IWR Ideen erden Realität LCG 3D CERN 13-14/09/2006 Andreas Motzke GridKa Database & Squid Status Andreas Motzke Research Center Karlsruhe (FZK)

Slides:



Advertisements
Similar presentations
Tony Doyle - University of Glasgow GridPP EDG - UK Contributions Architecture Testbed-1 Network Monitoring Certificates & Security Storage Element R-GMA.
Advertisements

GridKa May 2004 Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Installing dCache into an existing Storage environment at GridKa Forschungszentrum.
GridKa January 2005 Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Doris Ressmann 1 Mass Storage at GridKa Forschungszentrum Karlsruhe GmbH.
LCG Grid Deployment Board, March 2003 Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Status of GridKa for LCG-1 Forschungszentrum Karlsruhe.
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Torsten Antoni – LCG Operations Workshop, CERN 02-04/11/04 Global Grid User Support - GGUS -
CBPF J. Magnin LAFEX-CBPF. Outline What is the GRID ? Why GRID at CBPF ? What are our needs ? Status of GRID at CBPF.
Resistência dos Materiais, 5ª ed.
IWR Ideen werden Realität Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Institut für Wissenschaftliches Rechnen GridKa Database Services Overview.
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft gridKa Forschungszentrum Karlsruhe GmbH Institute for Scientific Computing P.O.
IWR Ideen werden Realität Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Institut für Wissenschaftliches Rechnen Status of Database Services.
GridKa SC4 Tier2 Workshop – Sep , Warsaw Tier2 Site Adam Padee ( ) Ryszard Gokieli ( ) Krzysztof.
Presented by: Yash Gurung, ICFAI UNIVERSITY.Sikkim BUILDING of 3 R'sCLUSTER PARALLEL COMPUTER.
Oracle Clustering and Replication Technologies CCR Workshop - Otranto Barbara Martelli Gianluca Peco.
Computing Resources Joachim Wagner Overview CNGL Cluster MT Group Cluster School Cluster Desktop PCs.
VMware Infrastructure Alex Dementsov Tao Yang Clarkson University Feb 28, 2007.
1 Recovery and Backup RMAN TIER 1 Experience, status and questions. Meeting at CNAF June of 2007, Bologna, Italy Carlos Fernando Gamboa, BNL Gordon.
1 RAL Status and Plans Carmine Cioffi Database Administrator and Developer 3D Workshop, CERN, November 2009.
BNL Oracle database services status and future plans Carlos Fernando Gamboa RACF Facility Brookhaven National Laboratory, US Distributed Database Operations.
Technology Expectations in an Aeros Environment October 15, 2014.
LCG 3D StatusDirk Duellmann1 LCG 3D Throughput Tests Scheduled for May - extended until end of June –Use the production database clusters at tier 1 and.
Fermilab Oct 17, 2005Database Services at LCG Tier sites - FNAL1 FNAL Site Update By Anil Kumar & Julie Trumbo CD/CSS/DSG FNAL LCG Database.
ASGC 1 ASGC Site Status 3D CERN. ASGC 2 Outlines Current activity Hardware and software specifications Configuration issues and experience.
Service Review and Plans Carmine Cioffi Database Administrator and Developer 3D Workshop, Barcelona (ES), April 2009.
CERN - IT Department CH-1211 Genève 23 Switzerland t Tier0 database extensions and multi-core/64 bit studies Maria Girone, CERN IT-PSS LCG.
GridKa SC4 Tier2 Workshop – Sep , Warsaw Tier2 Site.
 First, check if Windows Server 2008 minimum hardware requirements matches your computer hardware through link below
LCG-2 Plan in Taiwan Simon C. Lin and Eric Yen Academia Sinica Taipei, Taiwan 13 January 2004.
Workshop Summary (my impressions at least) Dirk Duellmann, CERN IT LCG Database Deployment & Persistency Workshop.
Manchester HEP Desktop/ Laptop 30 Desktop running RH Laptop Windows XP & RH OS X Home server AFS using openafs 3 DB servers Kerberos 4 we will move.
Atlas LCG 3D Oracle cluster migration strategy at BNL Carlos Fernando Gamboa On behalf of database group Grid Group, RACF Facility, Brookhaven National.
LFC Replication Tests LCG 3D Workshop Barbara Martelli.
KIT – The cooperation of Forschungszentrum Karlsruhe GmbH und Universität Karlsruhe (TH) Hadoop on HEPiX storage test bed at FZK Artem Trunov.
CERN - IT Department CH-1211 Genève 23 Switzerland t Oracle Real Application Clusters (RAC) Techniques for implementing & running robust.
KOLKATA Grid Site Name :- IN-DAE-VECC-02Monalisa Name:- Kolkata-Cream VO :- ALICECity:- KOLKATACountry :- INDIA Shown many data transfers.
Site Report --- Andrzej Olszewski CYFRONET, Kraków, Poland WLCG GridKa+T2s Workshop.
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Implementation of a reliable and expandable on-line storage for compute clusters Jos van Wezel.
HEP Computing Status Sheffield University Matt Robinson Paul Hodgson Andrew Beresford.
CERN Database Services for the LHC Computing Grid Maria Girone, CERN.
Computational Research in the Battelle Center for Mathmatical medicine.
CERN IT Department CH-1211 Genève 23 Switzerland t DBA Experience in a multiple RAC environment DM Technical Meeting, Feb 2008 Miguel Anjo.
Site Report: Prague Jiří Chudoba Institute of Physics, Prague WLCG GridKa+T2s Workshop.
LCG 3D Project Update (given to LCG MB this Monday) Dirk Duellmann CERN IT/PSS and 3D
GridKa Cloud T1/T2 at Forschungszentrum Karlsruhe (FZK)
BNL Oracle database services status and future plans Carlos Fernando Gamboa, John DeStefano, Dantong Yu Grid Group, RACF Facility Brookhaven National Lab,
Maria Girone CERN - IT Tier0 plans and security and backup policy proposals Maria Girone, CERN IT-PSS.
PIC port d’informació científica DateText1 November 2009 (Elena Planas) PIC Site review.
CNAF Database Service Barbara Martelli CNAF-INFN Elisabetta Vilucchi CNAF-INFN Simone Dalla Fina INFN-Padua.
Ole’ Miss DOSAR Grid Michael D. Joy Institutional Analysis Center.
GridKa December 2004 Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Doris Ressmann dCache Implementation at FZK Forschungszentrum Karlsruhe.
FroNtier Stress Tests at Tier-0 Status report Luis Ramos LCG3D Workshop – September 13, 2006.
Database CNAF Barbara Martelli Rome, April 4 st 2006.
PIC port d’informació científica Luis Diaz (PIC) ‏ Databases services at PIC: review and plans.
Status of tests in the LCG 3D database testbed Eva Dafonte Pérez LCG Database Deployment and Persistency Workshop.
Database Project Milestones (+ few status slides) Dirk Duellmann, CERN IT-PSS (
Digital Media SEAGF Somsak Sriprayoonsakul Thai National Grid Center
Dominique Boutigny December 12, 2006 CC-IN2P3 a Tier-1 for W-LCG 1 st Chinese – French Workshop on LHC Physics and associated Grid Computing IHEP - Beijing.
CERN - IT Department CH-1211 Genève 23 Switzerland t Service Level & Responsibilities Dirk Düllmann LCG 3D Database Workshop September,
Database Requirements Updates from LHC Experiments WLCG Grid Deployment Board Meeting CERN, Geneva, Switzerland February 7, 2007 Alexandre Vaniachine (Argonne)
Oracle Clustering and Replication Technologies UK Metadata Workshop - Oxford Barbara Martelli Gianluca Peco.
Brief introduction about “Grid at LNS”
Dirk Duellmann CERN IT/PSS and 3D
Installing Windows Server 2008
LCG 3D Distributed Deployment of Databases
3D Application Tests Application test proposals
LCG 3D and Oracle Cluster
Conditions Data access using FroNTier Squid cache Server
Scalable Database Services for Physics: Oracle 10g RAC on Linux
Oracle Storage Performance Studies
Scalable Database Services for Physics: Oracle 10g RAC on Linux
Presentation transcript:

IWR Ideen erden Realität LCG 3D CERN 13-14/09/2006 Andreas Motzke GridKa Database & Squid Status Andreas Motzke Research Center Karlsruhe (FZK) Germany

IWR Ideen erden Realität LCG 3D CERN 13-14/09/2006 Andreas Motzke Squid Hardware (in Operation) 2 Squid nodes for CMS: 2 TOOLTEC machines –AMD Dual Opteron 246 (2 GHz) –2 GB RAM –80 GB hard disk Servers & IPs: f e.gridka.deextern IP: GridKa IP: f e.gridka.deextern IP: GridKa IP:

IWR Ideen erden Realität LCG 3D CERN 13-14/09/2006 Andreas Motzke Squid CMS Activities

IWR Ideen erden Realität LCG 3D CERN 13-14/09/2006 Andreas Motzke DB Hardware (in Operation) 2 RACs: 2-node-Cluster for ATLAS & 2-node-Cluster for LHCb 2x 2 IBM x336 machines –Intel Xeon dual 3.2 GHz w/ 2MB L2 cache –4 GB RAM –73 GB U320 hard disk QLogic HBA (database on SAN) 2x 2x548GB on StorageTEK DS280 connected by IBM INRANGE FC9000 ExperimentDB namenode1SID1node2SID2ClusterService ATLASLCGDB1f LCGDB11f LCGDB12LCGDB1crs LHCbLCGDB2f LCGDB21f LCGDB22LCGDB2crs

IWR Ideen erden Realität LCG 3D CERN 13-14/09/2006 Andreas Motzke DB status Manpower –1 DBA ( –1 DBA (just – Streams –tests with ATLAS and LHCb done Problems –memory settings – solved by reducing streams_pool_size ORA-04031: unable to allocate 16 bytes of shared memory ("shared pool","select obj#,type#,ctime,mtim...","sql area","kglhin: temp") –ORA-Messages unresolved ORA-10388: parallel query server interrupt (failure) WARNING: inbound connection timed out (ORA-3136) To do –scheduled backup –OEM agent installation for own Grid Control –check parameter settings (sga_target ?)