© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 1 Online simulation of gas distribution networks Peter Aymanns, Stadtwerke Düsseldorf.

Slides:



Advertisements
Similar presentations
Requirements Engineering Processes – 2
Advertisements

Zhongxing Telecom Pakistan (Pvt.) Ltd
Chapter 12 Keynesian Business Cycle Theory: Sticky Wages and Prices.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
Curtis Johnson Process Control Instrumentation Technology, 8e]
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
Create an Application Title 1A - Adult Chapter 3.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
Projects in Computing and Information Systems A Student’s Guide
Refrigeration Cycles د/ محمود عبدالوهاب.
Solve Multi-step Equations
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Week 2 The Object-Oriented Approach to Requirements
Selecting an Advanced Energy Management System May 2007 Chris Greenwell – Director Energy Markets Scott Muench - Manager Technical Sales © 2007 Tridium,
Spring 2008, King Saud University Cash Flow Analysis Dr. Khalid Al-Gahtani 1 Payment schedule Materials Mobilization Monthly payments Final Payment Contract.
PP Test Review Sections 6-1 to 6-6
EU market situation for eggs and poultry Management Committee 20 October 2011.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
Chapter 11 AC Power Analysis
Gas Quality E.ON Gastransport SIMONE Congress 2008, Dubrovnik Jörg Bödeker, Dr. Dietrich Weise.
VOORBLAD.
1 Review of AC Circuits Smith College, EGR 325 March 27, 2006.
Identifying Our Own Style Extended DISC ® Personal Analysis.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
City Council Meeting Agenda Items October 28, 2013.
DB analyzer utility An overview 1. DB Analyzer An application used to track discrepancies and other reports in Sanchay Post Constantly updated by SDC.
CS 240 Computer Programming 1
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Equal or Not. Equal or Not
Slippery Slope
Januar MDMDFSSMDMDFSSS
Chapter 10: The Traditional Approach to Design
Analyzing Genes and Genomes
Systems Analysis and Design in a Changing World, Fifth Edition
1 Titre de la diapositive SDMO Industries – Training Département MICS KERYS 09- MICS KERYS – WEBSITE.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Employment Ontario Literacy and Basic Skills Performance Management Reports Training For Service Providers.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Energy Generation in Mitochondria and Chlorplasts
Introduction to ikhlas ikhlas is an affordable and effective Online Accounting Solution that is currently available in Brunei.
FIGURE 3-1 Basic parts of a computer. Dale R. Patrick Electricity and Electronics: A Survey, 5e Copyright ©2002 by Pearson Education, Inc. Upper Saddle.
Presentation transcript:

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 1 Online simulation of gas distribution networks Peter Aymanns, Stadtwerke Düsseldorf Netz GmbH, Düsseldorf Andreas Stolte, Dirk Wilms, Wolfgang Dörner, PSI AG, Aschaffenburg 9 th SIMONE Congress, October 15-17, 2008, Dubrownik, Croatia

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 2 Contents Introduction Network control at Düsseldorf Cityworks Why online network calculations? System integration Example scenarios Summary

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 3 Network control at Düsseldorf Cityworks Drinking water network 7 pressure zones 1,740 km total length, 73,700 buildings connected 55,369,000 m³/year sales, 212,760 m³/day max. District heating network 3 network sections 183 km total length, 4,950 delivery stations 1.6 GWh sales

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 4 Network control at Düsseldorf Cityworks Electrical power network High, medium and low voltage 9418 km system length, approx. 83,500 buildings connected 4.4 TWh/year sendout; 750 MW peak load Street lightning About 62,000 electric and 17,000 gas lights

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 5 Network control at Düsseldorf Cityworks Gas network High-pressure: 20 bar, 4 bar, medium-pressure 900 mbar, low-pressure 42 mbar 1,456 km total length, approx. 54,100 buildings connected, 121,000 meters 7.0 TWh/year sendout (domestic and commercial), 39.4 GWh/d max. day 4.0 – 5.0 TWh/year power plant gas 9 transfer stations, about 270 gas metering and pressure regulating stations Gas family: Enriched low-BTU gas Pressure regulation, no variation of linepack or storage

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 6 Network control at Düsseldorf Cityworks Combined control center From 2000 merger of the control rooms 2004 to 2005, control centre staff from different sectors were trained together (Simone was used as a training simulator) ‏ Since 2006 staff of the various sectors work interactively

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 7 Combined energies control room of Stadtwerke Düsseldorf

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 8 Why online network calculations? Decision-making tool in the evaluation of complex network operations Planned or unplanned closing of network sections Planned or unplanned closing or partial closing of gas metering and pressure regulating stations Pressure adjustment in the networks Monitoring of load flow

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 9 Why online network calculations? Aims in operational management Review of the supply situation for proposed closures Establish the control variables for controlling Evaluate the impacts of changes in the network switching status Provide information about abnormal conditions in current operations

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 10 Why online network calculations? Why integrated calculation Uniformity for all devisions Reduction of various software applications No interfaces to transfer the dynamic operational data No double data maintenance work Intuitive handling of the calculation within uniform user interface Simple integration of calculation results into operational decisions Available and applicable at all times

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 11 System integration

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 12 Any Data is put in only once Data import from third-party systems Integrated total system, i.e. Highly efficient, faultless data engineering Extreme dynamics Consistent operation and visualization System integration Complete integration Static Data-Models for SCADA, Simulation, Optimization, etc. Shared real-time Database Integrative static Data-Model SCADA-Functions Simulation Optimization etc. Geografic plans Schematic plans Station figures Trend charts Specific figures Lists generator Import from GIS, SAP IS-U MMI OperatingProcess Data

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 13 Any Data is put in only once Data import from third-party systems Integrated total system, i.e. Highly efficient, faultless data engineering Extreme dynamics Consistent operation and visualization System integration Complete integration Static Data-Models for SCADA, Simulation, Optimization, etc. Shared real-time Database Integrative static Data-Model SCADA-Functions Simulation Optimization etc. Geografic plans Schematic plans Station figures Trend charts Specific figures Lists generator Import from GIS, SAP IS-U MMI OperatingProcess Data

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 14 Any Data is put in only once Data import from third-party systems Integrated total system, i.e. Highly efficient, faultless data engineering Extreme dynamics Consistent operation and visualization System integration Complete integration Static Data-Models for SCADA, Simulation, Optimization, etc. Shared real-time Database Integrative static Data-Model SCADA-Functions Simulation Optimization etc. Geografic plans Schematic plans Station figures Trend charts Specific figures Lists generator Import from GIS, SAP IS-U MMI OperatingProcess Data

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 15 Any Data is put in only once Data import from third-party systems Integrated total system, i.e. Highly efficient, faultless data engineering Extreme dynamics Consistent operation and visualization System integration Complete integration Static Data-Models for SCADA, Simulation, Optimization, etc. Shared real-time Database Integrative static Data-Model SCADA-Functions Simulation Optimization etc. Geografic plans Schematic plans Station figures Trend charts Specific figures Lists generator Import from GIS, SAP IS-U MMI OperatingProcess Data

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 16 Any Data is put in only once Data import from third-party systems Integrated total system, i.e. Highly efficient, faultless data engineering Extreme dynamics Consistent operation and visualization System integration Complete integration Static Data-Models for SCADA, Simulation, Optimization, etc. Shared real-time Database Integrative static Data-Model SCADA-Functions Simulation Optimization etc. Geografic plans Schematic plans Station figures Trend charts Specific figures Lists generator Import from GIS, SAP IS-U MMI OperatingProcess Data

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 17 System integration Common data handling All data stored in control system database - topology - technical data - figures Import of GIS data - cyclic incremental into control system database - objects keep their identity - pipes and network equipment - generation of geographic oriented figures Import of consumption data - cyclic incremental into control system database - annual consumptions from billing system

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 18 System integration Applications State estimation - adaption of the load model - calibration tool - determines current flow conditions in the network - information on locations without measurement is available

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 19 System integration Applications State estimation - adaption of the load model - calibration tool - determines current flow conditions in the network - information on locations without measurement is available Look ahead simulation - check network behaviour before a operation is carried out - determines network status for future load and switching szenarios - load forecasts and nominations are considered - improvement of operation mode

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 20 System integration Visualisation Indication - display of measured and/or calculated values - indication of discrepancies - indication of alarms Coloured network diagrams - flow - pressure - velocity - lots of others (diameter, subnet, age...) Flow arrows Bubble help for object informations Curves

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 21 Example scenarios Checking the supply status before taking the GDR station C78 out of service.

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 22 Initial flow status Example scenario: station C78 taken out of service

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 23 Flows - C78 out of service Example scenario: station C78 taken out of service reverse flow zero flow to C78

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 24 Pressures - C78 out of service Example scenario: station C78 taken out of service

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 25 Initial pressures Example scenario: station C78 taken out of service

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 26 Lp pressures - C78 out of service Example scenario: station C78 taken out of service

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 27 Example scenarios Determining the effects of closing hp valve SBN 778 SBN 778

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 28 Initial flow status Example scenario: closing hp valve SBN 778 SBN 778 B 6 B 8 B 7

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 29 Flows - SBN 778 closed Example scenario: closing hp valve SBN 778 SBN 778 B 6 B 8 B 7

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 30 Initial Feeding Example scenario: closing hp valve SBN 778 Feeding - SBN 778 closed

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 31 Velocities - SBN 778 closed Example scenario: closing hp valve SBN 778 SBN 778 Increased velocity B 6 B 7

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 32 24/7 Netze GmbH, Mannheim - quasi steady state district heating calculations - instationary / transient gas network calculations Stadtwerke Düsseldorf Netz GmbH, Düsseldorf - steady state gas network calculations - quasi steady state drinking water network calculations - quasi steady state district heating calculations Stadtwerke Duisburg Netzgesellschaft mbH, Duisburg - steady state gas network calculations - steady state drinking water network calculations NRM Netzdienste Rhein-Main GmbH, Frankfurt - instationary / transient gas network calculations HEAG Südhessische Energie AG, Darmstadt - steady state gas network calculations SWM Infrastruktur GmbH, München - instationary / transient gas network calculations E.ON Avacon Netz GmbH, Braunschweig - instationary / transient gas network calculations Stadtwerke Aachen AG, Aachen - steady state gas network calculations - steady state drinking water network calculations - quasi steady state district heating calculations References

© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 33 Assists operators of distribution networks State estimation calculates actual flow situation Look ahead simulation to test operations in advance Modular software design Different computing cores available Uniform data model Use of GIS data and consumption data Uniform user interface Easy to use simulation functions Powerful visualisation Summary Integrated online network calculations