ENGINEERING, SUPPLY & CONSTRUCTION COMPANY

Slides:



Advertisements
Similar presentations
PressureGuard Module One - Introduction.
Advertisements

Demand Response in Ontario Paul Grod, CEO, Rodan Energy July 11, 2013.
Module 3: Transportation and Transfer of Ethanol-Blended Fuels
APPA CEO Roundtable Phoenix, AZ March 15, 2011
FLUID BED GRANULATION SWITCH CABINET MANUFACTURER : GLATT AG
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Unit C: Agricultural Power Systems
FUEL SUPPLY SYSTEM.
Wood to Warmth – Case Studies Alison Wilshaw, TV Energy 16 February,
Report to TACIR on Underground Utility Damage Prevention in Tennessee
Environmental Leadership The Pursuit of Cleaner Air
Who Wants To Be A Millionaire?
Welcome to Who Wants to be a Millionaire
1 Copyright Copyright 2012.
PT. ESTU ARTHA LANCAR Engineering , Supplies & Construction Company
Commissioning Approach Integrated Service Solutions
Electrical & Instrument Construction Department
$100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400.
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
Peco Facet Sewage Water Treatment Plant
Peco Facet Sewage Water Treatment Plant
Analyzing Transactions
October 22, 2010; Tallinn, Estonia Cosimo Garofalo III ESTONIAN NUCLEAR POWER CONFERENCE.
MEP201 Mechanical Engineering Drawing 1st semester
SCHH Computer Club Treasurers Report February 8, 2007.
Solid level measurement
Rich Paglia Vice President
Power Plant Construction and QA/QC Section 2.3– Steam Generators
Thermal Mass Flow Meters Market and applications.
LCW Upgrades Update Booster Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions were.
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
Preferred Utilities Manufacturing Corp.
0 Opportunities under the New Law Peter Roberts Adam Summerly Pipeline M&A in Indonesia.
Michael Hopkins Assistant Chief, Permitting Ohio EPA Air Permitting for Oil & Gas Well Sites.
Gas Quality E.ON Gastransport SIMONE Congress 2008, Dubrovnik Jörg Bödeker, Dr. Dietrich Weise.
1 Natural Gas Transmission within Romanian Gas Market BLACK SEA ENERGY CONFERENCE 3-5 April 2006, Bucharest, Romania.
Seoul,South Korea February  Scope of high technology-based industry  Fact and Figures  Business opportunity  Closing Remarks.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
1 Lincolnshire Research Observatory Lincolnshire’s Changing Population Components of Change and the Demographic Impact Eleanor.
Green Completions Lessons Learned from Natural Gas STAR Producers Technology Transfer Workshop ExxonMobil Production Company, American Petroleum Institute.
PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, DECEMBER 2010.
Charging at 120 and 240 Volts 120-Volt Portable Vehicle Charge Cord 240-Volt Home Charge Unit.
Chapter 12 Lesson Goal After completing this lesson, the student shall be able to make hydrant connections and draft from a static water source according.
10/12/ Vacuum Regulator Gas Feed Systems: Theory and Maintenance Thom DiGeronimo OperatorSchool.Com.
Thorsten Brümmer Gas quality and interoperability Hannover, 23/04/2013.
Equal or Not. Equal or Not
EnvironmentEnvironnementCanada Nusa Dua, Bali, Indonesia September 5 – 7, Part 4: LFG Utilization.
Januar MDMDFSSMDMDFSSS
PT. REKAYASA CAKRAWALA RESOURCES
QUALITY MANAGEMENT AGA – BEST PRACTICE ROUNDTABLE Sara Peralta, Director – Quality & Improvement Philadelphia February, 2013.
Hydronic Balancing Balancing Valves
ADVANTAGES Water savings Crop response Labour savings Fertilizer savings Less weed growth Drip Irrigation System Layout & Design.
© PSI AG, Stadtwerke Düsseldorf GmbH 2008 SimoneCongress 2008, sheet 1 Online simulation of gas distribution networks Peter Aymanns, Stadtwerke Düsseldorf.
Komunitas Migas Indonesia Swastioko Budhi Suryanto – Ketua Umum KMI.
Логотип Smart Engineering Group Smart Engineering Group.
Transportation Strategy SCMN 4780 Modal Analysis: Pipeline.
LNG Liquefaction, Storage & Delivery Prefabricated & Manufactured M&R Facilities & Lateral Interconnects Complete Solutions for Natural Gas, LNG,Gas Storage,
1 Packaging bio- methane connections for the future Dan Anderson CEng 11 th January 2012.
FOR APRIL 2013 THE REHABILITATION AND EXPANSION OF CENTRAL OGBIA WATER PROJECT,AT BAYELSA STATE SITE REPORT FOR NOVEMBER 2013.
IRAQ’s OIL POLICY (2008 – 2017) Presented by: ENG. AHMED ALSHAMMA Deputy Oil Minister IRAQ.
At the Ballarat City Gate Construction and Commissioning of a Shell and Tube Heat Exchanger Speaker: Godwin Wong.
By Muslim Sejong University
SDEM ERECTORS NIGERIA LIMITED
Presentation transcript:

ENGINEERING, SUPPLY & CONSTRUCTION COMPANY PT. ESTU ARTHA LANCAR ENGINEERING, SUPPLY & CONSTRUCTION COMPANY

COMPANY PT. Estu Artha Lancar 4/8/2017 COMPANY Company Name : PT. Estu Artha Lancar Head Office : Jl. Bangka I no. 4A Lt.2, Pela Mampang, Jakarta Selatan, Indonesia, 12720 Phone : (62.21) 32151718 Fax : (62.21) 7201270 PT. ESTU ARTHA LANCAR PT. ESTU ARTHA LANCAR

COMPANY REGISTRATION Akte Pendirian Akte Perubahan Pengesahan SIUP Nomor : 102 Tanggal : 16 April 1993 Notaris : Ny. SP Henny Shidky SH Akte Perubahan Nomor : 3 Tanggal : 11 Oktober 2006 Notaris : Hj. Suzie FH. Tadjoedin SH Pengesahan Nomor : W7-06282 HT.01.04 – th 2007 Tanggal : 07 Juni 2007 Instansi : Dept, Hukum dan HAM SIUP Nomor : 00714 / 1.824.271 Tanggal : 27 Februari 2007 Instansi : Dinas Perindag Pemda DKI Jakarta NPWP Nomor : 01.620.462.0-014.000 PT. ESTU ARTHA LANCAR

MANAGEMENT UTORO WREKSOATMODJO, SE IR. EMIL JUDO RAHARDJO COMMISSIONER UTORO WREKSOATMODJO, SE PRESIDENT DIRECTOR IR. EMIL JUDO RAHARDJO DIRECTOR NOVITA WREKSOATMODJO, SE PT. ESTU ARTHA LANCAR

ENGINEERS PROCESS ENGINEER 2 person(s) PIPING & MECHANICAL ENGINEER CIVIL ENGINEER 4 person(s) PIPELINE ENGINEER 2 person(s) HSE ENGINEER 1 person(s) ELECTRICAL & INSTRUMENTATION ENGINEER 3 person(s) TELECOMMUNICATION ENGINEER 1 person(s) QA/QC ENGINEER 1 person(s) CONSTRUCTION ENGINEER 2 person(s) CONTRACT ADMIN & PROGRESS 2 person(s) PT. ESTU ARTHA LANCAR

EXPERIENCES ENGINEERING (2006 – 2007) OFFSTAKE STATION INSTALLATION PERUSAHAAN GAS NEGARA SOUTH SUMATRA – WEST JAVA 4 PIPELINE ONSHORE PROJECT, 32 KM 24” GAS ONSHORE PIPELINE, MUARA BEKASI TO RAWA MAJU (2007) LPG PLAN FLOW LINE SYSTEM PHASE 1, GRESIK LPG TANK & LOADING SYSTEM PHASE 1, GRESIK (2007 – ONGOING) EHTYLENE GAS RECEIVING SYSTEM PROJECT PT. STYRINDO MONO INDONESIA, CILEGON TTU TUBAN PERTAMINA PROJECT, 120 KM 18” FUEL ONSHORE PIPELINE, TUBAN TO SURABAYA (2008 – ONGOING) KAMBUNA ONSHORE PIPELINE AND MODULE-1 ONSHORE RECEIVING FACILITIES GUNUNG MEGANG SINGA GAS BOOSTER PIPELINE PROJECT PT. ESTU ARTHA LANCAR

EXPERIENCES SUPPLY CONSTRUCTION (2007) LPG PLAN FLOW LINE SYSTEM PHASE 1, GRESIK LPG TANK & LOADING SYSTEM PHASE 2, GRESIK (2008) PT. STYRINDO MONO INDONESIA’s Y-STRAINER(s) CONSTRUCTION (2007 - ONGOING) LPG TANK & LOADING SYSTEM PHASE 1, GRESIK PT. ESTU ARTHA LANCAR

PROJECT PROFILE Project Title : “OFFTAKE STASION INSTALLATION” The custody transfer station for gas supplies from TGI (Transgasindo) into PGN Natural Gas Riau Distribution Network. ESTU provides the following services : Project Management Detailed Design Construction Commissioning As-built Hand over Documentation Profile : Fiscal Metering Station included : First Filtration, Inlet Filters, Meters (Ultrasonic), Chromatographs, Analyzers, Control Valves, Regulators, Odorize, Corrosion Inhibitor, Process Pipe work, Venting Pipe work, Instrumentation and Controls, Scada, Switchboards, Diesel Generators, and Transformers. Buildings included : Administration, Control Room, Fire Station, Utilities, Metering Shelter, Analyzer Shelter and Guard House. Capacity : Up to 150 MMSCFD Client : PT. YUAN SEJATI PT. ESTU ARTHA LANCAR

PROJECT PROFILE Project Title : “LPG PLANT FLOW LINE SYSTEM PHASE 1” The Network. ESTU provides the following services : Project Management Detailed Design Procurement / Material Supplies Construction Commissioning As-built Hand over Documentation Profile : Fiscal Metering Station included : First Filtration, Inlet Filters, Meters (Orifice), Chromatographs, Analyzers, Control Valves, Regulators, Process Pipe work, Venting Pipe work, Instrumentation and Controls Capacity : Up to 40 MMSCFD Client : PT. MEDIA KARYA SENTOSA PT. ESTU ARTHA LANCAR

PROJECT PROFILE Project Title : “LPG TANK & LOADING SYSTEM PHASE 1” The Network. ESTU provides the following services : Project Management Detailed Design Procurement/ Material Supplies Construction Commissioning As-built Hand over Documentation Profile : Fiscal Metering Station included : Tank System, Flare Header System including Flare Sub-system, Loiading Facilities, Flare Stack, Tank gauging System, Pump Syatem, Instrumentation and Control System Capacity : Up to 40 MMSCFD Client : PT. MEDIA KARYA SENTOSA PT. ESTU ARTHA LANCAR

PROJECT PROFILE Project Title : “SOUTH SUMATRA – WEST JAVA GAS PIPELINE ONSHORE PROJECT” PERUSAHAAN GAS NEGARA SOUTH SUMATRA – WEST JAVA GAS PIPELINE ONSHORE PROJECT, 30 KM 32” GAS ONSHORE PIPELINE, MUARA BEKASI TO RAWA MAJU. ESTU provides the following services : Detailed Design Procurement Assistance Construction Engineering As-built Hand over Documentation Profile : Pipeline included : Pipeline Detailed Engineering consists of: 4 Block Valve Station, River and Road Crossings, Anchor Blocks, Cathodic Protection System Capacity : Up to 400 MMSCFD Gas Client : PT. CITRA PANJI MANUNGGAL PT. ESTU ARTHA LANCAR

PROJECT PROFILE Project Title : “EHTYLENE GAS RECEIVING SYSTEM PROJECT” EHTYLENE GAS RECEIVING SYSTEM PROJECT PT. STYRINDO MONO INDONESIA, CILEGON ESTU provides the following services : Detailed Design Procurement Assistance Construction Engineering Commissioning As-built Hand over Documentation Fitting Supplies (Variation Order) Profile : Compressor included : Comppressor Units, First Filtration, Inlet Filters, Coriolis Meters, Chromatographs, Analyzers, Control Valves, Regulators, Process Pipe work, Venting Pipe work, Instrumentation and Controls. Capacity : Up to 45 Psi of Ethylene Gas Client : PT. CITRA PANJI MANUNGGAL PT. ESTU ARTHA LANCAR

PROJECT PROFILE Project Title : “TTU TUBAN PERTAMINA PROJECT” TTU TUBAN PERTAMINA PROJECT, 136 KM 16” FUEL ONSHORE PIPELINE, TUBAN TO SURABAYA ESTU provides the following services : Detailed Design Project Management Procurement Assistance Construction Engineering As-built Hand over Documentation Profile : Pipeline included : Pipeline Detailed Design consists of: 2 HDD, 13 Block Valve, Road and River Crossings, Swamp Area, Anchor Blocks, Cathodic protection System Capacity : 15,000 barrel / day Client : PT. CITRA PANJI MANUNGGAL for PERTAMINA PT. ESTU ARTHA LANCAR

PROJECT PROFILE Project Title : “KAMBUNA ONSHORE PIPELINE AND MODULE-1 ONSHORE RECEIVING FACILITIES” KAMBUNA PROJECT, 57 KM OFFSHORE TO ONSHORE PIPELINE, GELAGAH KAMBUNA ESTU provides the following services : Electrical and Instrumentation Detailed Design Hand over Documentation Profile : Electrical and Insturmentation included : Pressure Transmitter, Pressure Indicator, Temperature Transmitter, Temperature Indicator, Pressure Control Valve, Silenoid Valve, Pressure Safety Valve, Corrosion Coupon, Corrosion Probe, Pig Signal, Electrical Grounding, Electrical Lighting, Tubing Layout. Client : PT. CITRA PANJI MANUNGGAL for ASIA PETROLEUM DEVELOPMENT PT. ESTU ARTHA LANCAR

PROJECT PROFILE Project Title : “GUNUNG MEGANG SINGA GAS BOOSTER PIPELINE PROJECT” GUNUNG MEGANG SINGA GAS BOOSTER PIPELINE PROJECT, 17,5 KM ONSHORE. ESTU provides the following services : Detailed Design Procurement Assistance Construction Engineering As-built Hand over Documentation Profile : Compressor and Pipeline included : Comppressor Units, Control Valves, Process, Pipeline Detailed Design, Instrumentation and Controls, Electrical and Civil Works. Client : PT. CITRA PANJI MANUNGGAL for MEDCO ENERGY PT. ESTU ARTHA LANCAR

PROJECT PROFILE Project Title : “PROJECT MANAGEMENT – TTU TUBAN” TTU TUBAN PERTAMINA PROJECT, 136 KM 16” FUEL ONSHORE PIPELINE, TUBAN TO SURABAYA ESTU provides the following services : ManPower Supplies Client : PT. CITRA PANJI MANUNGGAL for PERTAMINA PT. ESTU ARTHA LANCAR

PROJECT PROFILE Project Title : “PROJECT MANAGEMENT – JAMBI MERANG PIPELINE PROJECT” JAMBI TO MERANG PIPELINE PROJECT, SUMATRA ESTU provides the following services : ManPower Supplies Client : PT. CITRA PANJI MANUNGGAL for Amerada Hess PT. ESTU ARTHA LANCAR

Resources Software PROCESS software Hysis PIPING & MECHANICAL software Caesar, Pvelite PIPELINE software Autocad PDMS CIVIL software SAP ELECTRICAL & INSTRUMENTATION software Etap, InstruCal PT. ESTU ARTHA LANCAR

UNTUK PERIODE YANG BERAKHIR 31 DESEMBER 2006 DAN 30 JUNI 2007 FINANCIAL REPORT PT ESTU ARTHA LANCAR LAPORAN LABA RUGI UNTUK PERIODE YANG BERAKHIR 31 DESEMBER 2006 DAN 30 JUNI 2007 Cat 2007 2006 PENDAPATAN BEBAN OPERASIONAL 10 11 1.655.897.143 (1.547.833.977) 2.157.768.367 (2.033.743.575) LABA OPERASI 108.063.166 12.024.792 PENDAPATAN DAN BEBAN NON OPERASIONAL 12 2.207.842 3.807.842 LABA BERSIH SEBELUM PAJAK 110.271.008 127.832.634 TAKSIRAN PAJAK 13 (13.783.800) (16.034.300) LABA BERSIH SETELAH PAJAK 96.487.208 111.798.334 PT. ESTU ARTHA LANCAR

FINANCIAL REPORT PT ESTU ARTHA LANCAR NERACA PER 31 DESEMBER 2006 DAN 30 JUNI 2007 AKTIVA CAT 2007 2006 KEWAJIBAN DAN EQUITAS AKTIVA LANCAR Kas dan setara kas Piutang Dagang Proyek dalam pelaksanaan 3 4 5 353.009.369 5.400.000 249.455.739 292.420.844 10.540.000 197.295.677 KEWAJIBAN JANGKA PENDEK Hutang Dagang Hutang Pajak 7 8 2.000.000 13.783.800 674.000 17.741.025 Jumlah Aktiva Lancar 607.865.108 500.256.521 Jumlah Kewajiban Jangka Pendek 15.783.800 18.415.025 AKTIVA TIDAK LANCAR Aktiva Tetap – Nilai Bersih setelah dikurangi penyusutan 6 124.880.729 138.633.333 EQUITAS Modal Saham – Modal Dasar 5000 Saham @ Rp. 100.000 ditempat dan disetor penuh SALDO LABA 9 500.000.000 216.962.037 120.474.829 Jumlah Aktiva Tidak Lancar Jumlah Ekuitas 716.962.037 620.474.829 JUMLAH AKTIVA 732.745.837 638.889.854 JUMLAH KEWAJIBAN DAN EQUITAS 638.889.845 PT. ESTU ARTHA LANCAR

UNTUK PERIODE YANG BERAKHIR 31 DESEMBER 2005 DAN 2006 FINANCIAL REPORT PT ESTU ARTHA LANCAR LAPORAN LABA RUGI UNTUK PERIODE YANG BERAKHIR 31 DESEMBER 2005 DAN 2006 Cat 2006 2005 PENDAPATAN BEBAN OPERASIONAL 10 11 2.157.768.367 (2.033.743.575) 223.535.416 (214.218.890) LABA OPERASI 12.024.792 9.316.526 PENDAPATAN DAN BEBAN NON OPERASIONAL 12 3.807.842 323.969 LABA BERSIH SEBELUM PAJAK 127.832.634 9.640.495 TAKSIRAN PAJAK 13 (16.034.300) (964.000) LABA BERSIH SETELAH PAJAK 111.798.334 PT. ESTU ARTHA LANCAR

FINANCIAL REPORT PT ESTU ARTHA LANCAR NERACA PER 31 DESEMBER 2005 DAN 2006 AKTIVA CAT 2006 2005 KEWAJIBAN DAN EQUITAS AKTIVA LANCAR Kas dan setara kas Piutang Dagang Proyek dalam pelaksanaan 3 4 5 292.420.844 10.540.000 197.295.677 273.276.065 - 125.755.939 KEWAJIBAN JANGKA PENDEK Hutang Dagang Hutang Pajak 7 8 674.000 17.741.025 422.760 964.000 Jumlah Aktiva Lancar 500.256.521 399.032.004 Jumlah Kewajiban Jangka Pendek 18.415.025 1.386.760 AKTIVA TIDAK LANCAR Aktiva Tetap – Nilai Bersih setelah dikurangi penyusutan 6 138.633.333 111.031.251 EQUITAS Modal Saham – Modal Dasar 5000 Saham @ Rp. 100.000 ditempat dan disetor penuh SALDO LABA 9 500.000.000 120.474.829 8.676.495 Jumlah Aktiva Tidak Lancar Jumlah Ekuitas 620.474.829 508.676.495 JUMLAH AKTIVA 638.889.854 510.063.255 JUMLAH KEWAJIBAN DAN EQUITAS 638.889.845 PT. ESTU ARTHA LANCAR