energy Accessible Now 7 Addressing the Duck Chart with Energy Storage Energy Storage

Making Clean Local Energy Accessible Now 8 Addressing the Duck Chart with Curtailment Curtailment

Making Clean Local Energy Accessible Now 9 Flattening the Duck: All Solutions

Making Clean Local Energy Accessible Now Back-up Slides

Making Clean Local Energy Accessible Now 11 Import/Export Assumptions

Making Clean Local Energy Accessible Now 12 Import/Export Assumptions Source: CAISO 2013 Summer Loads & Resources Assessment (May 6, 2013) 2012 Peak Daily ISO Imports = ~11,500 MW

Making Clean Local Energy Accessible Now 13 Demand Response Assumptions

Making Clean Local Energy Accessible Now 14 Energy Storage Assumptions

Making Clean Local Energy Accessible Now 15 Curtailment Assumptions

Making Clean Local Energy Accessible Now 16 CAISO Duck Chart (2020 vs. 2013) Lowest net load: 11,700 MW around 1pm Highest net load: 25,000 MW at 8pm

Making Clean Local Energy Accessible Now 17 Natural Gas Plants Have Integration Costs Renewables have predictable variability. Fossil fuel power plants often shut down unexpectedly, forcing energy consumers to foot the bill for reserves and frequency response. Source: CAISO Summer Loads and Resources Assessment More than half of the outages associated with conventional generation are unplanned.